HomeMy WebLinkAbout22-100630-Landscape Plans-02-10-2022-V12'' IodgepoI tr stakes 8 Ioniino driver into undisturb grou Stain brown Water basin with Planting pit twice s ze o I, E 'SiAII TREE PLANTING DETAIL No Scale SHRUB PLANTING DETAIL No Scale Prune diseased and broken branches 'Choinlock'' or eopol tree tie material (I'' width); nail or staple tree tie to hold vertically, loop each tie around half tree loosely to provide I'' slack for trunk growth Unglazed planting pit su ace 1/2 topsoil, 1/2 native soil, water thoroughly, fertilize )no diseased and ken branches ter basin with Planting be mulch 2" mulch m acted topsoil t ,r thoroughly, -tilize as read intin hole min. ce ,ze of root ball I/2 spacing distance Note: I. installation includes removal of stakes one year after installation. 2. Adjust tree ties during establishment to allow for groNth. GROUND COVER SPACING DETAIL No Scale- Triangular Spacing NOTES I. Subgrades, including berms, to within I 1/I0th foot provided by Oeneral Contractor unless otherwise noted. 2. Subgrade shall be scarified or rototilled if conditions reopire. 3 4'' depth 3-Nay topsoil or copal in all planting areas. 4. 2'' depth fine grade bark mulch in all planting beds. 5. All plant material shall be healthy, full and conform to USA standard nursery stock, latest edition. 6. Plant material or size or kind not available may be substituted only with approval of Landscape Architect or Owner. i. All mass plantings shall have triangular spacing. 8. All tree pits shall be inspected to insure proper drainage. �. Positive drainage shall be maintained. Mound planting areas minimum 6'' IO. Landscape Contractor shall maintain site until final inspection and acceptance by ONner. PLANT LIST 50TAN I CAL / COMMON * OUANT I T1' SIZE CONDITION cer rubrum 'October Olory'/ 6 2'' cal 5�5 ctober Olory Red Maple yrus caller�yana 'Chanticleer' / 2 Chonticleer Poor Pinus flexis Vandewolf's Pyramid'/ 5 i' min. E3$5 Vandewolf's Pyramid Pine Tsuga mertensions Mountain hemlock Thujo plicato 'Emerald Green/ 6 6' min 5� E3 Emerald Oreen Arborvitae Rhododendron .Jean II 2-7" min full 4 bushy Marie de Montegue Mshonis ac[uilfolium / 45 5 gallon full � bushy Oregon Orope Nondino domestics 'Moon 5sy'/ Moon Say Heavenly Bamboo 25 2 gallon full $ bushy Prunus L. 'Otto Luyksn' / 33 2 gallon full 4 bushy (D Otto Luyken laurel O Pinus mueo Pumillio / 20 2 gallon full $ bushy Dwarf Mueo Pins E3uxu5 microphylla 'Winter Oem' / 2i 24'' min full 4 bushy Winter Oem 56xwood Erics Cornea '<romers Red' / 4`1 1 gallon full 4 bushy Heather 4rcto5taphylos uva-ursi / 4" pots full kinflickinnik I�" ® c * Confirm all plant cpantities SOUTH 54�5TH STREET EXISTINO TREE TO E3F---\ REMOVE® REMOVE ALL EXISTINO LANN 5' GHAIN LINK FENGE LANID5CAF FLAIL Fu--L---j 0 E�' 1�' 332' �OLO0"r LOCK ,ALL EXISTINO GEDAR TREES STINO BAR _ES KISTINO -DAR RIEES 0 0 0 0 N o 0 �, o N 0 -0 -0 U I� Z T K LLJ LLJ LL LL T- U cD Ij M zo = 00 LLJ Q Zz z o�a W � N 0. HNC Q w� W N YF ?ice G� W g �Q W CO WU CO AW-� I E 0 � W � o Q CO NW W o E W U z Q o N J Sheet LANDSCAPE PLAN ish grade/ Top of mulch �:)-Up sprayy sprinkler Plastic MPR nozzle -Inch male NPTx .4010 Inch ^b Elbow Nipple or Funny Pipe G Schedule 40 Tee or Ell -Inch male NPT x Inch -b Elbow r-vG Lateral Pipe POP-UP SPRAY SPRINKLER No Scale Select remove debris sharp c PVG (:,lc sleevinc size of /YA'lINNON/7/ONNOHNONNOHNONNOHNO —III—III—III—III=III �ackfill,=IIIIIII ° � 11=III=III= IIIIIIIIIIIIIIIII rocks, =1 III=III=III and 1=III ° 11=III=III= I �=1TI=1TI I 1=1TI: 11=1TI=1TI i i=i T i=i T i ° II1=1TI: 11=1TI: 155200 II =1 I I: tWlce m III= pipe Lateral or Mainline SLEEMNG DETAIL No Scale Junction box " pvc schedu to power supl Gontroller per irrigation schedule " pvc schedule 40 lnduit and fittings l Aes to remote controle valves WALL MOUNT CONTROLLER No Scale Finished grade Select backfill, remove rocks, debris and sharp objects PVG Glass 200 Lateral Ill PVC Schedule 40- o Mainline \--­% Valve Wires TRENCHING DETAIL No Scale Pressure Reducing Valve, if required Cate Valve Ouick Coupler Valve F Master Valve, if required for winter blowout X X PVG Mainline '*'--Double �Double Check Valve Stub out from Domestic Meter, or separote irrigation meter POINT OF CONNECTION No Scale IRRIGATION SCHEDULE SYMR01 DFSCRIPTION RADIUS CPM PSI F 3Q H Q RAINBIRD 1&00 MPR 15' SERIES POP-UP, 4" LAWN, ro" G.G. 15' 1.85H 30 Do �Io �o RAINBIRD 1800 MPR 12' SERIES POP-UP, 4" LAWN 6'' G.G. 12' 1.30H 30 r1 7�1 717 F7 O n IN = 1/71l =>/'): I I>= A I Al INI ' II /_ /' 1/71l "n ZQI I 2/T oqFrN oo El ZI RAINBIRD 1300 MPR S' SERIES POP-UP, 4" LAWN, ro" G.G. RAINBIRD 1000 MPR 5' SERIES POP-UP, 4" LAWN ro" GC RAINBIRD 1800 MPR SIDE STRIP POP-UP, 4" LAWN ro" GC RAINBIRD 1800 MPR END STRIP POP-UP, 4" LAWN ro" GC RAINBIRD PEB SERIES PLASTIC VALVES S' 0.52 H 30 5' 0.2H 30 4'X30' 1.21 30 41X15' O.ro1 30 RAINBIRD E5P-M3 CONTROLLER POINT OF CONNECTION: 3/4'' IRRIGATION METER 3/4" FEBCO 85O DOUBLE CHECK VALVE 1" QUICK COUPLER VALVE I STATION 2-1 GPM 1-1/4'' MAINLINE, PVG SCHEDULE 40 LATERAL LINE, PVC CLASS 200.1" MINIMUM SLEEVING, PVC CLASS 200 o CONFIRM EXACT LOCATION OF P.O.C., CONTROLLER, AND WATER PRESSURE AT P.O.G. o ALL VALVES IN 'AMETEK' OR 'CARBON' BOXES SET AT FINISHED GRADE. o ALL WORK PER PLANS, LOCAL CODES AND MANUFACTURER'S SPECS. o PRESSURE TEST BEFORE BACKFILLING. o PLAN IS DIAGRAMMATIC, ADJUST LINE AND HEAD LOCATIONS AS NECESSARIT' TO ASSURE PROPER COVERAGE AND CONFORM WITH ACGEPTED CONSTRUCTION PRACTICES, SOUTH 54�5TH STREET 8.� IIGAT ON FLAN Fu-l---j 0 E� I I r,� 1 32' Q) 0 Q) O N O � Q)O N 0 -0 -0 U Z T K LU LU LL UL T- � U M cD M zo = o�� QZLL1 a z � N 0.W a HNC Q wLL- NaW N YF ?ice G� W g Ld 00 CO WU CO AW-� I E 0 � w � o Q CO Nw W o E W U i~ z Q o N J Sheet IRRIOATION PLAN L � 2