HomeMy WebLinkAbout22-100630-Preliminary TIR-02-10-2022-V1PRELIMINARY
TECHNICAL INFORMATION REPORT
BigFoot Java Federal Way
803 S 348th St, Federal Way, Washington 98003
Prepared for:
Steve Davis
6124 Panorama Dr NE
Tacoma, WA 98422
253.606.5586
Prepared by:
Kristen Orndorff, PE
KWO Engineering, PLLC
4505 915t Ave SE
Mercer Island, WA 98040
kristen@kwoeng.onmicrosoft.com
206.755.3951
January 14, 2022
Table of Contents
Section 1 - Project Overview.........................................................................................................................3
Section 2 — Conditions and Requirements Summary...................................................................................6
Section3 — Offsite Analysis...........................................................................................................................
7
Task 1. Study Area Definition and Maps..................................................................................................7
Task2. Resource Review..........................................................................................................................8
Task3. Field Inspection............................................................................................................................8
Task 4. Drainage System Description and Problem Descriptions............................................................8
Task 5. Mitigation of Existing or Potential Problems...............................................................................8
Section 4 — Flow Control, Low Impact Development (LID) and WQ Facility Analysis and Design ..............10
Existing Site Hydrology (Part A)..............................................................................................................10
Developed Site Hydrology (Part B)..........................................................................................................10
Performance Standards (Part C).............................................................................................................10
Flow Control System (Part D)..................................................................................................................13
Water Quality System (Part E)................................................................................................................13
Section 5 — Conveyance System Analysis and Design.................................................................................14
Section 6 — Special Reports and Studies.....................................................................................................15
Section7 — Other Permits...........................................................................................................................15
Section 8 — CSWPP Plan Analysis and Design..............................................................................................16
ESC Plan Analysis and Design (Part A).....................................................................................................16
SWPPS Plan Design (Part B)....................................................................................................................19
Section 9 — Bond Quantities, Facility Summaries, and Declaration of Covenant.......................................19
Section 10 — Operations and Maintenance Manual...................................................................................19
AppendixA —TIR Worksheet (Figure 1)......................................................................................................20
Appendix B — Geotechnical Report.............................................................................................................21
AppendixC — WWHM.................................................................................................................................22
AppendixD — Engineering Plans.................................................................................................................23
Appendix E — Operations and Maintenance Manual..................................................................................24
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 2 January 2022
Section 1 - Project Overview
The site is located at 803 S 3481h St, Federal Way, WA 98003 (see Figure 1 below) and
encompasses one King County parcel: 2021049087. The approximately 0.57 ac lot is zoned CE
and bordered by S 348th St to the north, King County Metro Transit South Federal Way Park and
Ride to the east and south and City of Federal Way West Hylebos Wetland Park to the west.
At one point, the property had a single-family residence, which has since been removed. Some
improvements were constructed as part of a previously approved development for a car wash
facility that was never completed. Those improvements included a retaining wall, grading, base
course, fencing and storm outfall. The site is predominantly gravel with some vegetation at the
perimeter. A wetland buffer is located on the southwestern corner of the lot. Access to the site
is taken from S 348th Street.
The TIR Worksheet is included as Figure 1 in Appendix A of this report.
� aims oermata9gy Q �� � u„ae
Federal We""`
G
academy ti Qnal;y he
` 1 - Rejua "ta Chnl,® Jl
Federal way L.aer
u�
Federal Way CSOO
B SurgeonsQ 53Qgi�w
NoT.—B Wellness
A Small Animal ] Eleeen O Taco bell
N
kospital V
)dnrh St
-
°�—
3
S 348th St 5348th St S 348th St S 348th
NTS
w
5 348th St SE
-
VCA Panther Lake
Animal Hospit..
O
West kylebos
Wetlands Par4
903 5 348th St,
Federal Way, WA 98003 Burger King C
Precious Nails and ODay, Inn by Wyndham Sport Clips kai
Federal Way
Spa Salon Q a Fed-.
8
� Jimm®aCs
. F: _ �nad'honse
Blue Mend
d Roll le 1QHO e, Teriyaki Wok
ofh�e oepae
O
o
L
v
- Ameri<Machinery Corp O e tma� War ''rye a —
✓r Nnte
2 s sslz! sI
.4
Qa 1
Ban So Tum I—, Thai v
!! 5352ne sisi�r
/
Hylot?05 Wetlands:
Z �_� /�
Figure 2 — Site Location
The project will construct a new drive-thru coffee stand and associated improvements, including
drive aisles, parking, trash enclosure, lighting, pedestrian plaza and utilities. Existing onsite
improvements, including the retaining wall, most fencing, and the stormwater outfall will remain.
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 3 January 2022
Stormwater currently sheet flows to the west, discharging to the City's West Hylebos Wetland
Park (see Figure 3 below). This flow path will be maintained, and the proposed stormwater
facilities will discharge to the existing flow spreader outfall near the west property line. The
project will also construct some offsite street improvements, including curb and gutter, sidewalk,
planter and driveway apron in the S 348t" St right-of-way.
M
;gym
S 348tn St — IT"
UL
h Nl SITE
h77,
4 � a •m
• - _77��ii��
.,. 4y K i4
M •y 1
Figure 3 — Drainage Basins, Subbasins, and Site Characteristics
According to the USDA NRCS Web Soil Survey (see Figure 4), the northern portion of the site and
the southeast corner is underlain with Everett-Alderwood gravelly sandy loams, 6 to 15 percent
slopes. The southern portion of the site is underlain with Seattle muck. Site soils are further
discussed in the geotech report, which is included in the Appendix.
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 4 January 2022
0 -�
i
Figure 4 — Soils
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 5 January 2022
Section 2 - Conditions and Requirements Summary
Drainage review is required per FWRC 16.15.010 because the project adds 2,000 square feet or
more of new plus replaced impervious surface. Drainage review requirements for this project
are based on the 2016 King County Surface Water Design Manual (KCSWDM) and the City of
Federal Way Addendum (January 8, 2017). Projects subject to Title 16 shall determine water
quality and stormwater review requirements using Section 1.1.1.A (Step 3) and 1.1.1.B (Step 4)
of the addendum.
The project is a new development with over 2,000 square feet of new impervious surface,
therefore Water Quality Review (Core Requirement #8) is required per Step 3 and Stormwater
Review is required per Step 4. Finally, per KCSWDM Section 1.1.2, the project results in 2,000
square feet or more of replaced impervious surface, but is not subject to Simplified Drainage
Review, Directed Drainage Review or Large Project Drainage Review, therefore Full Drainage
Review applies.
Following is a list of the applicable core and special requirements, along with descriptions of how
each will be met:
Core Requirement #1: Discharge at Natural Location
The site consists of one TDA. The natural/existing discharge location to the existing storm level
spreader outfall to West Hylebos Wetland Park will be maintained.
Core Requirement #2: Offsite Analysis
A Level 1 downstream analysis and evaluation of the upstream drainage was performed. See
Section 3 of this TIR.
Core Requirement #3: Flow Control
The project is located within a Level 2 flow control area (aka conservation flow control area) and
requires a flow control facility. See Section 4.
Core Requirement #4: Conveyance System
New pipe systems and outfalls will meet KCSWDM Section 4.1 and 4.2. See Section 5.
Core Requirement #5: Erosion and Sediment Control
A TESC plan and report have been prepared. The plan is included in the civil set and the report
narrative is included in Section 8 of this TIR. The project is not subject to coverage under the
Department of Ecology Construction Stormwater General Permit (NPDES) because less than an
acre will be disturbed.
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 6 January 2022
Core Requirement #6: Maintenance & Operations
Onsite drainage facilities will be privately maintained. An operation and maintenance manual is
included in the Appendix.
Core Requirement #7: Financial Guarantees & Liability
Financial guarantees will be provided as required by the City of Federal Way.
Core Requirement #8: Water Quality
The project is located within the Enhanced Basic Water Quality Area and requires a water quality
treatment facility. See Section 4.
Core Requirement #9: Flow Control BMPs
Flow Control BMPs will be applied to the extent feasible using the lists method per KCSWDM
Section 1.2.9.2. See Section 4 of this TIR.
Special Requirement #1: Other Adopted Requirements
There are no other known adopted requirements.
Special Requirement #2: Flood Hazard Area Delineation
N/A - The project is not located within a FEMA floodway or 100-year floodplain.
Special Requirement #3: Flood Protection Facilities
N/A — The project will not rely on an existing flood protection facility (levee or revetment) or
modify/construct a new flood protection facility (levee or revetment).
Special Requirement #4: Source Control
Source control BMPs as required for the commercial use.
Special Requirement #5: Oil Control
N/A — The project is not a high -use site.
Section 3 - Offsite Analysis
Task 1. Study Area Definition and Maps
The site is identified in the figure on the following page. The study extends downstream for one
quarter mile in the field and one mile for resource review.
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 7 January 2022
Task 2. Resource Review
Per King County NAP and Federal Way maps, the site is located within the Hylebos Creek
Drainage Basin, which is within the Puyallup River watershed (Puyallup -White WRIA #10). The
site is next to a wetland and a small portion of the southwest corner of the lot has wetland buffer.
The north half of the site is within an area with low susceptibility to groundwater contamination,
while the south half of the site is within an area with medium susceptibility to groundwater
contamination. There are no other environmentally sensitive areas nearby.
Task 3. Field Inspection
A Level 1 Downstream Analysis and was performed on August 22, 2021. Conditions were sunny
and dry. Runoff generally flows from east to west across the site and disperses westerly into the
West Hylebos Wetland Park. Runoff continues to disperse through the vegetation in the Wetland
park in a southwesterly direction toward an unclassified channel tributary to Hylebos Creek for
more than a quarter mile. Upstream, offsite runoff does not appear to enter the site. S 3481n
Street is to the north and the Park and Ride is to the east and south — both have a separate
drainage system.
Task 4. Drainage System Description and Problem Descriptions
There are no apparent drainage problems. The downstream drainage flow path is shown in
Figure 5 on the following page.
Task S. Mitigation of Existing or Potential Problems
There are no known existing or potential drainage problems.
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 8 January 2022
S 348" St
803
tot, ti _y r .•r• SITE v�
r11•
.`ir �". �, f�' - fir'•. .a -'' ''.�•-\��' �� _ *`"S �'it. ,� S�k�
1,01
4{ fL A Y ��''s' `''y _ '�`^�- _ "__!e` �p��11 is7y-. �� � � s �`� ►.r •yy � . -
ju
AOL y
' ' a�.,,'� '�+ ,'�`"� `�� ..:�'� * "�• � •{ - � fit
Ir
av 9$► w
Figure 5 - Downstream Drainage System Map
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 9 January 2022
Section 4 - Flow Control, Low Impact Development (LID) and WQ
Facility Analysis and Design
Existing Site Hydrology (Part A)
The existing site consists of one subbasin (or TDA), which is delineated in Figure 6 on the following
pages. It comprises the lot (excluding wetland buffer) plus offsite improvements, which totals
0.607 acres of till and is modeled as forested land cover (historic condition). Western Washington
Hydrology Model (WWHM) has been used to analyze site hydrology; the report output is included
in the Appendix.
Developed Site Hydrology (Part B)
The developed site consists of the same subbasin (or TDA) as for existing and is shown in Figure
7 on the following pages. The total area is 0.607 acres of till, which includes of 0.419 acres
impervious and 0.188 acres pasture for landscape areas that will have soil amendment. Western
Washington Hydrology Model (WWHM) has been used to analyze site hydrology; the report
output is included in the Appendix.
Performance Standards (Part C)
The site is subject to Level 2 (Conservation) flow control, Enhanced Basic water quality treatment
menu and standard conveyance system capacity requirements. Flow control BMPs are required
to be evaluated per Section 1.2.9.2.2 and Core Requirement #9.
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 10 January 2022
S.S. MANHOLE
RIM = 225.00'
I.E. = 216.90: (C/L CHANNEL) 12" E/W
— — — — — E.=z1s.9o'(c/LCHANNEL>s N/s SOUTH 348TH STREET
TYPE C.B,, o' a�'m w TYPE 2 IS.B. 20 10 0 20 40
RIM = 225.7Q' RIM = 230,02'
I E = 221.42' (�12"CMP W J \ \ \ I.E. = 223.5Z' (12"CMP W.)
_ SCALE IN FEET
50' Y� \LE. = 221.43' ('F.�"CMP E.) G2 \ \\ \ I.E. = 225.Q2' (TOP STOVE PIPE)
APyyROACH \
CONC. SIDEWAL Cl1T I C NC. SIDEWA K / CUTROA i
CO C. SIDEWALK
GRASS ASPHALT \, GRASS TDA/BASIN SITE
� \ N 88°3913�'�W 100.00' 28� �
WWHM MODELING LAND USE:
FOREST: 0.607 AC
GATE/ �''a ECOLOGY BLOCK WALL TOTAL: 0.607 AC
ASPHALT
TDA/BASIN:
I
225— 1 GRAVEL 111 SITE
\
GRAVEL \ \I N
\ 1 I
\\ I I
ECOLOGY BLOCK WALL
5' CHAIN LINK FENCE 1 II
I N
W
I
2021049034
a
ECOLOGY BLOCK WALL I ry
I \ I
GRAVEL
I I r I
I I
�P
� I
I I
I N
5' CHAIN LINK FENCE 1
� 1
i7'26 I
GRAVEL
1
1 1
N 88°39'36 Ko 10 . 00'
CALL 811
2 BUSINESS DAYS
BEFORE YOU CIIG
Q
J
Q
rz
WM
Q O
O
� H C.
W0 Kr
LL
o 00
Li
1¢
LL] Ni J
(n W
Ld
W
W
0
0
LL
DC "'
z
cD
H
�rr
,z, Lu
I.
i V N
VATA
''^^
VJ
Z
0
Z
0
ZDESIGNED
KWO
CHECKED KWO
DRA ON NAS
'A)
CHECKED KWO
AS -BUILT
57<
WJOB
N0.
20-021
I
DATE
01 /2022
m:
ORAIHNC NAME
u
1 OF 1
T
I
SOUTH 348TH STREET
- -
50,
- -
— — —
—
— —
— —
—
—
— — —
— —
— — —
2021049034
6
TDA/BASIN:
SITE
20 10 0 20 40
SCALE IN FEET
TDA/BASIN SITE
LAND USE AREA TAKEOFFS:
ROOF: 887 SF
PAVEMENT: 17,398 SF
LANDSCAPE: 8,173 SF
TOTAL: 26,458 SF
=0.607 AC
WWHM MODELING LAND USE:
IMPERVIOUS: 0.419 AC
LANDSCAPE (PASTURE): 0.188 AC
TOTAL: 0.607 AC
LEGEND
LANDSCAPE (PASTURE)
IMPERVIOUS (ASPHALT)
IMPERVIOUS (CONCRETE)
Q
a
o�
W
0 0
W
LLLLJ
o ��
�r
�Q
>�3
W J
Q O�
(n � W
H]
W
W
0
0
LL
z J
ilia
�z
WW7
g
1L
O
$
Q
z
� z
Z//�
w c/)
0
M
3
vJ
Q
J_
n
0
m
CV
,•. I
Z
o
u]
0
Z
0
W
0
J
W
=AS-BUILT
UJI
QJOH
N0.
20-021
GATE
01 /2022
cr
ORAMiNC NAME
Flow Control System (Part D)
The engineering plans are included in the Appendix to provide an illustrative sketch of the
proposed facilities.
The site is subject to the flow control facility requirement. The flow control system will consist
of CMP underground detention tank system. The facility has been sized to meet the duration
standard with WWHM; the project report is included in the Appendix.
The project is subject to individual lot BMP requirements per KCSWDM Section 1.2.9.2. This
project falls in the category of Large Lot BMP Requirements because the proposed project is on
a site/lot larger than 22,000 sf within the UGA. The requirements are evaluated below:
1. Full dispersion is not feasible because a native vegetated flowpath segement of 100
feet is not available onsite.
2. Full infiltration of roof runoff is not feasible because onsite soils are glacial till per
geotech.
3. Full infiltration, limited infiltration, bioretention and permeable pavement are not
feasible because onsite soils are glacial till per geotech.
4. Basic dispersion is not feasible because the vegetated flow path segments of 50 feet
and 25 feet for the dispersion devices are not available.
5. BMPs must be implemented at minimum for an impervious area equal to at least
10% of the site/lot, which is 2,548 sf for this project (0.607 ac site - 0.022 ac buffer x
0.1 = 0.059 ac = 2,548 sf). This area will be mitigated by fee in lieu if required by the
City.
6. New pervious surface shall be protected; the duff layer and native topsoil shall be
retained to the maximum extent possible. Soil amendment shall be used to mitigate
where compaction or removal of some or all the duff layer or underlying topsoil has
occurred.
7. Roofs do not directly connect to the local drainage system (there is an onsite
detention system), so perforated pipe is not required.
Water Quality System (Part E)
The engineering plans are included in the Appendix to provide an illustrative sketch of the
proposed facilities.
A BioPod BioFilter by Oldcastle is proposed upstream of detention to meet Enhanced Basic water
quality treatment requirements. The water quality flow rate (online adjusted for 15 min) of
0.0671 cfs and 100 year peak bypass flow rate of 0.335 cfs are handled by the 4' by 8' unit, which
allows up to 0.085 cfs to meet WA Ecology GULD requirements for Enhanced Basic with bypass
capacity of 5.0 cfs. WWHM calcs are included in the Appendix.
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 13 January 2022
Section 5 - Conveyance System Analysis and Design
New pipe systems shall be designed with enough capacity to convey and contain (at minimum)
the 25-year peak flow, assuming developed conditions for onsite tributary areas and existing
conditions for offsite tributary areas. Pipe system structures may overtop for runoff events that
exceed the 25-year design capacity, provided the overflow from a 100-year runoff event does not
create or aggravate a severe flooding problem or severe erosion problem.
The proposed pipe system will generally consist of catch basins and 8" diameter storm drain. The
method used for sizing of the new pipe system is the Uniform Flow Analysis Method. Each pipe
within the system is sized and sloped such that its barrel capacity at normal full flow (computed
by Manning's equation below) is equal to or greater than the design flow. The proposed pipe
system shall covey the 25-year peak flow for the developed unmitigated scenario. WWHM was
used to calculate the developed unmitigated design flows; the flows are shown in the screenshot
that follows.
1.49AR0.67so.s 1.49(0.342)(0.165)0.670.0050.1 Q = _ = 0.90 cfs
n 0.012
A = rcr' = 740.33)Z = 0.342
P = 27cr = 27c(0.5) = 2.073
A 0.342
R=_ P 2.073=0.165
n = 0.012
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 14 January 2022
The proposed flow capacity, Q, for an 8" pipe laid at 0.50% is 0.90 cfs, which is greater than the
25-year peak flow for the entire developed unmitigated site of 0.275 cfs. It is also greater than
the 100-year peak flow for the entire site of 0.335 cfs.
IIIIIIIIA-1 • c
1 ° Cumulative Probabil ty , 1.0
+ + +
L + + 701
+ +++++++
0.1 0.1
05 1 2 5 10 20 30 50 70 BD 90 95 98 9D995100
Stream%teclienDuration I LID Duialion RmPequenq, Wet -Quaky Hydrog�aph j
W0Iandlnput Voiunes UDRepod Kirg2012 Recharge Recharge Redeveloped J Recharge Mitigated
Anallm dalaaeta Corrpaet WDM Delete Selected r Monthly FF
1 PUYALLUP DAILY EVAP WIDEN S E"Al S
2 seelac 15 minute
5O1 POC1 Pede cio ed flow
801 PO 1 1.400ted flow
1000Tank IALL OUTLETS Mitgated
1001 Tank 1 STAGE Mitigated
All Datasels Flow Stage to Evap POC1
Flood Frequency Method
r: Lop Pearson Type III 17E
r Webull
C Crmare
r Grigarren
Section 6 - Special Reports and Studies
Floc Fre 1--'y A
Flow Cofs1 0701 15a
2 Year 0.1634
5 Year 0.2069
10 Year 0_2365
25 Year 0.2750
50 Year 0.3045
1DU Year 0.3347
Anneal Peaks
1945 0.2159
1950 0.2236
1951 0.1373
1952 0.1131
1953 0.1242
1954 0.1339
1955 0.1498
1956 0.1474
1957 0.1708
195E 0.1330
19so 0.1354
1960 0.1434
1961 0.1452
1962 0.1232
1963 0.1402
1964 0.1335
1965 0.1741
1966 0.2169
1967 0.1965
196a 0.2222
1969 0.1572
1970 0.2533
1971 0.1010
1972 0.2909
1973 0.1110
1974 0.1656
1975 0.1066
1976 0.2322
A Geotechnical Report (see Appendix) has been prepared for this project.
Section 7 - Other Permits
Permits as required by City of Federal Way, including Right -of -Way Use, Building permit, Site Plan
Approval (Land Use Process II), and Lakehaven Water and Sewer District.
Technical Information Report KWO Engineering, PLLC
Davis Big Foot Java Federal Way 15 January 2022
Section 8 - CSWPP Plan Analysis and Design
ESC Plan Analysis and Design (Part A)
A temporary erosion and sedimentation control (ESC) plan is included in the construction
drawings. Following is a narrative of the erosion control requirements and best management
practices for the project:
Clearing Limits
Prior to any land disturbing activities, all clearing limits, sensitive areas and their buffers, and
trees that are to be preserved within the construction area shall be clearly marked to prevent
damage and offsite impacts. Clearing shall be minimized to the maximum extent practicable. On
the ground, clearing limits must be clearly marked with brightly colored tape or plastic or metal
safety fencing. If tape is used, it should be supported by vegetation or stakes, and should be
about 3 to 6 feet high and highly visible. Equipment operators should be informed of areas of
vegetation that are to be left undisturbed.
Cover Measures
All exposed and unworked soils shall be stabilized through the application of cover measures to
protect the soil from the erosive forces of raindrop impact, flowing water and wind erosion.
Straw mulching and plastic covering shall be implemented. Nets and blankets, seeding and
sodding may also be applied.
Cover measures must be installed if an area is to remain unworked for more than seven days
during the dry season (May 1 to September 30) or for more than two consecutive working days
during the wet season (October 1 to April 30). These time limits may be relaxed if an area poses
a low risk of erosion due to soil type, slope gradient, anticipated weather conditions, or other
factors. Conversely, the City may reduce these time limits if site conditions warrant greater
protection (e.g., adjacent to significant aquatic resources or highly erosive soils) or if significant
precipitation is expected.
Any area to remain unworked for more than 30 days shall be seeded or sodded unless the City
determines that winter weather makes vegetation establishment infeasible. During the wet
season, exposed ground slopes and stockpile slopes with an incline of 3 horizontal to 1 vertical
(31-1:1V) or steeper and with more than ten feet of vertical relief shall be covered if they are to
remain unworked for more than 12 hours. Also, during the wet season, the material necessary
to cover all disturbed areas must be stockpiled onsite. The intent of these cover requirements is
to have as much area as possible covered during any period of precipitation.
Perimeter Protection
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 16 January 2022
Install perimeter projection prior to any upslope clearing and grading. Silt fence, wattles,
vegetated strips, fiber rolls, sand/gravel barriers, brush/rock filters may be used.
Traffic Area Stabilization
The existing driveway shall be used for construction ingress/egress and parking.
Sediment Retention
Runoff from disturbed areas shall pass through a sediment control measure to prevent the
transport of sediment downstream until the disturbed area is fully stabilized. Sediment controls
shall be installed as one of the first steps in grading and shall be functional before land disturbing
activities take place. This project shall use silt fence or equal. Sediment must be removed from
the silt fence when it is 6 inches high. It is important to check the uphill side of the fence for signs
of the fence clogging and acting as a barrier to flow and then causing channelization of flows
parallel to the fence. If this occurs, replace the fence or remove the trapped sediment.
Surface Water Collection
Stormwater runoff originating on the site and/or entering the site from offsite areas must be
controlled to minimize erosion of disturbed areas and exposed cut and fill slopes. Runoff shall
be managed by dispersion to the extent possible.
Dewatering Control
No dewatering is anticipated for this project. (Accumulated water in foundation areas,
excavations, and utility trenches shall be removed and disposed of in a manner that does not
pollute surface waters or cause downstream erosion or flooding, such as onsite infiltration or
dispersion.)
Dust Control
Dust control shall be implemented when exposed soils are dry to the point that wind transport is
possible and roadways, drainage ways, or surface waters are likely to be impacted. Water is the
most common dust control (or palliative) used in the area. When using water for dust control,
the exposed soils shall be sprayed until wet, but runoff shall not be generated by spraying.
Exposed areas shall be re -sprayed as needed.
Flow Control
Surface water from disturbed areas may be routed through the project's onsite flow control
facility or other provisions must be made as necessary to prevent increases in the existing site
conditions 2-year and 10-year runoff peaks discharging from the project site during construction.
If the project's onsite flow control facility is used, it shall be cleaned following construction
activities.
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 17 January 2022
Control Pollutants
All construction activities shall be done in a manner that prevents pollution of surface waters and
ground waters as specified in King County's Stormwater Pollution Prevention Manual (SPPM).
The following measures shall be implemented:
1. All pollutants, including waste materials, that occur onsite shall be handled and disposed
of in a manner that does not cause contamination of stormwater.
2. Cover, containment, and protection from vandalism shall be provided for all chemicals,
liquid products, petroleum products, and non -inert wastes present on the site (see
Chapter 173-304 WAC). Onsite fueling tanks shall include secondary containment.
3. Maintenance and repair of heavy equipment and vehicles involving oil changes, hydraulic
system drain down, solvent and de -greasing cleaning operations, fuel tank drain down
and removal, and other activities which may result in discharge or spillage of pollutants
to the ground or into stormwater shall be cleaned immediately following any discharge
or spill incident. Emergency repairs may be performed onsite using temporary plastic
placed beneath and, if raining, over the vehicle.
4. Application of agricultural chemicals, including fertilizers and pesticides, shall be
conducted in a manner and at application rates that will not result in loss of chemical to
stormwater runoff. Manufacturer's recommendations for application rates and
procedures shall be followed.
5. Measures shall be used to prevent or treat contamination of stormwater runoff by pH
modifying sources. These sourced include, but are not limited to, bulk cement, cement
kiln dust, fly ash, new concrete washing and curing waters, waste streams generated from
concrete grinding and sawing, exposed aggregate processes, and concrete pumping and
mixer washout waters. Stormwater discharges shall not cause or contribute to a violation
of the water quality standard for pH in the receiving water
Protect Existing and Proposed Flow Control BMPs
N/A —The project does not have any existing or proposed flow control BMPs.
Maintain BMPs
Inspect, maintain and repair all temporary and permanent erosion and sediment control BMPs
as needed to assure continued performance of their intended function.
The CSWPP supervisor shall review the site for ESC and SWPPS at least weekly and within 24
hours of significant storms. The CSWPP supervisor shall also review the site during periods of
active construction where maintenance conditions change with construction activity.
Inspections may be reduced to once per month for temporarily stabilized, inactive sites.
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 18 January 2022
All temporary ESC measures shall be removed prior to final construction approval, or within 30
days after final site stabilization is achieved or after the temporary measures are no longer
needed. Trapped sediment shall be removed or stabilized onsite. Disturbed soil areas resulting
from removal of measures or vegetation shall be permanently stabilized. At a minimum,
disturbed areas must be seeded and mulched to ensure that sufficient cover will develop shortly
after final approval. Mulch without seeding is adequate for small areas to be landscaped before
October 1.
Manage the Project
The contractor shall designate a CSWPP supervisor who shall be responsible for the performance,
maintenance, and review of ESC and SWPPS measurers and for compliance with all permit
conditions relating to CSWPP. Phase work to the maximum degree practicable and consider
seasonal work limits.
Maintain an updated construction SWPPP in accordance with City requirements and King County
Surface Water Design Manual Appendix D requirements.
SWPPS Plan Design (Part B)
See section entitled "Control Pollutants" in Part A above.
Section 9 - Bond Quantities, Facility Summaries, and Declaration of
Covenant
A bond quantities worksheet, facility summary sheet and declaration of covenant will be
provided as required by the City during final engineering.
Section 10 - Operations and Maintenance Manual
An operations and maintenance manual is included in the Appendix.
Technical Information Report KWO Engineering, PLLC
Davis BigFoot Java Federal Way 19 January 2022
Appendix A - TIR Worksheet (Figure 1)
Technical Information Report
Davis BigFoot Java Federal Way
KWO Engineering, PLLC
January 2022
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Peril PROJECT OWNER AND
PROJECT ENGINEER
Project Owner Steve Date i s
Phone 253.1y Dlo. 558(�
Address (4112.4 PG0.n0r-a.rnA_ I>►' N
-Tacoma, wA a847.2
Project Engineer I;riSiPv%Orr.Aor-W,PE
Company Kwo Ery(ivl-e_ i!2A , IF LAf,
Phone•�55. 3g51
Part 3 TYPE OF PERMIT APPLICATION
P Landuse (e.g.,Subdivision / Short Subd. / UPD)
® Building (e.g.,M/F / Commercial / SFR)
❑ Clearing and Grading
❑ Right -of -Way Use
❑ Other
Part2 PROJECT LOCATION AND
DESCRIPTION
Project Name
DPER Permit #
Location Township 2) N
Range 4E
Section Zo
Site Address Boa S 34s" "' St
FeAeral wm . WA stem
Part4 OTHER REVIEWS AND PERMITS
❑
DFW HPA
❑ Shoreline
❑
❑
❑
❑
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Management
Structural
ult/_
Rockery/Vault/
❑ ESA Section 7
❑
Other
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report
Site Improvement
Plan
(Engr. Plans)
0
Full
Type of Drainage Review
❑
Targeted
Plan Type (check
❑
❑
Full
(check one):
❑
Simplified
one):
Modified
❑
Large Project
❑
Simplified
Date (include revision
❑
J
Directed
Date (include revision
J~�
i i
dates):
an 2-02-►
dates):
Date of Final:
Date of Final:
Part6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard Experimental / Blanket
Description: (include conditions in TIR Section 2)
Approved Adjustment No. Date of Approval:
2016 Surface Water Design Manual 4/24/2016
1
KING COUNTY. WASHINGTON. SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date:
Completion Date:
Describe:
Re: KCSWDM Adjustment No.
Part8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan : Fedtr-�Ll W A-y
Special District Overlays:
Drainage Basin: H� I-cbus Ci'eey-.
Stormwater Requirements:
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
❑ River/Stream
❑ Steep Slope
❑ Lake
❑ Erosion Hazard
® Wetlands r- enss -�e
❑ Landslide Hazard
❑ Closed Depression
❑ Coal Mine Hazard
❑ Floodplain
❑ Seismic Hazard
❑ Other
❑ Habitat Protection
Part 10 SOILS
Soil Type
�y�r�ctY- P�Idtirwooc�
rtivcl v�ciy
I OA-IM
moo. � t
Slopes
(a -1601.
❑ High Groundwater Table (within 5 feet)
❑ Other
❑ Additional Sheets Attached
❑ Sole Source Aquifer
❑ Seeps/Springs
Erosion Potential
2016 Surface Water Design Manual 2 4/24/2016
KING COUNTY. WASHINGTON. SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
PartIll DRAINAGE DESIGN LIMITATIONS
REFERENCE
LIMITATION / SITE CONSTRAINT
❑ Core 2 — Offsite Analysis
❑ Sensitive/Critical Areas
❑ SEPA
0 LID Infeasibility
❑ Other
❑ Additional Sheets Attached
Part 12 TIR SUMMARY SHEET
(provide one FIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area:
S1�
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location
Number of Natural Discharge Locations:
Offsfte Analysis
Level: 0/ 2 / 3 dated:
Flow Control (include facility
Level: 1 ! / 3 or Exemption Number
summary sheet)
Flow Control BMPs S of l A y)Cr% n w.fi
Conveyance System
Spill containment located at: 0075tnr^�
Erosion and Sediment Control !
CSWPP/CESCUESC Site Supervisor: SieVC LAV t S
Construction Stormwater
Contact Phone: 25 a-te01" 5810
Pollution Prevention
After Hours Phone: )-s 5 •(aoly • 55810
Maintenance and Operation
Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and
Provided: Yes / No
Liability
Water Quality (include facility
Type (circle one): Basic / Sens. Lake /(nhanced Basic Bog
summary sheet)
or Exemption No.
Landscape Management Plan: Yes /®
Special Requirements (as applicable):
Area Specific Drainage
Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None
Requirements
Name:
Floodplain/Floodway Delineation
Type (circle one): Major ! Minor / Exemption / None
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities
Describe: iv IA
2016 Surface Water Design Manual _ 4/24/2016
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 12 TIR SUMMARY SHEET
(provide one TIR Summary Sheet per Threshold Discharge Area)
Source Control
Describe land use: Cokv,rneraiA l
(commercial / industrial land use)
Describe any structural controls: not ie
Oil Control
High -use Site: Yes / No
Treatment BMP:
Maintenance Agreement: Yes / No
with whom?
Other Drainage Structures
Describe:
Part13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
AFTER CONSTRUCTION
Clearing Limits
Stabilize exposed surfaces
Cover Measures
0 Perimeter Protection
Remove and restore Temporary ESC Facilities
l.d Clean and remove all silt and debris, ensure
L, Traffic Area Stabilization
operation of Permanent Facilities, restore
operation of Flow Control BMP Facilities as
Sediment Retention
necessary
Surface Water Collection
❑ Flag limits of SAO and open space preservation
Dewatering Control
areas
❑ Other
Dust Control
JFlow
Control
❑ Protection of Flow Control BMP Facilities
(existing and proposed)
U Maintain BMPs / Manage Project
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control
Type/Description
Water Quality
Type/Description
Detention
❑ Infiltration
❑ Regional Facility
❑ Shared Facility
❑ Flow Control BMPs
❑ Other
C MF-i&Oy-.
❑ Vegetated Flowpath
❑ Wetpool
❑ Filtration
❑ Oil Control
❑ Spill Control
❑ Flow Control BMPs
❑ Other
51,OF0k Bio-ril
2016 Surface Water Design Manual 4/24/2016
KING COUNTY. WASHINGTON. SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 15 EASEMENTSITRACTS
Part16 STRUCTURAL ANALYSIS
❑ Drainage Easement
❑ Cast in Place Vault
Covenant
❑ Retaining Wall
❑ Native Growth Protection Covenant
❑ Rockery > 4' High
❑ Tract
❑ Structural on Steep Slope
❑ Other
❑ Other
Part17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
Signs
2016 Surface Water Design Manual 424/2016
Appendix B - Geotechnical Report
Technical Information Report
Davis BigFoot Java Federal Way
KWO Engineering, PLLC
January 2022
0001mos0000l000Ppowomo—ow- GEORESOURCES
earth science & geotechnical engineering
4809 Pacific Hwy. E. Fife, Washington 98424 1 253.896.1011 1 www. georesources.rocks
Steve Davis
6124 Panorama Drive NW
Tacoma, WA 98422
(253) 606-5586
stevedavisexcavating@gmail.com
August 24, 2021
Geotechnical Engineering Report
Proposed Commercial Development
803 South 348th Street
Federal Way, Washington
PN:2021049087
Doc ID: Davis.S348thSt.RG
INTRODUCTION
This Geotechnical Engineering Report summarizes our recent site observations, subsurface
explorations, laboratory testing and engineering analyses, and provides geotechnical
recommendations and design criteria for the proposed Bigfoot Java drive-thru coffee shop to be
constructed at 803 South 348th Street in Federal Way, Washington. The location of the site is shown
on the Site Location Map, Figure 1.
Our understanding of the project is based on our discussions with you; our previous work at
the subject site; our August 3, 2021 site visit; and our understanding of the City of Federal Way
development codes, and our experience in the area. We understand that you propose to construct a
drive thru coffee shop with a paved parking area at the site. We anticipate that the structure will be a
one- story, wood framed structure founded on conventional shallow footings. The proposed site plan
is included as the Site & Exploration Plan, Figure 2.
We understand that the City of Federal Way uses the 2016 version of the King County Surface
Water Design Manual (KCSWDM) with addendum to confirm subsurface conditions and to address
the feasibility of the onsite infiltration of stormwater runoff generated by the proposed development.
This Geotechnical Engineering Report addresses the feasibility of the site soils to support infiltration
BMPs and provides geotechnical design recommendations for the proposed commercial
development.
SCOPE
The purpose of our services was to evaluate the surface and subsurface conditions across the
site as a basis for providing geotechnical recommendations and design criteria for the subject site.
Specifically, the scope of services for this project included the following:
1. Reviewing the available geologic, hydrogeologic, and geotechnical data for the site area;
2. Observing subsurface conditions across the site by monitoring the excavation of three test
pits at select locations across the site;
Davis.S348thSt.RG
August 24, 2021
Page 12
3. Providing geotechnical conclusions and recommendations regarding site grading activities
including; site preparation, subgrade preparation, fill placement criteria, suitability of on -
site soils for use as structural fill, temporary and permanent cut and fill slopes, drainage
and erosion control measures;
4. Providing recommendations and design criteria for stormwater runoff mitigation
measures, including but not limited to a cutoff or French drain; and
5. Providing recommendations for seismic design parameters, including 2018 IBC site class;
6. Providing geotechnical conclusions regarding foundations and floor slab support and
design criteria, including bearing capacity and subgrade modulus as appropriate;
7. Providing our opinion about the feasibility of onsite infiltration including a preliminary
design infiltration rate based on grain size data per the 2016 King County Stormwater
Design Manual, if applicable; and,
8. Preparing a written Geotechnical Engineering Report summarizing our site observations
and conclusions, and our geotechnical recommendations and design criteria, along with
the supporting data.
The above scope of work was summarized in our Proposal for Geotechnical EngineeringServices
dated August 2, 2021. We received written authorization to proceed the same day.
SITE CONDITIONS
Surface Conditions
As stated, the subject site is located at 803 South 348th Street in Federal Way, Washington in
an area of existing commercial development. According to the King County iMap website, the site is
rectangular in shape, measures approximately 100 feet wide (east to west) by approximately 250 feet
long (north to south) and encompasses approximately 0.57 acres. The site is mostly undeveloped but
there is a large modular concrete retaining wall on portions of the south and west side of the parcel.
The site is bounded by undeveloped land to the west and south, a parking lot to the east, and South
348th Street to the North.
According to topographic information obtained from the King County iMap website and our
site observations, the ground surface of the site is relatively flat with a gentle slope to the southwest
at approximately 1 to 5 percent. Along the southeastern, southern, and western borders of the site
there is a block wall that extends down from the site. The wall varies in height from approximately 3
to 10 feet. The total topographic relief of the site is on the order of approximately 15 feet. The existing
site layout and topography are shown on the Site Vicinity Map, Figure 3.
Vegetation across the site generally consists of sparse unmaintained grasses with scattered
coniferous and deciduous trees along the perimeters of the site. No springs or seepage was observed
at the time of our site visits. No evidence of erosion, soil movement, landslide activity or deep-seated
slope instability was observed at the site or the adjacent areas at the time of our site visit.
Site Soils
The Natural Resource Conservation Service (NRCS) Web Soil Survey maps the site as being
underlain by Everett-Alderwood gravelly sandy loams (EwQ soils and Seattle Muck (Sk) soils. An
excerpt of the NRCS map for the site vicinity is attached as Figure 4. Descriptions of the mapped soils
are provided below.
GEO RESOURCES
earth 5cicnre d geMuhnlcal cngirecring
Davis.S348thSt.RG
August 24, 2021
page 13
Everett-A/derwood rg ave//y sandy /oams The Everett-Alderwood soils are mapped as
underlying the northern portion of the site, are derived from basal till with some volcanic ash, form
on slopes of 6 to 15 percent, are considered to have a "slight to moderate" erosion hazard when
exposed, and are included in hydrologic soils group B.
Seattle Muck(Sk)soils The Seattle Muck soils are mapped as underlying the southern portion
of the site, are derived from grassy organic material, form on slopes of 0 to 1 percent, are considered
to have a "slight" erosion hazard when exposed, and are included in hydrologic soils group B/D.
Site Geology
The Geologic Map of the Poverty Bay 7.5-minute Quadrangle, Washington, Derek B. Booth,
Howard H. Waldron, and Kathy G. Troost (2003) indicates the site is underlain by Recessional Outwash
Deposits (Qvr), with glacial till (Qgt) being mapped within the site vicinity. These glacial soils were
deposited during the Vashon Stade of the Fraser glaciation, approximately 12,000 to 15,000 years ago.
An excerpt of the above referenced geologic map is attached as Figure 5. Descriptions of the mapped
geologic units are provided below.
Recessional Outwash Deposits (QThe recessional outwash soils typically consist of a
poorly to well sorted, lightly stratified mixture of sand and gravel that may contain localized deposits
of clay and silt that were deposited by meltwater streams emanating from the retreating ice mass.
glac/al t/ll L t. Glacial till is also mapped in the vicinity of the site and generally underlays the
recessional outwash. Glacial till consists of a heterogeneous mixture of clay, silt, sand, and gravel that
was deposited at the base of the prehistoric continental ice mass and was subsequently overridden.
No areas of landslide deposits or mass wasting are noted on the referenced map on or within the
immediate vicinity of the site.
Subsurface Explorations
On August 3, 2021, we visited the site and monitored the excavation of three test pits to depths
of about 8 to 81/4 feet below the existing grade, logged the subsurface conditions encountered in each
test pit, and obtained representative soil samples. The test pits were excavated by a small track -
mounted excavator operated by you.
The specific number, locations, and depths of our explorations were selected by based on the
proposed configuration of the proposed development and were adjusted in the field based on
consideration for site access limitations, underground utilities, existing site conditions, and current
site usage. The soil densities presented on the test pit logs are based on the difficulty of excavation
and our experience. Representative soil samples obtained from the explorations were placed in
sealed plastic bags and taken to our laboratory for further examination and testing as deemed
necessary. Each test pit was backfilled with the excavated soils and bucket tamped, but not otherwise
compacted.
The subsurface explorations excavated as part of this evaluation indicate the subsurface
conditions at specific locations only, as actual subsurface conditions can vary across the site.
Furthermore, the nature and extent of such variation would not become evident until additional
explorations are performed or until construction activities have begun. Based on our experience and
extent of prior exploration in the area, it is our opinion that the soils encountered in the exploration
G E 0 R E S 0 U R C E S
earth 5cicnre d geMuhnical cngirccring
Davis.S348thSt.RG
August 24, 2021
page 14
are generally representative of the soils at the site. Table 1, below, summarizes the approximate
functional locations, surface elevations, and termination depths of our test pits.
TABLE 1:
APPROXIMATE LOCATIONS, ELEVATIONS, AND DEPTHS OF EXPLORATIONS
Surface
Termination
Termination
Test Pit
Functional Location
Elevation'
Depth
Elevation'
Number
(feet)
(feet)
(feet)
TP-1
Northern portion of site
227
8'/4
2183/4
TP-2
Central portion of site
226
8
218
TP-3
I Southern portion of site
1 225
1 8
1 217
Notes:
= Surface Elevations estimated by interpolating between contours provided on the King County GIS (NAVD 88)
The approximate locations and numbers of our test pits are shown on the attached Site &
Exploration Plan, Figure 2. The indicated locations were determined by taping or pacing from existing
site features and reference points; as such, the locations should only be considered as accurate as
implied by the measurement method. The soils encountered were visually classified in accordance
with the Unified Soil Classification System (USCS) and ASTM D2488. The USCS is included in Appendix
A as Figure A-1, while the descriptive logs of our test pits are included as Figures A-2 and A-3.
Subsurface Conditions
At the locations of our subsurface explorations we encountered fairly uniform subsurface
conditions that, in our opinion, generally differed from the mapped stratigraphy. Our test pits
encountered approximately 5'/4 to 7'/2 feet of grey poorly graded gravel with some coarse sand in a
dense, moist condition. We were informed that these soils are fill placed during previous construction
activities. No compaction tests were provided to us, but the soil did appear compacted. Underlying the
fill, our test pits encountered grey to tan silty sandy gravel in a dense, moist condition. We interpret
these soils to be consistent with glacial till. These soils were encountered to the full depth explored.
Laboratory Testing
Geotechnical laboratory tests were performed on select samples retrieved from our
exploration to estimate index engineering properties of the soils encountered. Laboratory testing
included visual soil classification per ASTM D2488, moisture content determinations per ASTM D2216,
and grain size analysis per ASTM D6913.
Groundwater Conditions
At the locations of our test pits we did not encounter groundwater seepage within the depths
explored. However, we did observe iron -oxide staining/discoloration, otherwise known as mottling, at
approximately 5'/4 to 7'/z feet below existing ground surface. Mottling is generally indicative of a seasonal
or fluctuating groundwater surface, often associated with perched groundwater. Perched groundwater
table develops when the vertical infiltration of precipitation through a more permeable soil, is slowed
at depth by a deeper, less permeable soil type. We anticipate fluctuations in the local groundwater
levels will occur in response to precipitation patterns, off -site construction activities, and site
GEO RESOURCES
earth 5cicnre K geMuhnical cngirccring
Davis.S348thSt.RG
August 24, 2021
page 1 5
utilization. Analysis or modeling of anticipated groundwater levels during construction is beyond the
scope of this report.
ENGINEERING CONCLUSIONS AND RECOMMENDATIONS
Based on the results of our data review, site reconnaissance, subsurface explorations and our
experience in the area, it is our opinion that the construction of the drive-thru coffee shop is feasible
from a geotechnical standpoint. Pertinent conclusions and geotechnical recommendations regarding
the design and construction of the proposed development are presented below.
Seismic Design
The site is located in the Puget Sound region of western Washington, which is seismically
active. Seismicity in this region is attributed primarily to the interaction between the Pacific, Juan de
Fuca and North American plates. The Juan de Fuca plate is subducting beneath the North American
plate at the Cascadia Subduction Zone (CSZ). This produces both intercrustal (between plates) and
intracrustal (within a plate) earthquakes. In the following sections we discuss the design criteria and
potential hazards associated with the regional seismicity.
Seismic Site Class
Based on our observations and the subsurface units mapped at the site, we interpret the
structural site conditions to correspond to a seismic Site Class "C" for the onsite soils in accordance
with the 2018 IBC (International Building Code) documents and ASCE 7-16 Chapter 20 Table 20.3-1.
This is based on the observed density of the encountered glacial till, typical SPT values for the glacial
till, and the mapped stratigraphy. These conditions are assumed to be representative for the
subsurface across the site.
Design Parameters
The U.S. Geological Survey (USGS) completed probabilistic seismic hazard analyses (PSHA) for
the entire country in November 1996, which were updated and republished in 2002 and 2008. We
used the ATCHazard by location website to estimate seismic design parameters at the site. Table 3,
below, summarizes the recommended design parameters.
TABLE 3:
2018 /BCPAR4METER5 FOR DE516N OFSE/SM/CSTRUCTURES
Spectral Response Acceleration (SRA) and Site Coefficients
Short Period
Mapped SRA
SS = 1.317g
Site Coefficients (Site Class C)
Fa = 1.200g
Maximum Considered Earthquake SRA
Sens = 1.5819
Design SRA
Sos = 1.0519
G E 0 R E S 0 U R C E S
earth 5cicnre d geMuhnical cngirccring
Davis.S348thSt.RG
August 24, 2021
page 16
Peak Ground Acceleration
The mapped peak ground acceleration (PGA) for this site is 0.557g. To account for site class,
the PGA is multiplied by a site amplification factor (FPGA) of 1.2. The resulting site modified peak
ground acceleration (PGAM) is 0.668g. In general, estimating seismic earth pressures (kh) by the
Mononobe-Okabe method are taken 30 to 50 percent of the PGAM, or 0.222g to 0.334g.
Seismic Hazards
Earthquake -induced geologic hazards may include liquefaction, lateral spreading, slope
instability, and ground surface fault rupture. Liquefaction is a phenomenon where there is a reduction
or complete loss of soil strength due to an increase in pore water pressure in soils. The increase in
pore water pressure is induced by seismic vibrations. Liquefaction primarily affects geologically
recent deposits of loose, uniformly graded, fine-grained sands and granular silts that are below the
groundwater table. Based on the dense nature of the glacially consolidated soils and the interpreted
depth of the groundwater table, it is our opinion that the risk to the development from liquefaction
or lateral spreading is low.
Foundation Support
Based on the subsurface conditions encountered at the locations explored, we recommend
that spread footings be founded on the dense glacial till soils. Footings can be founded on the
undocumented fill, provided that a field representative of GeoResources verifies the subsurface
conditions at time of the excavation of the footings. We recommend that in -situ density test be taken
at the base of foundation area that the test pits show to be fill. The fill should be compacted to at least
95 percent of the maximum dry density (MDD) as determined by the modified proctor. Tests should
also be taken at depths of 1 and 2 feet below the bottom of the footings.
The soil at the base of the excavations should be disturbed as little as possible. All loose, soft
or unsuitable material should be removed or compacted, as appropriate. A representative from our
firm should observe the foundation excavations to determine if suitable bearing surfaces have been
prepared, particularly if any areas of the foundation will be situated in existing fill material.
All footing elements should be embedded at least 18 inches below grade for frost protection.
Footings founded on the advance outwash can be designed using an allowable soil bearing capacity
of 2,000 psf (pounds per square foot) for combined dead and long-term live loads. The weight of the
footing and any overlying backfill may be neglected. The allowable bearing value may be increased
by one-third for transient loads such as those induced by seismic events or wind loads.
Lateral loads may be resisted by friction on the base of footings and floor slabs and as passive
pressure on the sides of footings. We recommend that an allowable coefficient of friction of 0.35 be
used to calculate friction between the concrete and the underlying soil. Passive pressure may be
determined using an allowable equivalent fluid density of 300 pcf (pounds per cubic foot). Factors of
safety have been applied to these values.
We estimate that settlements of footings designed and constructed as recommended will be
less than �/2 inch, forthe anticipated load conditions, with differential settlements between comparably
loaded footings approaching total settlements. Most of the settlements should occur essentially as
loads are being applied. However, disturbance of the foundation bearing surfaces during
construction could result in larger settlements than predicted. We recommend that all foundations
be provided with footing drains.
G E 0 R E S 0 U R C E S
earth 5cicnre d geMuhnical cngirccring
Davis.S348thSt.RG
August 24, 2021
Page 1 7
Floor Slab Support
We anticipate that the floor will consist of a slab -on -grade. Slab -on -grade floors should be
supported on the glacial on structural fill prepared as described in the "Structural Fill" section of the
report. Areas of significant organic debris and loose or disturbed soils should be removed.
We recommend that floor slabs be directly underlain by a minimum 4 inch thick layer of pea
gravel or washed 5/8-inch crushed rock that contains less than 2 percent fines as shown on the typical
wall drainage and backfill detail, Figure 6. This layer should be placed in a single lift and compacted
to an unyielding condition.
A synthetic vapor retarder is recommended to control moisture migration through the slabs.
This is of particular importance where moisture migration through the slab is an issue, such as where
adhesives are used to anchor carpet or tile to the slab.
A subgrade modulus of 200 pci (pounds per cubic inch) may be used for floor slab design. We
estimate that settlement of the floor slabs designed and constructed as recommended, will be 1/2
inch or less over a span of 50 feet.
Temporary Excavations
All job site safety issues and precautions are the responsibility of the contractor providing
services/work. The following cut/fill slope guidelines are provided for planning purposes only.
Temporary cut slopes will likely be necessary during grading operations or utility installation.
All excavations at the site associated with confined spaces, such as utility trenches and
retaining walls, must be completed in accordance with local, state, or federal requirements. Based on
current Washington Industrial Safety and Health Act (WISHA, WAC 296-155-66401) regulations, we
classify the upper undocumented fill as Type B soils and the lower undisturbed glacial till as Type A.
According to WISHA, for temporary excavations of less than 20 feet in depth, the side slopes
in Type B soils should be laid back at an inclination of 1 H:1 V or flatter from the toe to the top of the
slope. Type A soils exposed slope faces should be covered with a durable reinforced plastic
membrane, jute matting, or other erosion control mats during construction to prevent slope raveling
and rutting during periods of precipitation. These guidelines assume that all surface loads are kept
at a minimum distance of at least one half the depth of the cut away from the top of the slope and
that significant seepage is not present on the slope face. Flatter cut slopes will be necessary where
significant raveling or seepage occurs, or if construction materials will be stockpiled along the top of
the slope.
Where it is not feasible to slope the site soils back at these inclinations, a retaining structure
should be considered. Where retaining structures are greater than 4 feet in height (bottom of footing
to top of structure) or have slopes of greater than 15 percent above them, they should be engineered
per Washington Administrative Code (WAC 51-16-080 item 5). This information is provided solely for
the benefit of the owner and other design consultants, and should not be construed to imply that
GeoResources assumes responsibility for job site safety. It is understood that job site safety is the
sole responsibility of the project contractor.
Site Drainage
All ground surfaces, pavements and sidewalks at the site should be sloped to direct water
away from the structures and property lines. Surface water runoff should be controlled by a system
of curbs, berms, drainage swales, and or catch basins, and conveyed to an appropriate discharge
000001�,--
GEO RESOURCES
earth 5cicnre d geMuhnlcal cngirecring
Davis.S348thSt.RG
August 24, 2021
Page 1 8
point. We recommend that footing drains be installed for the structure in accordance with IBC 1805.4.2.
The roof drain should not be connected to the footing drain. If footings extend below the adjacent
municipal stormwater system, a sump and pump system may be required.
Stormwater Infiltration
Based on our site observations, knowledge of the 2016 King County Surface Water Design
Manual and our subsurface explorations, it is our opinion that onsite infiltration of the stormwater
generated by the proposed development is likely not feasible for this project.
Per Section 5.2.1 of the 2016 KCSWDM, stormwater runoff cannot be infiltrated into
undocumented fill. Additionally, impermeable glacial till underlies the undocumented fill. Therefore,
traditional onsite infiltration or dispersion of stormwater runoff generated by the proposed
development is likely not feasible for this project because of site constraints.
We recommend that stormwater runoff should be collected and conveyed to an appropriate
discharge point below the eastern slope, if feasible. Appropriate erosion and sediment control
measures should be included in the plans to limit the potential for erosion at the site.
EARTHWORK RECOMMENDATIONS
Site Preparation
While no topsoil was observed in our explorations, some vegetation will likely need to be
removed along with any other deleterious materials including existing structures, foundations, or
abandoned utility lines. Areas of thicker topsoil or organic debris may be encountered in areas of
heavy vegetation or depressions.
Where placement of fill material is required, the stripped/exposed subgrade areas should be
compacted to a firm and unyielding surface prior to placement of any fill. Excavations for debris
removal should be backfilled with structural fill compacted to the densities described in the
"Structural Fill" section of this report.
We recommend that a member of our staff evaluate the exposed subgrade conditions after
removal of vegetation and topsoil stripping is completed and prior to placement of structural fill. The
exposed subgrade soil should be proof -rolled with heavy rubber -tired equipment during dry weather
or probed with a 1 /2-inch-diameter steel rod during wet weather conditions.
Soft, loose, or otherwise unsuitable areas delineated during proofrolling or probing should be
recompacted, if practical, or over -excavated and replaced with structural fill. The depth and extent of
overexcavation should be evaluated by our field representative at the time of construction. The areas
of old fill material should be evaluated during grading operations to determine if they need mitigation;
recompaction or removal.
Structural Fill
All material placed as fill associated with mass grading, as utility trench backfill, under building
areas, or under roadways should be placed as structural fill. Material placed for structural fill should
be free of debris, organic matter, trash and cobbles greater than 3 inches in diameter. The moisture
content of the fill material should be adjusted as necessary for proper compaction.
The suitability of material for use as structural fill will depend on the gradation and moisture
content of the soil. As the amount of fines (material passing US No. 200 sieve) increases, soil becomes
increasingly sensitive to small changes in moisture content and adequate compaction becomes more
GEO RESOURCES
earth 5cicnre d geMuhnical cngirecring
Davis.S348thSt.RG
August 24, 2021
Page 1 9
difficult to achieve. During wet weather, we recommend use of well -graded sand and gravel with less
than 5 percent (by weight) passing the US No. 200 sieve, such as Gravel Backfill for Walls (WSDOT 9-
03.12(2)). If prolonged dry weather prevails during the earthwork and foundation installation phase
of construction, higher fines content (up to 10 to 12 percent) may be acceptable.
The structural fill should be placed in horizontal lifts of appropriate thickness to allow
adequate and uniform compaction of each lift. Structural fill should be compacted to at least 95
percent of MDD (maximum dry density as determined in accordance with ASTM D1557).
The appropriate lift thickness will depend on the structural fill characteristics and compaction
equipment used. As a general rule, lift thicknesses should not exceed about 4- to 6-inches when using
hand operated equipment such as jumping jacks or plate compactors. Thicker lifts, up to about 12
inches, may be appropriate for larger equipment such as rollers or hoe -packs. We recommend that
our representative be present during site grading activities to observe and document the earthwork
activities and perform in -place field density tests.
Suitability of On -Site Materials as Fill
During dry weather construction, non -organic on -site soil may be considered for use as
structural fill; provided it meets the criteria described above in the "Structural Fill" section and can
be compacted as recommended. If the soil material is over -optimum in moisture content when
excavated, it will be necessary to aerate or dry the soil prior to placement as structural fill. We
generally did not observe the site soils to be excessively moist at the time of our subsurface
exploration program.
The native glacial till and the existing fill encountered at the locations explored generally
consisted of silty sandy gravel and poorly graded gravel with sand. These soils are generally
comparable to "common ,borrovV' material (WSDOT Common Borrow 9-03.14(3)) and will be suitable
for use as structural fill provided the moisture content is maintained within 2 percent of the optimum
moisture level. Because of the high fines content, these soils are moisture sensitive, and will be
difficult to impossible to compact during wet weather conditions, or where seepage occurs. If these
soils are excessively moist to saturated, it will be necessary to aerate or dry the soil prior to placement
as structural fill.
We recommend that completed graded -areas be restricted from traffic or protected prior to
wet weather conditions. The graded areas may be protected by placing a layer of clean crushed rock
material containing less than 5 percent fin or a rat slab of CDF.
Erosion Control
Weathering, erosion and the resulting surficial sloughing and shallow land sliding are natural
processes. As noted, no evidence of surficial raveling or sloughing was observed at the site. To
manage and reduce the potential for these natural processes, we recommend erosion hazards be
mitigated by applying Best Management Practices (BMPs), as outlined in the 2016 KCSWDM. The
project civil engineer/designer, should prepare a drainage and temporary erosion control plan per the
KCSWDM showing which BMPs will be used.
Temporary erosion control BMPs should be installed at the site prior to the beginning of
clearing, grading, or other construction activities, and should be updated and maintained throughout
construction until final site stabilization is established. Temporary erosion control BMPs may include,
but are not limited to:
G E 0 R E S 0 U R C E S
earth 5cicnre d geMuhnlcal cngirecring
Davis.S348thSt.RG
August 24, 2021
page 1 10
• Silt fencing and appropriate soil stockpiling techniques to prevent silty stormwater
from leaving the site,
• Jute matting, hydroseeding, or plastic covering to protect exposed soils,
• Straw wattles, quarry spall armoring, check dams, or other energy attenuation BMPs
to slow the flow of stormwater over slopes and within drainage channels, and,
• Swales and berms to convey construction stormwater away from the slope.
Erosion protection measures should be in place prior to the start of grading activity on the
site. Where native vegetated is removed because of clearing and grading activities, a dense vegetative
groundcover, grass lawn, or native vegetation should be reestablished as soon as feasible. Permanent
erosion control, such as mulched landscaping areas, groundcovers, hardscaping, or grass lawns,
should be established as soon as feasible once final grades have been completed. All permanent
erosion control methods should be maintained after construction activities have been completed.
LIMITATIONS
We have prepared this report for Mr. Steve Davis and other members of the permitting and
design team for use in evaluating a portion of this project. Subsurface conditions described herein
are based on our observations of exposed soils on the parcel. This report may be made available to
regulatory agencies or others, but this report and conclusions should not be construed as a warranty
of subsurface conditions. Subsurface conditions can vary over short distances and can change with
time.
Variations in subsurface conditions are possible between the explorations and may also occur
with time. A contingency for unanticipated conditions should be included in the budget and
schedule. Sufficient monitoring, testing and consultation should be provided by our firm during
construction to confirm that the conditions encountered are consistent with those indicated by the
explorations, to provide recommendations for design changes should the conditions revealed during
the work differ from those anticipated, and to evaluate whether earthwork and foundation installation
activities comply with contract plans and specifications.
The scope of our services does not include services related to environmental remediation and
construction safety precautions. Our recommendations are not intended to direct the contractor's
methods, techniques, sequences or procedures, except as specifically described in our report for
consideration in design.
If there are any changes in the loads, grades, locations, configurations or type of facilities to be
constructed, the conclusions and recommendations presented in this report may not be fully
applicable. If such changes are made, we should be given the opportunity to review our
recommendations and provide written modifications or verifications, as appropriate.
G E 0 R E S 0 U R C E S
earth 5cicnre d geMuhnical cngirccring
Davis.S348thSt.RG
August 24, 2021
page 1 11
We have appreciated the opportunity to be of service to you on this project. If you have any
questions or comments, please do not hesitate to call at your earliest convenience.
Respectfully submitted,
GeoResources, LLC
Y�V /'4"�
Davis Carlsen, GIT
Staff Geologist
Keith S. Schembs, LEG Eric W. Heller, PE,LG
Principal Senior Geotechnical Engineer
DC:KSS:EWH/dc
DoclD: Davis.S348thSt.RG
Attachments: Figure 1: Site location Map
Figure 2: Site & Exploration Plan
Figure 3: Site Vicinity Map
Figure 4: NRCS Soils Map
Figure 5: Geologic Map
Figure 6: Typical Wall Drainage & Backfill Detail
Appendix A - Subsurface Explorations
Appendix B - Laboratory Test results
G E 0 R E S 0 U R C E S
earth 5cicnre K geMuhnical cngireering
Qctnt Rd
5 v
r �
Dash Point °
Rate Park
Lak�'I❑
r
SW 320Lh st
SW 3401h SL
5W 344[
sit
4,.I [
}'•Tr'tlt�ll
F�
-{ s2s8rh
st
4
��
-
-[ N•.t• 3
�•
�ooth st
--
,
- 298M St
2
Q�rC
•:; 3onlh
9 s[
- .titi 4�L9
.70 JVI
6 3G4[h st
�{
Steel fake£
Doflo f
q
a 1
L2ke P2 rk
{
k 1;[NN!
r.-`;;-, 3120151
r;
w°
w15t1
Lake
;'+
s 316th FI
N
S�
M :13611, SW [ W
st
m it
t�
h v
- 3 r,rh
•�
p �y
c
Ylou
E 320th SL
�.1 r
'„f� '� '" R
L� hit TJ
ti 3215[
2
..
Federal
n r.
-
IN
i
Way y
3:
6 Z330 ,^
., serth
North fake �3"tbs -
=
Ln
KiUs
c.,i llc'1
ILh st sw .
�
eoundaly
P
/17
Lccke Ge,l Va
•n'aLland Park
7
5 :549Lh =
s[
Y
c
N
it
s
. }
Lake .. ..
ti s° �
'c
r'
Q
K."Yame'r
m
S14 q 5.356[h Sit
]61 +
_
Algona
Stu,: 1;
sttA
V
S 360[h f;.
1 sC 3 st Ave S
AI-N
n
2
a Fr•;en7ife
n
.
;E
Elling.n Rd
-
�
.i t it
Pacific
xr�Y
MM
ton
Approximate Site Location
Map created from King County iMap (https://gismaps.kingcounty.gov/iMap/)
GEORESOURCES
earth science & geotechnical engineering
4809 Pacific Hwy. E. I Fife, WA 98424 1 253.896,1011 1 www. g eore sources. rocks
Not to Scale
Site Location Map
Proposed Commercial Development
803 South 348t" Street
Federal Way, Washington
PN: 2021049087
DocID: Davis.S348thSt.F August 2021 Figure 1
6
1
JkiirdAr
I IF
-
i� `J { Yi
1�
jugWo
■
■
■
. k
1
_ 1
f
r—
Notes:
Provided Site Plan
Not to Scale
TP-# Exploration number and approximate locations (GeoResources 2021)
,r
■00,0
� ■ k WN
il
NORTH G E 0 R E S 0 U R C E S
earth science & geotechnical engineering
4809 Pacific Hwy, E. I Fife, WA 98424 1 253.890.1011 1 www, genre so urces.rocks
P.m
Site & Exploration Map
Proposed Commercial Development
803 South 348t" Street
Federal Way, Washington
PN: 2021049087
DocID: Davis.S348thSt.F August 2021 Figure 2
Approximate Site Location
Map created from King County iMap (https://gismaps.kingcounty.gov/iMap/)
GEORESOURCES
earth science & geotechnical engineering
4809 Pacific Hwy. E. I Fife, WA 98424 1 253.896.1011 1 www. g eore sources. rocks
Site Vicinity Map
Proposed Commercial Development
803 South 348t" Street
Federal Way, Washington
PN: 2021049087
Not to Scale
Approximate Site Location
Map created from Web Soil Survey (http://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx)
Soil
Erosion
Hydrologic
Soil Name
Parent Material
Slopes
Type
Hazard
Soils Group
Everett-Alderwood
Slight to
EwC
gravelly sandy
Basal till with some volcanic ash
6 to 15
B
Moderate
loams
No
Norma sandy loam
Alluvium
0 to 2
Slight
A/D
Sk
Seattle Muck
Grassy organic material
0 to 1
Slight
B/D
GEORESOURCES
earth science & geotechnical engineering
4809 Pacific Hwy. E. I Fife, WA 98424 1 253.896.1011 1 www. g eore sources. rocks
NRCS Soils Map
Proposed Commercial Development
803 South 348t" Street
Federal Way, Washington
PN: 2021049087
Not to Scale
WAS
IN
Qvt
_ r i Nall
L
ia. _... NMI *. ;I ■T
aafir+ rr
— 4
V
Of
Qvr ti ti
Qvt..
� 7
1.
° T r.
Approximate Site Location
An excerpt from the Geologic Map of the PovertyBay 7.5-Minute Quadrangle, Washington
by Derek B. Booth, Howard H. Waldron, and Kathy G. Troost (2003)
Qvr Recessional outwash deposits
Qvt Glacial Till
GEORESOURCES
earth science & geotechnical engineering
4809 Pacific Hwy. E. I Fife, WA 98424 1 253.896.1011 1 www. g eore sources. rocks
Not to Scale
Geologic Map
Proposed Commercial Development
803 South 348t" Street
Federal Way, Washington
PN: 2021049087
DocID: Davis.S348thSt.F August 2021 Figure 5
SLOPED TO DRAIN ELOW GRADE WALL
AWAY FROM STRUCTURE
--DRAINAGE SAND AND GRAVEL
COS TYPE 26 (SEE NOT E 3)
PAVEMENT OR 18"
:'.
DAMP PROOFING
IMPERVIOUS SOIL
WEEP HOLES (SEE NOTE 1)
WALL SACKFILL
SEE NOTE 2=`-
'; >
FLOOR SLAB
EXCAVATION SLOPE
—VAPOR RETARDER
CONTRACTOR'S REPSONSIBILITY
Z
}
Z
6" MIN ON SIDES OF PIPE:
i
Z �
2" BELO
r Z
WASHED PEA GRAVEL'CLEAN
CRUSHED GRAVEL
-PERIMETER `SUBDRAIN PIPE
Notes
1. Washed pea gravel/crushed rock beneath floor slab could be 6.
The subdrain should consist of 4" diameter (minimum),
hydraulically connected to perimeter/subdrain pipe. Use of 1"
slotted or perforated plastic pipe meeting the requirements
diameter weep holes as shown is one applicable method. Crushed
of AASHTO M 304; 1/8-inch maximum slot width; 3/16- to 3/8-
gravel should consist of 3/4" minus. Washed pea gravel should consist
inch perforated pipe holes in the lower half of pipe, with
of 3/8" to No. 8 standard sieve.
lower third segment unperforated for water flow; tightjoints;
sloped at a minimum of 6'7100'to drain; cleanouts to be
2. Wall backfill should meet WSDOT Gravel Backfill for walls Specification
provided at regular intervals.
9-03-12(2).
3. Drainage sand and gravel backfill within 18" of wall should be
compacted with hand -operated equipment. Heavy equipment should
not be used for backfill, as such equipment operated near the wall
could increase lateral earth pressures and possibly damage the wall.
The table below presents the drainage sand and gravel gradation.
4. All wall back fill should be placed in layers not exceeding 4" loose
thickness for light equipment and 8" for heavy equipment and should
be densely compacted. Beneath paved or sidewalk areas, compact to
at least 95% Modified Proctor maximum density (ASTM: 01557-70
Method Q. In landscaping areas, compact to 90% minimum.
5. Drainage sand and gravel may be replaced with a geocomposite core
sheet drain placed against the wall and connected to the subdrain
pipe. The geocomposite core sheet should have a minimum
transmissivity of 3.0 gallons/minute/foot when tested under a gradient
of 1.0 according to ASTM 04716.
GEORESOURCES
earth science & gecitechnical engineering
4609 Pacific Hwy. E. I Fife, WA 98424 1 253.896.1011 1 www. georesources.rocks
7. Surround subdrain pipe with 8 inches (minimum) of washed
pea gravel (2" below pipe" or 5/8" minus clean crushed gravel.
Washed pea gravel to be graded from 3/8-inch to No.8
standard sieve.
8. See text for floor slab subgrade preparation.
Materials
Drainage Sand
and Gravel
Y4" Minus Crushed Gravel
Sieve Size
% Passing by
Sieve Size
% Passing by
Weight
Weight
3/"
100
3/4'
100
No4
28-56
W,
75-100
No8
20-50
1/4"
0-25
No50
3-12
No 100
0-2
No 100
0-2
(by wet
(non -plastic)
na1
Typical Wall Drainage and Backfill Detail
Proposed Commercial Development
803 South 3481" Street
Federal Way, Washington
PN:2021049087
Appendix A
Subsurface Explorations
SOIL CLASSIFICATION SYSTEM
MAJOR DIVISIONS
GROUP
GROUP NAME
SYMBOL
GRAVEL
CLEAN
GW
WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL
GRAVEL
GP
POORLY -GRADED GRAVEL
COARSE
GRAINED
More than 50%
GRAVEL
GM
SILTY GRAVEL
SOILS
Of Coarse Fraction
WITH FINES
Retained on
GC
CLAYEY GRAVEL
No. 4 Sieve
SAND
CLEAN SAND
SW
WELL -GRADED SAND, FINE TO COARSE SAND
More than 50%
SP
POORLY -GRADED SAND
Retained on
No. 200 Sieve
More than 50%
SAND
SM
SILTY SAND
Of Coarse Fraction
WITH FINES
Passes
SC
CLAYEY SAND
No. 4 Sieve
SILT AND CLAY
INORGANIC
ML
SILT
CL
CLAY
FINE
GRAINED
SOILS
Liquid Limit
ORGANIC
OL
ORGANIC SILT, ORGANIC CLAY
Less than 50
SILT AND CLAY
INORGANIC
MH
SILT OF HIGH PLASTICITY, ELASTIC SILT
CH
CLAY OF HIGH PLASTICITY, FAT CLAY
More than 50%
Passes
No. 200 Sieve
Liquid Limit
ORGANIC
OH
ORGANIC CLAY, ORGANIC SILT
50 or more
HIGHLY ORGANIC SOILS
PT
PEAT
NOTES:
Field classification is based on visual examination of soil
in general accordance with ASTM D2488-90.
2. Soil classification using laboratory tests is based on
ASTM D2487-90.
3. Description of soil density or consistency are based on
interpretation of blow count data, visual appearance of
soils, and or test data.
G EORESOU RCES
earth science & geotechnical engineering
4809 Pacific Hwy, E. I Fife, WA 98424 1 253.895.1011 1 www. georesources.rocks
SOIL MOISTURE MODIFIERS:
Dry- Absence of moisture, dry to the touch
Moist- Damp, but no visible water
Wet- Visible free water or saturated, usually soil is
obtained from below water table
Unified Soils Classification System
Proposed Commercial Development
803 South 348t" Street
Federal Way, Washington
PN: 2021049087
Test Pit TP-1
Location: Northern portion of site
Approximate Elevation: 227'
Depth (ft) Soil Type Soil Description
0 - 5'/4 GP Grey poorly graded GRAVEL with some coarse sand (dense, moist) (undocumented fill)
51/4 - 81/4 SM Grey -tan silty sandy GRAVEL (dense, moist) (glacial till)
Terminated at 8'/4 feet below ground surface.
No caving observed at time of excavation
No groundwater seepage observed.
Mottling observed at approximately 51/4 feet below ground surface
Test Pit TP-2
Location: Central portion of site
Approximate Elevation: 226'
Depth (ft) Soil Type Soil Description
0 - 71/2 GP Grey poorly graded GRAVEL with some coarse sand (dense, moist) (undocumented fill)
71/2 - 8 SM Grey -tan silty sandy GRAVEL (dense, moist) (glacial till)
Terminated at 8 feet below ground surface.
No caving observed at time of excavation
No groundwater seepage observed.
Mottling observed at approximately 71/2 feet below ground surface
Logged by: DC Excavated on: August 3, 2021
G EORESOU RCES
earth science & geotechnical engineering
4809 Pacific Hwy, E. I Fife, WA 98424 1 253.996.1011 1 www. georesources.rocks
Test Pit Logs
Proposed Commercial Development
803 South 348t" Street
Federal Way, Washington
PN: 2021049087
Depth (ft)
0 - 7
7 - 8
Logged by: DC
Test Pit TP-3
Location: Southern portion of site
Approximate Elevation: 225'
Soil Type Soil Description
GP Grey poorly graded GRAVEL with some coarse sand (dense, moist) (undocumented fill)
SM Grey -tan silty sandy GRAVEL (dense, moist) (glacial till)
Terminated at 8 feet below ground surface.
No caving observed at time of excavation
No groundwater seepage observed.
Mottling observed at approximately 7 feet below ground surface
G EORESOU RCES
earth science & geotechnical engineering
4809 Pacific Hwy, E. I Fife, WA 98424 1 253.996.1011 1 www. georesources.rocks
Excavated on: August 3, 2021
Test Pit Logs
Proposed Commercial Development
803 South 348t" Street
Federal Way, Washington
PN: 2021049087
Appendix 6
Laboratory Test Results
Particle Size Distribution Report
d _d_ _� o N0M00 0 oao(�
100
90
80
70
Z 60
Z
uJ
0�
40
uJ
30
20
10
0
100 10 1 0.1 0.01 0.001
GF; AIN SIZE - mm
%13"
% Gravel
% Sand
% Fines
Coarse
Fine
Coarse
Medium
Fine
Silt Clay
0.0
1 35.7
30.5
4.2
5.5
9.8
14.3
Test Results (ASTM D 6913 & ASTM D 1140)
Opening
Percent
Spec."
Pass?
Size
Finer
(Percent)
(X=Fail)
2.0
100.0
1.5
91.0
1.25
83.6
1
69.7
.75
64.3
.5
46.7
0.375
41.7
#4
33.8
#10
29.6
#20
26.8
#40
24.1
#60
20.8
#100
17.7
#200
14.3
(no specification provided)
Location: TP-1, S-1
Sample Number: 102356 Depth: 7
GeoResources, LLC
Fife, WA
Tested By:
Material Description
Silty Sandy GRAVEL (GM)
Atterberg Limits (ASTM D 4318)
PL= NP
LL= NV
PI= NP
Classification
USCS (D 2487)=
GM AASHTO (M 145)= A-1-a
Coefficients
D90= 36.9309
D85= 32.5855
D60= 16.8936
D50= 13.7780
D30= 2.2605
D95= 0.0869
D10=
Cu=
Cc=
Remarks
Natural Moisture: 4.0%
Date Received: 7/30/21 Date Tested: 8/17/21
Tested By: MAW
Checked By: KSS
Title: PM
Client: Steve Davis
Project: Proposed Commerical Development
Checked By:
Date Sampled: 7/30/21
Appendix C - WWHM
Technical Information Report
Davis BigFoot Java Federal Way
KWO Engineering, PLLC
January 2022
WWH?
PROJECT
General Model Information
Project Name: Davis BFJ tank 2
Site Name:
Davis BFJ
Site Address:
City:
Federal Way
Report Date:
11 /11 /2021
Gage:
Seatac
Data Start:
1948/10/01
Data End:
2009/09/30
Timestep:
15 Minute
Precip Scale:
1.000
Version Date:
2019/09/13
Version:
4.2.17
POC Thresholds
Low Flow Threshold for POC1: 50 Percent of the 2 Year
High Flow Threshold for POC1: 50 Year
Davis BFJ tank 2 11/11/2021 11:17:15 AM Page 2
Landuse Basin
Data
Predeveloped Land
Use
Basin 1
Bypass:
No
GroundWater:
No
Pervious Land Use
acre
C, Forest, Flat
0.607
Pervious Total
0.607
Impervious Land Use
acre
Impervious Total
0
Basin Total
0.607
Element Flows To:
Surface Interflow Groundwater
Davis BFJ tank 2 11/11/2021 11:17:15 AM Page 3
Mitigated Land Use
Basin 1
Bypass: No
GroundWater: No
Pervious Land Use
acre
C, Pasture, Flat
0.188
Pervious Total
0.188
Impervious Land Use acre
ROADS FLAT 0.419
Impervious Total 0.419
Basin Total 0.607
Element Flows To:
Surface
Tank 1
Interflow
Tank 1
Groundwater
Davis BFJ tank 2 11/11/2021 11:17:15 AM Page 4
Routing Elements
Predeveloped Routing
Davis BFJ tank 2 11/11/2021 11:17:15 AM Page 5
Mitigated Routing
Tank 1
Dimensions
Depth:
Tank Type:
Diameter:
Length:
Discharge Structure
Riser Height:
Riser Diameter:
Orifice 1 Diameter:
Orifice 2 Diameter:
Orifice 3 Diameter:
Element Flows To:
Outlet 1
8 ft.
Circular
8 ft.
185 ft.
7.5 ft.
12 in.
0.39 in. Elevation:0 ft.
1 in. Elevation:5.5 ft.
0.5 in. Elevation:7 ft.
Outlet 2
Tank Hydraulic Table
Stage(feet)
Area(ac.)
Volume(ac-ft.)
Discharge(cfs)
Infilt(cfs)
0.0000
0.000
0.000
0.000
0.000
0.0889
0.007
0.000
0.001
0.000
0.1778
0.010
0.001
0.001
0.000
0.2667
0.012
0.002
0.002
0.000
0.3556
0.014
0.003
0.002
0.000
0.4444
0.015
0.004
0.002
0.000
0.5333
0.017
0.006
0.003
0.000
0.6222
0.018
0.007
0.003
0.000
0.7111
0.019
0.009
0.003
0.000
0.8000
0.020
0.011
0.003
0.000
0.8889
0.021
0.013
0.003
0.000
0.9778
0.022
0.014
0.004
0.000
1.0667
0.023
0.016
0.004
0.000
1.1556
0.023
0.019
0.004
0.000
1.2444
0.024
0.021
0.004
0.000
1.3333
0.025
0.023
0.004
0.000
1.4222
0.026
0.025
0.004
0.000
1.5111
0.026
0.028
0.005
0.000
1.6000
0.027
0.030
0.005
0.000
1.6889
0.027
0.032
0.005
0.000
1.7778
0.028
0.035
0.005
0.000
1.8667
0.028
0.037
0.005
0.000
1.9556
0.029
0.040
0.005
0.000
2.0444
0.029
0.043
0.005
0.000
2.1333
0.030
0.045
0.006
0.000
2.2222
0.030
0.048
0.006
0.000
2.3111
0.030
0.051
0.006
0.000
2.4000
0.031
0.053
0.006
0.000
2.4889
0.031
0.056
0.006
0.000
2.5778
0.031
0.059
0.006
0.000
2.6667
0.032
0.062
0.006
0.000
2.7556
0.032
0.065
0.006
0.000
2.8444
0.032
0.068
0.007
0.000
2.9333
0.032
0.070
0.007
0.000
3.0222
0.032
0.073
0.007
0.000
3.1111
0.033
0.076
0.007
0.000
Davis BFJ tank 2 11/11/2021 11:17:15 AM Page 6
3.2000
0.033
0.079
0.007
0.000
3.2889
0.033
0.082
0.007
0.000
3.3778
0.033
0.085
0.007
0.000
3.4667
0.033
0.088
0.007
0.000
3.5556
0.033
0.091
0.007
0.000
3.6444
0.033
0.094
0.007
0.000
3.7333
0.033
0.097
0.008
0.000
3.8222
0.033
0.100
0.008
0.000
3.9111
0.034
0.103
0.008
0.000
4.0000
0.034
0.106
0.008
0.000
4.0889
0.034
0.109
0.008
0.000
4.1778
0.033
0.112
0.008
0.000
4.2667
0.033
0.115
0.008
0.000
4.3556
0.033
0.118
0.008
0.000
4.4444
0.033
0.121
0.008
0.000
4.5333
0.033
0.124
0.008
0.000
4.6222
0.033
0.127
0.008
0.000
4.7111
0.033
0.130
0.009
0.000
4.8000
0.033
0.133
0.009
0.000
4.8889
0.033
0.136
0.009
0.000
4.9778
0.032
0.139
0.009
0.000
5.0667
0.032
0.142
0.009
0.000
5.1556
0.032
0.145
0.009
0.000
5.2444
0.032
0.148
0.009
0.000
5.3333
0.032
0.151
0.009
0.000
5.4222
0.031
0.154
0.009
0.000
5.5111
0.031
0.156
0.012
0.000
5.6000
0.031
0.159
0.018
0.000
5.6889
0.030
0.162
0.021
0.000
5.7778
0.030
0.165
0.024
0.000
5.8667
0.030
0.167
0.026
0.000
5.9556
0.029
0.170
0.028
0.000
6.0444
0.029
0.173
0.030
0.000
6.1333
0.028
0.175
0.031
0.000
6.2222
0.028
0.178
0.033
0.000
6.3111
0.027
0.180
0.034
0.000
6.4000
0.027
0.183
0.036
0.000
6.4889
0.026
0.185
0.037
0.000
6.5778
0.026
0.187
0.038
0.000
6.6667
0.025
0.190
0.040
0.000
6.7556
0.024
0.192
0.041
0.000
6.8444
0.023
0.194
0.042
0.000
6.9333
0.023
0.196
0.043
0.000
7.0222
0.022
0.198
0.045
0.000
7.1111
0.021
0.200
0.047
0.000
7.2000
0.020
0.202
0.049
0.000
7.2889
0.019
0.204
0.051
0.000
7.3778
0.018
0.205
0.052
0.000
7.4667
0.017
0.207
0.054
0.000
7.5556
0.015
0.208
0.194
0.000
7.6444
0.014
0.210
0.629
0.000
7.7333
0.012
0.211
1.172
0.000
7.8222
0.010
0.212
1.686
0.000
7.9111
0.007
0.213
2.056
0.000
8.0000
0.000
0.213
2.264
0.000
8.0889
0.000
0.000
2.479
0.000
Davis BFJ tank 2 11/11/2021 11:17:15 AM Page 7
Analysis Results
POC 1
oo
>o
ioo
>
Per-- Time Exce m—,
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area: 0.607
Total Impervious Area: 0
Mitigated Landuse Totals for POC #1
Total Pervious Area: 0.188
Total Impervious Area: 0.419
Flow Frequency Method: Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period
Flow(cfs)
2 year
0.017846
5 year
0.028028
10 year
0.033799
25 year
0.039912
50 year
0.043695
100 year
0.046912
Flow Frequency Return Periods for Mitigated
Return Period
Flow(cfs)
2 year
0.009395
5 year
0.015202
10 year
0.020392
25 year
0.02884
50 year
0.036762
100 year
0.046324
Annual Peaks
Annual Peaks for Predeveloped and Mitigated
Year
Predeveloped
Mitigated
1949
0.018
0.007
1950
0.022
0.009
1951
0.039
0.034
1952
0.012
0.007
1953
0.010
0.008
1954
0.015
0.008
1955
0.025
0.008
1956
0.020
0.009
1957
0.016
0.008
1958
0.018
0.008
POC #1
POC #1
Davis BFJ tank 2 11/11/2021 11:17:15 AM Page 8
1959
0.015
0.007
1960
0.027
0.022
1961
0.015
0.009
1962
0.009
0.007
1963
0.013
0.008
1964
0.017
0.008
1965
0.012
0.009
1966
0.012
0.008
1967
0.024
0.008
1968
0.015
0.008
1969
0.015
0.008
1970
0.012
0.008
1971
0.013
0.008
1972
0.029
0.030
1973
0.013
0.009
1974
0.014
0.008
1975
0.020
0.008
1976
0.014
0.008
1977
0.002
0.007
1978
0.012
0.008
1979
0.007
0.006
1980
0.028
0.031
1981
0.011
0.008
1982
0.021
0.009
1983
0.019
0.008
1984
0.012
0.007
1985
0.007
0.007
1986
0.031
0.009
1987
0.027
0.010
1988
0.011
0.007
1989
0.007
0.007
1990
0.057
0.021
1991
0.034
0.015
1992
0.013
0.009
1993
0.014
0.007
1994
0.005
0.006
1995
0.020
0.009
1996
0.042
0.033
1997
0.035
0.037
1998
0.008
0.007
1999
0.033
0.023
2000
0.014
0.008
2001
0.002
0.006
2002
0.015
0.009
2003
0.019
0.007
2004
0.025
0.028
2005
0.018
0.008
2006
0.021
0.010
2007
0.042
0.041
2008
0.055
0.028
2009
0.027
0.009
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0572 0.0411
2 0.0548 0.0367
3 0.0425 0.0337
Davis BFJ tank 2 11/11/2021 11:17:47 AM Page 9
4
0.0418
0.0331
5
0.0393
0.0315
6
0.0350
0.0300
7
0.0344
0.0281
8
0.0328
0.0279
9
0.0309
0.0229
10
0.0293
0.0221
11
0.0277
0.0211
12
0.0274
0.0149
13
0.0269
0.0096
14
0.0266
0.0096
15
0.0250
0.0095
16
0.0245
0.0093
17
0.0243
0.0091
18
0.0219
0.0091
19
0.0213
0.0089
20
0.0211
0.0089
21
0.0198
0.0088
22
0.0196
0.0087
23
0.0195
0.0086
24
0.0193
0.0086
25
0.0191
0.0085
26
0.0179
0.0085
27
0.0177
0.0084
28
0.0175
0.0083
29
0.0169
0.0082
30
0.0157
0.0082
31
0.0154
0.0082
32
0.0152
0.0082
33
0.0151
0.0082
34
0.0151
0.0081
35
0.0150
0.0081
36
0.0148
0.0080
37
0.0144
0.0080
38
0.0141
0.0080
39
0.0138
0.0079
40
0.0138
0.0079
41
0.0133
0.0079
42
0.0133
0.0078
43
0.0131
0.0078
44
0.0128
0.0077
45
0.0124
0.0077
46
0.0124
0.0075
47
0.0122
0.0074
48
0.0121
0.0073
49
0.0118
0.0072
50
0.0116
0.0071
51
0.0111
0.0070
52
0.0108
0.0070
53
0.0100
0.0070
54
0.0093
0.0069
55
0.0079
0.0068
56
0.0075
0.0068
57
0.0070
0.0067
58
0.0070
0.0065
59
0.0046
0.0063
60
0.0025
0.0062
61
0.0017
0.0061
Davis BFJ tank 2 11/11/2021 11:17:47 AM Page 10
Davis BFJ tank 2 11/11/2021 11:17:47 AM Page 11
Duration Flows
The Facility PASSED
Flow(cfs)
Predev
Mit
Percentage
Pass/Fail
0.0089
17545
8483
48
Pass
0.0093
16161
5129
31
Pass
0.0096
14964
2259
15
Pass
0.0100
13851
2180
15
Pass
0.0103
12831
2107
16
Pass
0.0107
11832
2039
17
Pass
0.0110
10898
1953
17
Pass
0.0114
10121
1891
18
Pass
0.0117
9388
1817
19
Pass
0.0121
8735
1736
19
Pass
0.0124
8158
1666
20
Pass
0.0128
7604
1612
21
Pass
0.0131
7073
1560
22
Pass
0.0135
6594
1517
23
Pass
0.0138
6145
1480
24
Pass
0.0142
5777
1448
25
Pass
0.0145
5433
1415
26
Pass
0.0149
5103
1385
27
Pass
0.0152
4808
1361
28
Pass
0.0156
4528
1336
29
Pass
0.0159
4259
1310
30
Pass
0.0163
4021
1283
31
Pass
0.0167
3782
1264
33
Pass
0.0170
3546
1230
34
Pass
0.0174
3339
1198
35
Pass
0.0177
3138
1170
37
Pass
0.0181
2954
1147
38
Pass
0.0184
2787
1116
40
Pass
0.0188
2599
1084
41
Pass
0.0191
2449
1051
42
Pass
0.0195
2310
1016
43
Pass
0.0198
2160
973
45
Pass
0.0202
2026
943
46
Pass
0.0205
1899
914
48
Pass
0.0209
1790
888
49
Pass
0.0212
1689
865
51
Pass
0.0216
1590
843
53
Pass
0.0219
1483
808
54
Pass
0.0223
1382
786
56
Pass
0.0226
1292
758
58
Pass
0.0230
1219
728
59
Pass
0.0233
1155
705
61
Pass
0.0237
1098
668
60
Pass
0.0240
1048
648
61
Pass
0.0244
997
625
62
Pass
0.0247
930
599
64
Pass
0.0251
884
564
63
Pass
0.0254
837
536
64
Pass
0.0258
789
505
64
Pass
0.0261
743
483
65
Pass
0.0265
713
456
63
Pass
0.0268
669
427
63
Pass
0.0272
632
394
62
Pass
Davis BFJ tank 2 11/11/2021 11:17:47 AM Page 12
0.0275
596
373
62
Pass
0.0279
567
350
61
Pass
0.0282
539
327
60
Pass
0.0286
496
312
62
Pass
0.0289
473
298
63
Pass
0.0293
434
282
64
Pass
0.0296
400
261
65
Pass
0.0300
367
235
64
Pass
0.0303
348
215
61
Pass
0.0307
323
200
61
Pass
0.0311
296
187
63
Pass
0.0314
272
169
62
Pass
0.0318
256
155
60
Pass
0.0321
235
140
59
Pass
0.0325
217
126
58
Pass
0.0328
196
113
57
Pass
0.0332
180
97
53
Pass
0.0335
158
91
57
Pass
0.0339
145
80
55
Pass
0.0342
129
77
59
Pass
0.0346
119
73
61
Pass
0.0349
109
70
64
Pass
0.0353
97
65
67
Pass
0.0356
91
61
67
Pass
0.0360
82
58
70
Pass
0.0363
76
51
67
Pass
0.0367
68
42
61
Pass
0.0370
61
41
67
Pass
0.0374
54
39
72
Pass
0.0377
48
38
79
Pass
0.0381
41
36
87
Pass
0.0384
38
34
89
Pass
0.0388
33
32
96
Pass
0.0391
27
27
100
Pass
0.0395
22
22
100
Pass
0.0398
21
19
90
Pass
0.0402
20
17
85
Pass
0.0405
19
14
73
Pass
0.0409
17
10
58
Pass
0.0412
14
0
0
Pass
0.0416
12
0
0
Pass
0.0419
9
0
0
Pass
0.0423
4
0
0
Pass
0.0426
3
0
0
Pass
0.0430
3
0
0
Pass
0.0433
3
0
0
Pass
0.0437
3
0
0
Pass
Davis BFJ tank 2 11/11/2021 11:17:47 AM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:
0.0563 acre-feet
On-line facility target flow:
0.0671 cfs.
Adjusted for 15 min:
0.0671 cfs.
Off-line facility target flow:
0.0377 cfs.
Adjusted for 15 min:
0.0377 cfs.
Davis BFJ tank 2 11/11/2021 11:17:47 AM Page 14
LID Report
LID Technique
Usedfor
Total Volume
Volume
Infiltration
Cumulative
Percent
Waterfluality
Percent
Comment
Treatment?
Needs
Through
Volume
Volume
Volume
Water Quality
Treatment
Facility
(ac-ft)
Infiltration
Infiltrated
Treated
(ac-ft)
(ac-ft)
Credit
Tank 1 PDC
❑
68.84
❑
0.00
Total Volume Infiltrated
68.84
0.00
0.00
0.00
0.00
0%
No Treat.
Credit
Duration
Compliance with LID
Analysis
Standard B% oft-yrto 50% of
Result =
yr
Passed
Davis BFJ tank 2 11/11/2021 11:17:47 AM Page 15
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
Davis BFJ tank 2 11/11/2021 11:17:56 AM Page 16
Appendix
Predeveloped Schematic
„ Basin
�0.61ac
Davis BFJ tank 2 11/11/2021 11:17:56 AM Page 17
Mitigated Schematic
SI
Basin
0.61ac
Tank 1
Davis BFJ tank 2 11/11/2021 11:17:57 AM Page 18
Predeveloped UC/ File
Davis BFJ tank 2 11/11/2021 11:17:58 AM Page 19
Mitigated UC/ File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1
END GLOBAL
2009 09 30
FILES
<File>
<Un#>
END FILES
OPN SEQUENCE
UNIT SYSTEM
1
<----------- File Name---
--------------------------->***
***
INGRP INDELT 00:15
PERLND 13
IMPLND 1
RCHRES 1
COPY 1
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<---------- Title ----------- >***TRAN PIVL DIG1 FIL1
1 Tank 1 MAX
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
PYR DIG2 FIL2 YRND
1 2 30 9
<PLS ><------- Name ------- >NBLKS Unit -systems Printer ***
# - # User t-series Engl Metr ***
in out ***
13 C, Pasture, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
13 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT -INFO
<PLS > ***************** Print -flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
Davis BFJ tank 2 11/11/2021 11:17:58 AM Page 20
13 0 0 4 0 0 0 0
0 0 0
0 0 1 9
END PRINT -INFO
PWAT-PARM1
<PLS > PWATER variable monthly parameter
value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW
VIRC VLE INFC HWT ***
13 0 0 0 0 0 0 0
0 0 0
0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2
***
# - # ***FOREST LZSN INFILT
LSUR SLSUR
KVARY AGWRC
13 0 4.5 0.06
400 0.05
0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3
***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR
BASETP AGWETP
13 0 0 2
2 0
0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4
***
# - # CEPSC UZSN NSUR INTFW
IRC
LZETP ***
13 0.15 0.4 0.3
6 0.5
0.4
END PWAT-PARM4
PWAT-STATEI
<PLS > *** Initial conditions at start of
simulation
ran from 1990 to end of 1992 (pat
1-11-95) RUN 21
***
# - # *** CEPS SURS UZS
IFWS LZS
AGWS GWVS
13 0 0 0
0 2.5
1 0
END PWAT-STATEI
END PERLND
IMPLND
GEN-INFO
<PLS ><------- Name ------- > Unit -systems
Printer ***
# - # User t-series
Engl Metr ***
in out
***
1 ROADS/FLAT 1 1 1
27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
1 0 0 1 0 0 0
END ACTIVITY
PRINT -INFO
<ILS > ******** Print -flags ******** PIVL
PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
1 0 0 4 0 0 0 1
9
END PRINT -INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter
value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
1 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2
***
# - # *** LSUR SLSUR NSUR RETSC
1 400 0.01 0.1
0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3
***
Davis BFJ tank 2 11/11/2021 11:17:58 AM Page 21
# - # ***PETMAX PETMIN
1 0 0
END IWAT-PARM3
IWAT-STATEI
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
1 0 0
END IWAT-STATEI
END IMPLND
SCHEMATIC
<-Source->
<--Area-->
<-Target->
MBLK ***
<Name> #
<-factor->
<Name>
#
Tbl# ***
Basin 1***
PERLND 13
0.188
RCHRES
1
2
PERLND 13
0.188
RCHRES
1
3
IMPLND 1
0.419
RCHRES
1
5
******Routing******
PERLND 13
0.188
COPY
1
12
IMPLND 1
0.419
COPY
1
15
PERLND 13
0.188
COPY
1
13
RCHRES 1
1
COPY
501
16
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------ >< --- > User T-series Engl Metr LKFG ***
in out ***
1 Tank 1 1 1 1 1 28 0 1
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
1 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT -INFO
<PLS > ***************** Print -flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
1 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT -INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
1 0 1 0 0 4 0 0 0 0 0 0 0 0 0 2 2 2 2 2
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------ ><-------- ><-------- ><-------- ><-------- ><-------- ><-------- > ***
Davis BFJ tank 2 11/11/2021 11:17:58 AM Page 22
1 1 0.04 0.0 0.0
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section
# - # *** VOL Initial value of COLIND
*** ac-ft for each possible exit
<------><-------- > <--- ><--- ><--- ><--- ><---> ***
1 0 4.0 0.0 0.0 0.0 0.0
END HYDR-INIT
END RCHRES
SPEC -ACTIONS
END SPEC -ACTIONS
FTABLES
FTABLE 1
91 4
Depth Area Volume Outflowl
(ft) (acres) (acre-ft) (cfs)
0.000000 0.000000 0.000000 0.000000
0.088889 0.007123 0.000423 0.001231
0.177778 0.010017 0.001193 0.001740
0.266667 0.012198 0.002183 0.002131
0.355556 0.014004 0.003350 0.002461
0.444444 0.015565 0.004666 0.002752
0.533333 0.016950 0.006112 0.003014
0.622222 0.018199 0.007675 0.003256
0.711111 0.019338 0.009344 0.003481
0.800000 0.020386 0.011110 0.003692
0.888889 0.021355 0.012966 0.003891
0.977778 0.022257 0.014905 0.004081
1.066667 0.023099 0.016921 0.004263
1.155556 0.023888 0.019010 0.004437
1.244444 0.024628 0.021166 0.004604
1.333333 0.025324 0.023387 0.004766
1.422222 0.025980 0.025667 0.004922
1.511111 0.026598 0.028004 0.005074
1.600000 0.027181 0.030395 0.005221
1.688889 0.027731 0.032835 0.005364
1.777778 0.028250 0.035324 0.005503
1.866667 0.028741 0.037857 0.005639
1.955556 0.029203 0.040432 0.005772
2.044444 0.029639 0.043048 0.005902
2.133333 0.030050 0.045701 0.006029
2.222222 0.030436 0.048389 0.006153
2.311111 0.030799 0.051111 0.006275
2.400000 0.031140 0.053864 0.006394
2.488889 0.031458 0.056646 0.006512
2.577778 0.031756 0.059456 0.006627
2.666667 0.032033 0.062291 0.006740
2.755556 0.032290 0.065150 0.006852
2.844444 0.032527 0.068031 0.006961
2.933333 0.032746 0.070932 0.007069
3.022222 0.032945 0.073852 0.007175
3.111111 0.033127 0.076789 0.007280
3.200000 0.033290 0.079741 0.007384
3.288889 0.033435 0.082706 0.007485
3.377778 0.033563 0.085684 0.007586
3.466667 0.033673 0.088672 0.007685
3.555556 0.033766 0.091670 0.007783
3.644444 0.033842 0.094675 0.007880
3.733333 0.033901 0.097686 0.007975
3.822222 0.033943 0.100701 0.008069
3.911111 0.033968 0.103719 0.008163
4.000000 0.033976 0.106739 0.008255
4.088889 0.033968 0.109759 0.008346
4.177778 0.033943 0.112777 0.008436
4.266667 0.033901 0.115793 0.008526
4.355556 0.033842 0.118804 0.008614
4.444444 0.033766 0.121809 0.008702
4.533333 0.033673 0.124806 0.008788
0.5 0.0
***
Initial value of OUTDGT
for each possible exit
<--- ><--- ><--- ><--- ><--->
0.0 0.0 0.0 0.0 0.0
Velocity Travel Time***
(ft/sec) (Minutes)***
Davis BFJ tank 2 11/11/2021 11:17:58 AM Page 23
4.622222 0.033563 0.127794 0.008874
4.711111 0.033435 0.130772 0.008959
4.800000 0.033290 0.133738 0.009043
4.888889 0.033127 0.136690 0.009126
4.977778 0.032945 0.139626 0.009209
5.066667 0.032746 0.142546 0.009291
5.155556 0.032527 0.145447 0.009372
5.244444 0.032290 0.148328 0.009452
5.333333 0.032033 0.151187 0.009532
5.422222 0.031756 0.154022 0.009611
5.511111 0.031458 0.156832 0.012550
5.600000 0.031140 0.159614 0.018349
5.688889 0.030799 0.162367 0.021639
5.777778 0.030436 0.165089 0.024224
5.866667 0.030050 0.167778 0.026429
5.955556 0.029639 0.170431 0.028389
6.044444 0.029203 0.173046 0.030171
6.133333 0.028741 0.175621 0.031818
6.222222 0.028250 0.178155 0.033358
6.311111 0.027731 0.180643 0.034809
6.400000 0.027181 0.183084 0.036186
6.488889 0.026598 0.185474 0.037500
6.577778 0.025980 0.187811 0.038758
6.666667 0.025324 0.190092 0.039968
6.755556 0.024628 0.192312 0.041135
6.844444 0.023888 0.194469 0.042264
6.933333 0.023099 0.196557 0.043357
7.022222 0.022257 0.198574 0.045430
7.111111 0.021355 0.200512 0.047713
7.200000 0.020386 0.202368 0.049491
7.288889 0.019338 0.204134 0.051085
7.377778 0.018199 0.205803 0.052567
7.466667 0.016950 0.207366 0.053969
7.555556 0.015565 0.208813 0.194038
7.644444 0.014004 0.210128 0.629240
7.733333 0.012198 0.211295 1.172877
7.822222 0.010017 0.212286 1.686903
7.911111 0.007123 0.213055 2.056322
8.000000 0.001000 0.213478 2.264700
END FTABLE 1
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name>
#
<Name>
#
#<-factor->strg
<Name>
#
<Name>
tem
strg strg***
RCHRES
1
HYDR
RO
1
1
1
WDM
1000
FLOW
ENGL
REPL
RCHRES
1
HYDR
STAGE
1
1
1
WDM
1001
STAG
ENGL
REPL
COPY
1
OUTPUT
MEAN
1
1
48.4
WDM
701
FLOW
ENGL
REPL
COPY
501
OUTPUT
MEAN
1
1
48.4
WDM
801
FLOW
ENGL
REPL
END EXT
TARGETS
MASS -LINK
<Volume> <-Grp>
<Name>
MASS -LINK
PERLND PWATER
END MASS -LINK
<-Member-><--Mult-->
<Name> # #<-factor->
2
SURO 0.083333
2
MASS -LINK 3
PERLND PWATER IFWO
Davis BFJ tank 2
0.083333
<Target>
<Name>
RCHRES
RCHRES
11/11/2021 11:17:58 AM
<-Grp> <-Member->***
<Name> # #***
INFLOW IVOL
INFLOW IVOL
Page 24
END MASS -LINK
3
MASS -LINK
5
IMPLND IWATER
SURO
0.083333
RCHRES
INFLOW
IVOL
END MASS -LINK
5
MASS -LINK
12
PERLND PWATER
SURO
0.083333
COPY
INPUT
MEAN
END MASS -LINK
12
MASS -LINK
13
PERLND PWATER
IFWO
0.083333
COPY
INPUT
MEAN
END MASS -LINK
13
MASS -LINK
15
IMPLND IWATER
SURO
0.083333
COPY
INPUT
MEAN
END MASS -LINK
15
MASS -LINK
16
RCHRES ROFLOW
COPY
INPUT
MEAN
END MASS -LINK
16
END MASS -LINK
END RUN
Davis BFJ tank 2 11/11/2021 11:17:58 AM Page 25
Predeveloped HSPF Message File
Davis BFJ tank 2 11/11/2021 11:17:58 AM Page 26
Mitigated HSPF Message File
Davis BFJ tank 2 11/11/2021 11:17:58 AM Page 27
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as -is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by: Clear Creek Solutions, Inc. 2005-2021; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
Davis BFJ tank 2 11/11/2021 11:17:58 AM Page 28
Appendix D - Engineering Plans
Technical Information Report
Davis BigFoot Java Federal Way
KWO Engineering, PLLC
January 2022
CITY OF FEDERAL WAY GENERAL NOTES
1. PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO
PRE -CONSTRUCTION MEETING.
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE FEDERAL WAY REVISED CODE
(FWRC), APPLICABLE ORDINANCES, AND THE CITY COUNCIL CONDITIONS OF PROJECT
APPROVAL. THESE DOCUMENTS ARE SUPPLEMENTED BY THE MOST RECENT VERSION
OF THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL
CONSTRUCTION (WSDOT/APWA), THE KING COUNTY ROAD STANDARDS (KCRS), AD THE
KING COUNTY SURFACE WATER DESIGN MANUAL (KCSWDM). IT SHALL BE THE SOLE
RESPONSIBILITY OF THE APPLICANT AND THE PROFESSIONAL ENGINEER TO CORRECT
ANY ERROR, OMISSION, OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN
THESE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST OR LIABILITY TO
THE CITY OF FEDERAL WAY.
3. THE DESIGN ELEMENTS WITHIN THESE PLANS HAVE BEEN REVIEWED ACCORDING TO
FEDERAL WAY ENGINEERING REVIEW CHECKLIST. SOME ELEMENTS MAY HAVE BEEN
OVERLOOKED OR MISSED BY THE CITY ENGINEERING PLAN REVIEWER. ANY VARIANCE
FROM ADOPTED STANDARDS IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY
THE CITY OF FEDERAL WAY, PRIOR TO CONSTRUCTION.
4. APPROVAL OF THIS ROAD, GRADING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AN
APPROVAL OF ANY OTHER CONSTRUCTION (I.E. DOMESTIC WATER CONVEYANCE,
SEWER CONVEYANCE, GAS, ELECTRICITY, ETC).
5. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION
MEETING MUST BE HELD BETWEEN THE CITY OF FEDERAL WAY, THE APPLICANT, AND
THE APPLICANTS CONSTRUCTION REPRESENTATIVE.
6. A SIGNED COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PRORESS.
7. ON -SITE CONSTRUCTION NOISE SHALL BE LIMITED AS PER FWRC (SECTION 19.105.040);
NORMALLY THIS IS 7:00 A.M. TO 8:00 P.M., MONDAY THROUGH FRIDAY, AND 9:00 A.M. TO
8:00 P.M. ON SATURDAYS.
8. RIGHT-OF-WAY CONSTRUCTION IS ALLOWED 8:30 A.M. TO 3:00 P.M. MONDAY THROUGH
FRIDAY. WRITTEN AUTHORIZATION TO WORK OUTSIDE OF THESE HOURS MUST BE
GRANTED BY THE PUBLIC WORKS DIRECTOR.
9. IT SHALL BE THE APPLICANTS /CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL
CONSTRUCTION EASEMENTS NECESSARY BEFORE INITIATING OFF -SITE WORK WITHIN
THE ROAD RIGHT-OF-WAY.
10. FRANCHISED UTILITIES OF OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE
APPROVED PLANS SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS
THAT MEET ALL CITY REQUIREMENTS AND THE REQUIREMENTS OF KCRS CHAPTER 8
ARE SUBMITTED TO THE CITY OF FEDERAL WAY AT LEAST THREE DAYS PRIOR TO
CONSTRUCTION.
11. VERTICAL DATUM SHALL BE KCAS OR NCVD-29.
12. GROUNDWATER SYSTEM CONSTRUCTION SHALL BE WITHIN A RIGHT OF WAY OR
APPROPRIATE DRAINAGE EASEMENTS, BUT NOT UNDERNEATH THE ROADWAY SECTION.
ALL GROUNDWATER SYSTEMS MUST BE CONSTRUCTED IN ACCORDANCE WITH THE
WSDOT/APWA STANDARD SPECIFICATIONS.
13. ALL UTILITY TRENCHES IN THE RIGHT-OF-WAY SHALL BE BACKFILLED 5/8" CRUSHED
ROCK AND COMPACTED TO 95% DENSITY. WHEN TRENCH WIDTH IS 18 INCHES OR LESS,
AND IS WITHIN THE TRAVELED WAY, TRENCH WILL BE BACKFILLED WITH CONTROL
DENSITY FILL (SELF -COMPACTED FLOWABLE FILL) AS DEFINED BY WSDOT 2-09.3(1)e. THE
AGGREGATE WILL BE 318" MINUS.
14. ALL ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95% DENSITY IN
ACCORDANCE WITH WSDOT 2-06.3.
15.OPEN CUTTING OF EXISTING ROADWAYS IS NOT ALLOWED UNLESS SPECIFIALLY
APPROVED BY THE PUBLIC WORKS DIRECTOR AND NOTED ON THESE APPROVED PLANS.
ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH KCRS 8.03(B)3.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS,
SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED
ACTIONS TO PROTECT LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT
PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE
CONTRACTOR. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT
NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH LANE OF
TRAFFIC AFFECTED. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-07.23 -
TRAFFIC CONTROL, SHALL APPLY.
17. CONTRACTOR SHALL PROVIDE AND INSTALL ALL REGULATORY AND WARNING SIGNS PER
THE LATEST EDITION OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
18. ALL UTILITIES SHALL BE ADJUSTED TO FINAL GRADE AFTER PAVING ASPHALT WEARING
COURSE.
19. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION
ONLY. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL
ROCKERIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH CFW DRAWING NUMBERS
3-22, 3-23. ROCKERIES MAY NOT EXCEED SIX FEET IN HEIGHT FOR CUT SECTIONS OR
FOUR FEET IN HEIGHT FOR FILL SECTIONS UNLESS DESIGNED BY A GEOTECHNICAL OR
STRUCTURAL ENGINEER LICENSED IN THE STATE OF WASHINGTON.
CONSTRUCTION SEQUENCE
A. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, HOLD A PRE -CONSTRUCTION
MEETING WITH CITY OF FEDERAL WAY OFFICIALS, THE APPLICANT, AND THE
APPLICANT'S CONSTRUCTION REPRESENTATIVE.
B. FLAG THE CLEARING LIMITS.
C. INSTALL NECESSARY TEMPORARY EROSION CONTROL MEASURES (TESC), INCLUDING
SILT CONTROL FENCE AND INLET PROTECTION. PROTECT LID SYSTEMS FROM
SEDIMENT AND COMPACTION; CLEAN AS REQUIRED.
D. CONSTRUCT IMPROVEMENTS PER PLAN. CLEAR, GRADE, ROUGH GRADE SITE.
E. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS INCLUDING DETENTION AND WATER
QUALITY FACILITIES AND STREET/ROW IMPROVEMENTS.
F. ADJUST TESC PLAN AS NECESSARY FOR SITE CONDITIONS AND WEATHER
THROUGHOUT CONSTRUCTION. LIMIT DURATION OF EXPOSED SOILS AS PRACTICAL.
STABILIZE ALL EXPOSED SOILS. USE PLASTIC COVERING OR EQUAL FOR TEMPORARY
COVER; HYDROSEEDING, LANDSCAPING, OR EQUAL FOR PERMANENT COVER.
G. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION OF THE
ENTIRE SITE. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION.
H. REMOVE TESC MEASURES WITHIN 30 DAYS, FOLLOWING FINAL SITE STABILIZATION.
REMOVE SEDIMENT FROM STORM FACILITIES.
CITY OF FEDERAL WAY DRAINAGE NOTES
1. PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO THE
PRECONSTRUCTION MEETING.
2. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH WSDOT 7-08.3(1). THIS SHALL INCLUDE LEVELING
AND COMPACTING THE TRENCH BOTTOM, THE TOP OF FOUNDATION MATERIAL, AND
REQUIRED PIPE BEDDING, TO A UNIFORM GRADE SO THAT THE ENTIRE PIPE IS
SUPPORTED BY A UNIFORMLY DENSE UNYIELDING BASE.
3. STEEL PIPE SHALL BE GALVANIZED AND HAVE ASPHALT TREATMENT #1 OR BETTER
INSIDE AND OUTSIDE.
4. ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLES, NOT LOCATED
WITHIN A TRAVELED ROADWAY OR SIDEWALK SHALL HAVE SOLID LOCKING LIDS. ALL
DRAINAGE STRUCTURES ASSOCIATED WITH A PERMANENT RETENTION/DETENTION
FACILITY SHALL HAVE SOLID LOCKING LIDS.
5. ALL CATCH BASIN GRATES SHALL CONFORM TO CFW DRAWING NUMBERS 4-1, 4-2, 4-3,
4-4, 4-5, 4-8, OR 4-10.
6. ALL DRIVEWAY CULVERTS LOCATED WITHIN THE RIGHT-OF-WAY SHALL BE OF
SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE
DRIVEWAY TO THE BOTTOM OF THE DITCH. CULVERTS SHALL HAVE BEVELED END
SECTIONS TO MATCH THE SIDE SLOPES.
7. ROCK FOR EROSION PROTECTION OF DITCHES, CHANNELS, AND SWALES, WHERE
REQUIRED, MUST BE OF SOUND QUARRY ROCK, PLACED TO A DEPTH OF ONE FOOT AND
MUST MEET THE FOLLOWING SPECIFICATIONS: 4"-8"ROCK/40%-70% PASSING; 2"4"
ROCK/30%-40% PASSING; AND -2"ROCK/10%-20% PASSING. INSTALLATION SHALL BE IN
ACCORDANCE WITH KCRS DRAWING NUMBER 7-024 OR AS AMENDED BY THE APPROVED
PLANS. RECYCLED ASPHALT OR CONCRETE RUBBLE SHALL NOT BE USED.
8. LOTS NOT APPROVED FOR INFILTRATION SHALL BE PROVIDED WITH DRAINAGE OUTLETS
(STUB -OUTS). STUB -OUTS SHALL CONFORM TO THE FOLLOWING:
A. EACH OUTLET SHALL BE SUITABLY LOCATED AT THE LOWEST ELEVATION ON THE
LOT, SO AS TO SERVICE ALL FUTURE ROOF DOWNSPOUTS AND FOOTING DRAINS,
DRIVEWAYS, YARD DRAINS, AND ANY OTHER SURFACE OR SUB -SURFACE DRAINS
NECESSARY TO RENDER THE LOTS SUITABLE FOR THEIR INTENDED USE. EACH
OUTLET SHALL HAVE FREE -FLOWING, POSITIVE DRAINAGE TO AN APPROVED
STORMWATER CONVEYANCE SYSTEM OR TO AN APPROVED OUTFALL LOCATION.
B. OUTLETS ON EACH LOT SHALL BE LOCATED WITH A FIVE-FOOT HIGH, 2X4 STAKE
MARKED "STORM". THE STUB -OUT SHALL EXTEND ABOVE SURFACE LEVEL, BE
VISIBLE AND BE SECURED TO THE STAKE.
C. PIPE MATERIAL SHALL CONFORM TO UNDERDRAIN SPECIFICATIONS DESCRIBED IN
KCRS 7.03 AND, IF NON-METALLIC, THE PIPE SHALL CONTAIN WIRE OR OTHER
ACCEPTABLE DETECTION.
D. DRAINAGE EASEMENTS ARE REQUIRED FOR DRAINAGE SYSTEMS DESIGNED TO
CONVEY FLOWS THROUGH INDIVIDUAL LOTS.
E. THE APPLICANT/CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE
LOCATIONS OF ALL STUB -OUT CONVEYANCE LINES WITH RESPECT TO THE UTILITIES
(I.E. POWER, GAS, TELEPHONE, TELEVISION.)
F. ALL INDIVIDUAL STUB -OUTS SHALL BE PRIVATELY OWNED AND MAINTAINED BY THE
LOT HOMEOWNER.
G. THE CITY DOES NOT ALLOW TAP -IN OR CUT -IN TEES ON MAINS FOR INDIVIDUAL LOT
DRAINAGE.
VERIFICATION NOTE
'
ALL EXISTING UTILITIES IN THE CONSTRUCTION AREA SHALL BE IDENTIFIED AND VERIFIED FOR DEPTH
AND LOCATION PRIOR TO ANY CONSTRUCTION ACTIVITIES SO AS TO IDENTIFY ANY POTENTIAL
CONFLICTS WITH PROPOSED CONSTRUCTION. PRIOR TO ANY CONSTRUCTION ACTIVITIES, VERIFY
EXISTING TOPOGRAPHY IS CONSISTENT WITH WHAT IS SHOWN ON PLANS. IF THERE ARE ANY
Know what's below.
POTENTIAL CONFLICTS WITH PROPOSED CONSTRUCTION ACTIVITIES, CONTACT THE ENGINEER
Call before you dig.
IMMEDIATELY.
PROJECT CONTACTS
CITY PUBLIC WORKS DEPARTMENT PRECONSTRUCTION/
INSPECTION NOTIFICATION PHONE NUMBER:
(253)835-2700
ONE -CALL UTILITY LOCATOR:
1 (800) 424-5555
OWNER/APPLICANT
STEVE DAVIS
6124 PANORAMA DR NE
TACOMA, WA 98422
(253)606-5586
STEV E DAV ISEXCAVATI NG@GMAI L.COM
ARCHITECT
MIKE BAILY
LDG ARCHITECTS
6525 15TH AVE NW #220
SEATTLE, WA 98117
(206)283-4764
MIKE@LDGARCH ITECTS.COM
CIVIL ENGINEER
KRISTEN ORNDORFF, PE
KWO ENGINEERING, PLLC
4505 91ST AVE SE
MERCER ISLAND, WA 98040
(206)755-3951
KRI STEN @KW OENG.ON M ICROSOFT.COM
SURVEYOR
JAY BABCOCK, PLS
OLYMPIC SURVEYING, LLC
19512 94TH ST E
BONNEY LAKE, WA 98391
(206)396-2022
JAYBABCOCK@COMCAST.NET
LEGEND (EXISTING)
TENANT
JENNIFER WHITMORE
BIGFOOT PROPERTIES XLV, LLC
420 ELLINGSON ROAD, SUITE 200
PACIFIC, WA 98047
(253) 261-3258
J EN N I FER@B I G FOOTJAVA.COM
ENGINEERING GEOLOGIST
KEITH SCHEMBS, LEG
GEO RESOURCES, LLC
5007 PACIFIC HIGHWAY EAST, #16
FIFE, WA 98424
(253)896-1011
KE ITHS@GEORESOU RCES. US
LANDSCAPE ARCHITECT
KENLONEY
MAIN STREET DESIGN
9402 TIDAL COURT
BAINBRIDGE ISLAND, WA 98110
(206)842-7886
MAIN STRE ET@ EA RT H L I N K. N ET
TRAFFIC ENGINEER
MARK JACOBS, PE, PTOE
JAKE TRAFFIC ENGINEERING, INC
2614 39TH AVE SW
SEATTLE, WA 98116
(206)799-5692
JAKETRAFFI C@COMCAST.N ET
- - - -
RIGHT-OF-WAY
- -
PROPERTY BOUNDARY
CENTERLINE
- - - - - - - -
EASEMENT
- -410 - -
EXISTING MAJOR CONTOURS
- - - -408 - - -
EXISTING MINOR CONTOURS
EXISTING CURB
EXISTING CONCRETE
ss
EXISTING SEWER
Os
EXISTING SANITARY SEWER MANHOLE
so
EXISTING STORM
EXISTING STORM MANHOLE
❑
EXISTING CATCH BASIN
03
EXISTING WATER METER
D4
EXISTING WATER VALVE
EXISTING FIRE HYDRANT
oP
EXISTING OVERHEAD POWER
o
EXISTING POWER POLE
ITI
EXISTING ELEC. HAND HOLD
A
EXISTING LIGHT
IT
EXISTING GAS METER
0-
EXISTING TRAFFIC LIGHT
EXISTING SIGN
DISCLAIMER
SURVEY INFORMATION CONTAINED IN THESE PLANS HAS BEEN EXTRACTED FROM THE
ACTUAL SURVEY PERFORMED BY OLYMPIC SURVEYING, LLC. KWO ENGINEERING, PLLC
ASSUMES NO LIABILITY AS TO THE ACCURACY AND COMPLETENESS OF THIS DATA. ANY
DISCREPANCIES FOUND BETWEEN WHAT IS SHOWN ON THE PLANS AND WHAT IS NOTED
IN THE FIELD SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ENGINEER.
PRELIMINARY
NOT FOR CONSTRUCTION
01/2022
VWINITV MAP
SITE ADDRESS PARCEL NUMBER
803 S 348TH ST
FEDERAL WAY, WA 98003
SHEET INDEX
2021049087 (KING COUNTY)
SHEET#
DESCRIPTION
CI
COVER SHEET
C2
TESC & SITE PREP PLAN
C3
CIVIL SITE PLAN
C4
PAVING & STRIPING PLAN
C5
GRADING & STORM DRAINAGE PLAN
C6
WATER & SEWER SERVICES PLAN
C7
DETAILS
C8
DETAILS
C9
DETAILS
C10
DETAILS
C11
DETAILS
C12
DETAILS
LEGAL DESCRIPTION (BY OLYMPIC)
PER CHICAGO INSURANCE TITLE REPORT NO.001233109
THE WEST 100 FEET OF THE NORTH 300 FEET OF THE NORTHWEST QUARTER OF THE
SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 20, TOWNSHIP 21
NORTH, RANGE 4 EAST, WILLIAMETTE MERIDIAN, IN KING COUNTY, WASHINGTON;
EXCEPT THE NORTH 30 FEET THEREOF FOR ROAD; AND EXCEPT THAT PORTION CONVEYED
TO KING COUNTY FOR SOUTH 348TH STREET BY DEED RECORDED UNDER RECORDING
NUMBER 8607250463.
SURVEY NOTES (BY OLYMPIC)
HORIZONTAL DATUM:
WASHINGTON COORDINATE SYSTEM - NORTH ZONE 2601
HOLDING W.S.D.O.T. SURVEY MONUMNET NO. 9522, NORTHING = 109459.745 EASTING =
1274750.436 ELEVATION = 359.569' (ALL IN U.S. SURVEY FEET) .
BASIS OF BEARING:
WASHINGTON COORDINATE SYSTEM, NORTH ZONE, 83191.
REFERENCE BEARING OF S 88°45'01"W BETWEEN FOUND MONUMENTS AT THE
INTERSECTION OF SOUTH 336TH ST. AND 9TH AVE. SOUTH AND THE INTERSECTION OF
SOUTH 336TH ST. AND PACIFIC HIGHWAY.
VERTICAL DATUM: (NAVD 88)
AS -BUILT CERTIFICATION:
I HEREBY DECLARE THAT THE HORIZONTAL AND
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A
FIELD SURVEY PERFORMED BY ME OR UNDER MY
DIRECTION.
NAME L.S.# DATE
PERMIT NO. XX-XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
NOTE:
THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
APPROVAL DATE. THE CITY WILL NOT BE
RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
THESE PLANS.
FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
I PERMIT NO. XX-XXXXXX-XX I
APPROVED
DATE
a
J
a
Li
w
0 ; o
w a �<
LL p
`aLU
i
/
W w
ac
LL
I-
0
0
�LL
MV
W
Z
z J
FH
� Z
LLI O
LLI U
z +
UZ
z
L LJ LI J
V
k v A
o N$
U w"
E Q3
0,
pj n
0 Vf
z
47
M
w l0
ti
N CK
x N
VA
1JHITE OR
X- WAgM��y
C "
Y 11
f SO/STENAL
ENG�
DESIGNED KWO
CHECKED KWO
DRAWN NAS
CHECKED KWO
AS -BUILT
w
OB NO.
LU
21-021
A
V/
DATE
ovzozz
w
DRAWING NAME
C1
O
U
1 OF 12
S.S. MANHOLE
RIM = 225.00'
I.E. = 216.90: (C/L CHANNEL) 12" EAN
I.E. = 216.90(C/L CHANNEL) 8" N/S
\ \
\
N' \
\ 2
N
TYPE I
\\
RIM $
d2Y\
\
50,
/
E. = 22 .43' (,?"CMP
\
AP7ROACH
GRASS,---
CONC. SIDEWALK
Cl1T�
(
C NC. SIDEWA K
GRASS ASPHALT
\ \\ GRASS
— — — — — — — —
\ N 88"39'3'6�W 100.00'
SOUTH 348TH STREET
— —\— —.\...... — —
3 NNE w TYPE 2 C.B.
\ RIM = 230\02'
2 \ 2 E. = 223.5�' (12"CMP W.)
\ I.E. = 223. 2' (30" CMP E.)
\ I.E. = 225.92' (TOP STOVE PIPE)
/CUT
1 L
3
LL aN \
GAT
BEG 2 -/'\ / + 4 5
2 ASPHALT
\ AREA \
� 1
I
1 .
I 1 .
�225- \ GRAVEL 1
I
2 \ 2
GRAVEL \
\ 1 N
\\ I
ECOLOGY BLOCK WALL I
I I
5' CHAIN LINK FENCE 1 I
I N I
I
o I �
N I I I
2021049034 w
'v 1
ECOLOGY BLOCK WALL I
I
z 2 2I
I
I
GRAVEL
/ I
I / N
I I
� I I
N
5' CHAIN LINK FENCE �
3 I �
i
22t' S
GRAVEL
41 N 88- 9'36�1`V—100.00' — —
Know what's below.
Call before you dig.
1 CO C. SIDEWALK
/ \� END
\ I
1 \I
I
i I
ECOLOGY BLOCK WALL
EROSION/SEDIMENTATION CONTROL NOTES
1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT
CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (I.E., SIZE AND
LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES,
UTILITIES, ETC.
2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION MAINTENANCE
REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF
THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS APPROVED.
3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY
FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION
PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE
PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR
FOR THE DURATION OF CONSTRUCTION
4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION
WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE
THAT SEDIMENT LADEN WATER DOES NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE
APPLICABLE WATER STANDARDS.
5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR
ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC
FACILITIES SHALL BY UPGRADED (I.E., ADDITIONAL SUMPS, RELOCATION OF DITCHES
AND SILT FENCES, ETC.) AS NEEDED FOR UNEXPECTED STORM EVENTS.
6. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/CONTRACTOR AND
MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.
7. ANY AREA STRIPPED OF VEGETATION, INCLUDING ROADWAY EMBANKMENTS, WHERE NO
FURTHER WORK IS ANTICIPATED OR A PERIOD OF 2 DAYS (WET SEASON) OR 7 DAYS
(DRY SEASON), SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC METHODS
(I.E. SEEDING, MULCHING, NETTING, EROSION BLANKETS, ETC.)
8. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
ADDRESSED WITHIN 15 DAYS.
9. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A
MINIMUM OF ONCE A MONTH OR WITHIN THE 24 HOURS FOLLOWING A STORM EVENT.
10. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE
WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE
CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
11. STABILIZED CONSTRUCTION ENTRANCES AND WASH PADS SHALL BE INSTALLED AT THE
BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE
KEPT CLEAN FOR THE DURATION OF THE PROJECT.
12. WET SEASON REQUIREMENTS AS DESCRIBED IN APPENDIX D, SECTION D.2.4.2 OF THE
KCSWDM ARE IN EFFECT BEGINNING OCTOBER 1 THROUGH APRIL 30.
13. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLEING
BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND
SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO
FUNCTION ULTIMATELY AS AN INFILTRATION OR DISPERSION SYSTEM, THE FACILITY
SHALL NOT BE USED AS A TEMPORARY SETTLING BASIN. NO UNDERGROUND DETENTION
TANKS OR VAULTS SHALL BE USED AS A TEMPORARY SETTLING BASIN.
14. WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED, FAST
GERMINATING GRASSES SHALL BE APPLIED AT AN APPROPRIATE RATE (I.E. ANNUAL OR
PERENNIAL RYE APPLIED AT APPROXIMATELY 80 POUNDS PER ACRE).
15. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE
APPLIED AT A MINIMUM THICKNESS OF TWO INCHES.
16.MANAGEMENT PRACTICES PROVIDING SIGNIFICANT TREE PROTECTION SHALL BE
PROVIDED PER SECTION 19.120 OF FWRC.
PRELIMINARY
NOT FOR CONSTRUCTION
01/2022
20 10 0 20 40
SCALE IN FEET
PLAN NOTES
1. PRESERVE AND PROTECT ALL IMPROVEMENTS TO REMAIN.
2. REFER TO TIR (STORM REPORT) FOR WRITTEN ESC NARRATIVE.
3. REFER TO THE SOILS REPORT FOR ADDITIONAL INFORMATION.
4. PROVIDE CATCH BASIN INSERTS WITHIN CLEARING LIMITS AND WITHIN 200 FT
DOWNSTREAM OF AREAS OF WORK.
5. CONTRACTOR IS RESPONSIBLE FOR OBTAINING UTILITY AND ROW USE PERMITS.
SITE PREPARATION NOTES
ORELOCATE
EX LIGHT
OREMOVE
EX FENCE
OADJUST
WM TO FG, REMOVE BLOCKS
TESC NOTES
A1
USE EXISTING DRIVEWAY FOR TEMPORARY CONSTRUCTION ENTRANCE. EXPAND AS
NECESSARY PER WSDOT STD PLAN 1-80.10-02. AVOID TRACKING SEDIMENT ONTO
STREETS. USE EXISTING ONSITE DRIVEWAY.
ZL CATCH BASIN PROTECTION PER WSDOT STD PLAN 1-40.20-00.
INSTALL SILT CONTROL FENCE PER WSDOT STD PLAN 1-30.15-02. WATTLES (PER
3 WSDOT STD PLAN I-30.30-01), COIR LOGS (PER WSDOT STD PLAN 1-30.60-00) AND/OR
COMPOST SOCKS (PER WSDOT STD PLAN 1-30.40-01) MAY BE USED IN LIEU OF SILT
CONTROLFENCE.
ZSTAGING AND STOCKPILE AREA, PROTECT WITH PLASTIC COVERING (BMP C123) AS
4 NECESSARY.
PROTECT AND STABILIZE EXPOSED SOILS WITH PLASTIC COVERING (BMP C123) OR
5 EQUAL.
LEGEND
SF
SILT CONTROL FENCE
CATCH BASIN PROTECTION
D
CONSTRUCTION ENTRANCE
AS -BUILT CERTIFICATION:
I HEREBY DECLARE THAT THE HORIZONTAL AND
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A
FIELD SURVEY PERFORMED BY ME OR UNDER MY
DIRECTION.
NAME L.S.# DATE
PERMIT NO. XX-XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
NOTE:
THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
APPROVAL DATE. THE CITY WILL NOT BE
RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
THESE PLANS.
FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
I PERMIT NO. XX-XXXXXX-XX I
APPROVED
DATE
Q
J
a
Li
w
0 ; o
w a 0<
LL
Q
a LU
Q
W w
Q � �
LL
I-
0
LIL
_MV
W
--i_ lLD o Owl U W
0 Q3
Z = 0 F 3
Z U HM
LLI O
W z of
z +
�z Z�
ILJJ Q L
J w ti
N Cfl
V x N
.1JHITE OR
Z
RFl1laTEa��
J @@ZONAL Ea0
a
A DESIGNED KWO
WCHECKED KWO
DRAWN NAS
CHECKED ME
AS -BUILT
a
W JOB NO.
21-021
�A DATE
01/2022
U DRAWING NAME
y C2
W 2 OF 12
45 LF C-CURB ON SOUTH SIDE
OF TWO-WAY CENTER TURN
LANE TO RESTRICT ONSITE
ACCESS TO RIGHT IN/RIGHT
OUT ONLY
50,
"DO NOT BLOCK
DRIVEWAY" SIGN
STRIPING FOR NO
PARKING (TYP)
ADA SIGN
SEE DETAIL THIS SHEET
o
N
2021049034
EX FENCE TO REMAIN
ALONG WEST, SOUTH AND
EAST SIDES
STRIPING FOR LANE LINE
TRASH ENCLOSURE W/ROOF
REFER TO ARCH PLANS
EX ECOLOGY BLOCK
WALL TO REMAIN \ \ " . .
EX ONSITE WETLAND BUFFER \\
958 SF
I \\
N 88°39'3E
I
15
Know what's below.
Call before you dig.
30' WIDE DRIVEWAY
PER COFW STD DWG NO.
3-6A AND DTL 1 ON C5
SOUTH 348TH STREET
(PRINCIPAL ARTERIAL)
LIGHT BOLLARDS (TYR)
REFER TO ARCH PLANS
PEDESTRIAN PLAZA W/
BIKE RACK AND TRASH CAN
REFER TO ARCH PLANS
STRIPING FOR LANE LINE
PROJECT DATA
SITE AREA:
0.57 AC
PARKING:
6 STALLS (5 REGULAR, 1 ADA)
GROSS FLOOR AREA (PER ARCHITECT):
MAIN FLOOR: 450 SF ^ �
I V
SECOND FLOOR (MECH): 203 SF
TOTAL: 653 SF
IBC CONSTRUCTION TYPE (PER ARCHITECT):
M
IBC OCCUPANCY CLASSIFICATION(PER ARCHITECT):
VB - NOT SPRINKLERED
ON -SITE PEDESTRIAN PLAZA AREA:
130 SF
20 10 0 20 40
SCALE IN FEET
BUILDABLE LANDS CALCULATION
GROSS LAND AREA
0.57 AC
CRITICAL AREAS
0.02 AC
RIGHTS -OF -WAY
0 AC
PUBLIC PURPOSE
0 AC
NET LAND AREA
0.55 AC
BUILDING INFO
DESCRIPTION
SO FT (GROSS FLOOR AREA)
# OF UNITS
EXISTING BUILDING(S)
0 SF
0
NEW BUILDING
653 SF
N/A
COMMERCIAL PORTION
653 SF
N/A
RESIDENTIAL PORTION
0 SF
0
FOOTPRINT
0.55 AC
N/A
50,
DRIVE THRU SIGN BOARD
(TYP OF 2)
28.2' 6' 8'
REFER TO ARCH PLANS
EX ROADWAY PLANTE SIDEWALK 7.8'
ROW
ROW
APPROX LOCATION
24
OF SITE PHOTOS
EX HMA
SITE LIGHTING
--�
--¢+
H PLANS
REFER TO ARCH PLANS
` C-CURB PER PLAN CEMENT7ONC
CURB AND GUTTER
CROSS SECTION TYPE E
NOTES: REFER TO COFW STD DWG NO.
3-3, 3-4 AND 3-4A FOR ADDITIONAL INFO
�1 TYP SECTION - SOUTH 348TH STREET
NTS
PRELIMINARY
NOT FOR CONSTRUCTION
01/2022
2
4'MIN
ADA SIGN DETAIL
NTS
AS -BUILT CERTIFICATION:
I HEREBY DECLARE THAT THE HORIZONTAL AND
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A
FIELD SURVEY PERFORMED BY ME OR UNDER MY
DIRECTION.
NAME L.S.# DATE
PERMIT NO. XX-XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
RESERVED PARKING
HANDICAP SIGN
R7-801
R7-8A
2" DIA G.I.P.
SCH 40
EMBED SIGN POST IN
B" DIA CONIC FOOTING
NOTE:
THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
APPROVAL DATE. THE CITY WILL NOT BE
RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
THESE PLANS.
FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
PERMIT NO. XX-XXXXXX-XX
APPROVED
DATE
r
Q
J
Q
LLI
0 LD
UU Q w¢
LL p �
Q
�w
^Q cn
I LL
O
O
LL
0
W
rIHI7E
wash �l�
e
Yq
71
2L
p0 F 482t9
FSS CNAL E��r
DESIGNED KWO
CHECKED KWO
DRAWN NAS
Z CHECKED KWO
QAS -BUILT
J JOB NO
^.
A 21-021
W DATE
F_ o1/zoz2
En
J ING NAME DRAW
C3
UC 3 OF 12
C-CURB ON SOUTH SIDE OF
2-WAY CENTER TURN LANE TO
RESTRICT ONSITE ACCESS TO
RIGHT IN/RIGHT OUT ONLY
BEG
50,
2021049034
ju
Know what's below.
Call before you dig.
30' WIDE DRIVEWAY
SEE DTL C5
SOUTH 348TH STREET
6" MIN PCC
4" MIN CSBC (WSDOT STD SPEC 9-03.9(3))
COMPACTED SUBGRADE
NOTES:
1. DEPTHS SHOWN ARE MIN COMPACTED DEPTHS.
2. PAVEMENT WEARING COURSE AND BASE COURSE SECTION DEPTHS AND
SPECIFICATIONS SHALL BE APPROVED BY THE GEOTECH.
3. CEMENT CONCRETE PAVEMENT JOINTS AND HMA TRANSITION PER
WSDOT STD PLAN A-40.10-03 AND A-40.15-00.
TYPICAL CONCRETE
PAVEMENT SECTION
SCALE:NTS
3" MIN HMA CLASS 1/2 IN PG 64-22 CONIC
WEARING COURSE (WSDOT STD SPEC
5-04.0)
6" MIN CSBC (WSDOT STD SPEC 9-03.9(3))
0 0 0
COMPACTED SUBGRADE
TYP
doe NOTES:
�O 1. DEPTHS SHOWN ARE MIN COMPACTED DEPTHS.
2. PAVEMENT WEARING COURSE AND BASE COURSE SECTION DEPTHS AND
QpQ- SPECIFICATIONS SHALL BE APPROVED BY THE GEOTECH.
TYPICAL ASPHALT
�2� PAVEMENT SECTION
SCALE:NTS
PRELIMINARY
NOT FOR CONSTRUCTION
01/2022
20 10 0 20 40
SCALE IN FEET
PLAN NOTES
I. LANDSCAPE AREAS SHALL HAVE COMPOST -AMENDED TOPSOIL PER WASHINGTON STATE
DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN
WASHINGTON BMPT5.30. REFER TO LANDSCAPE PLAN AND Cl2 FOR NOTES.
SCARIFICATION OF SOILS IN EX PAVEMENT AREAS BEING CONVERTED TO LANDSCAPE
AREAS SHALL BE TO 6' BELOW BOTTOM OF BASE COURSE OR TO DEPTH REQUIRED BY
ECOLOGY BMPT5.30, WHICHEVER IS GREATER.
2. REFER TO C7-Cl2 FOR DETAILS.
PAVING NOTES
�1 C-CURB PER COFW STD DWG NO. 3-4
�2 CEMENT CONIC BARRIER CURB PER COFW STD DWG NO. 3-4
�3 CONC SIDEWALK PER COFW STD DWG NO. 3-3.
® CEMENT CONCRETE EXTRUDED CURB (PRIVATE) PER COFW STD DWG NO. 3-4A
STRIPING NOTES
ACCESSIBLE PARKING SPACE SYMBOL (STANDARD) PAINTED WHITE WITH BLUE
BACKGROUND PER WSDOT STD PLAN M-24.60-04
4" WIDE WHITE PAINT LINES AT 2 FT APART AND 45 DEG ANGLE TO ADJACENT 4" WIDE
WHITE PAINT EDGE LINES PER WSDOT STD PLAN M-17.10-02
QWHITE PAINT TRAFFIC ARROW
4� 4" WIDE WHITE PAINT LANE LINE
LEGEND(PROPOSED
F771 ASPHALT PAVEMENT
CONCRETE
CONCRETE DRIVEWAY
LANDSCAPE
CURB
AS -BUILT CERTIFICATION:
I HEREBY DECLARE THAT THE HORIZONTAL AND
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A
FIELD SURVEY PERFORMED BY ME OR UNDER MY
DIRECTION.
NAME L.S.# DATE
PERMIT NO. XX-XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
NOTE:
THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
APPROVAL DATE. THE CITY WILL NOT BE
RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
THESE PLANS.
FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
I PERMIT NO. XX-XXXXXX-XX I
APPROVED
DATE
ID O OW
C� Qwq
0 Q3
z 0
Z o fJ H W
LLI O
W z of
z +
Z Z
`J C.9
z M
(L,
W c
_J wti
V x CV
.1JHITE OR
WAgM2�y�
��?�dF
Z
x
°C•Rffl1�8TEa�O
li
L Ea6
ZDESIGNED
KWO
CHECKED KWO
a.
DRAWN NAS
CHECKED KWO
AS -BUILT
JOB NO.
U)
21-021
0 6
DATE
0
D,/2022
Z
DRAWING NAME
j
C4
/p
4 OF 12
- - - - e
T\\
50, 22Y\ \
CB6 (TYPE 1)
W/STD GRATE
RIM=225.00
IE=222.00
63 LF 8" CPEP @ S=0.51 %
2021049034
63 LF 8' CPEP @ S=0.65%
CB4 (TYPE 1)
W/ STD GRATE
RIM=225.85
IE=221.50
EX 40 LF LEVEL SPREADER OUTFALL
(FIELD VERIFY)
EX CB (TYPE 1)
EX RIM=216,58
EX IE=214.66
(FIELD VERIFY)
EX LF 12" SO
(FIELD VERIFY)
38 LF 12" CPEP @ S=3.63%
CONNECT TO EX PIPE AS REQ'D
IE=214.82 (FIELD VERIFY)
CB1 (TYPE 2 - 54" DIA)
CONTROL STRUCTURE
W/ SOLID ROUND COVER
RIM=226.68
IE=216.20 (24" E)
IE=216.20 (12" W)
SEE DETAILS
Know what's below.
Call before you dig.
SOUTH 348TH STREET
3 N's w C.B.
TYPE
\ RIM = 230,02'
\ \ LE. = 223.9�2' (12"CMP W.)
\ I.E. = 223. 2' (30" CMP E.)
\ \ I.E. = 225. 2' (TOP STOVE PIPE)
-2 ___� \ -,
CB5 (TYPE 1)
W/ STD GRATE
RIM=225.71
IE=221.68
117 LF 8' CPEP @ S=0.50%
CB3 (TYPE 1)
W/ STD GRATE
RIM=225.96
IE=221.09
6 LF 8" CPEP @ S=1.00 %
20 10 0 20 40
SCALE IN FEET
BIOPOD BIOFILTER SYSTEM
4 FT BY 6 FT VAULT W/ INTERNAL BYPASS
RIM=226.17
IE IN=221.03
IE OUT=220.23
SEE DETAIL C12
10 LF 8" CPEP @ S=6.30 %
CB2 (TYPE 2 - 48" DIA)
W/ SOLID LOCKING ROUND COVER
RIM=226.27
IE=216.20 (24" W)
IE=219.60 (8" N)
IE=216.20
5 LF 24" CMP STUB @ S=O%
36" ACCESS RISER (TYP OF 3)
185 LF - 8 FT DIA CMP DETENTION SYSTEM
TOP OF TANK=223.70
BOTTOM OF TANK=215.70
SEE DETAILS C11-C12
LEGEND(PROPOSED
OCATCH
BASIN TYPE 2
CATCH BASIN TYPE 1
• SDCO
STORM DRAIN CLEANOUT
SD
STORM DRAIN PIPE (SDP)
DP
DRAIN PIPE
TC
TOP OF CURB
BC
BOTTOM OF CURB
ME
MATCH EXISTING
•98.00
FINISH GRADE SPOT EL
DIRECTION OF FLOW
- - - -
RIDGE LINE
5' 8' 15' 15' 8' 14'
ry,�Gry9,�G
y. ryy.
d eG\ G\ry 0G OG�G C'�G G G�G
?yI9 ts�9ts ^�k, ts� ��0 �0 �0
? p!` p0 y^ ypp y^y y°A� rye
l
t0.
y
.ry
'Lyy:ryy�
PLAN NOTES
1. REFER TO C1 FOR GENERAL STORM NOTES. REFER TO C7-C12 FOR DETAILS.
2. SPOT ELEVATIONS ARE AT FINISHED SURFACE (FS) / BOTTOM OF CURB, UNLESS
OTHERWISE SPECIFICALLY NOTED. ALL CURBS ARE 6" HIGH, UNLESS OTHERWISE
SPECIFICALLY NOTED.
3. SLOPES TO CATCH SHALL NOT EXCEED 3:1 WHERE POSSIBLE (2:1 MAX).
4. LIMIT SLOPES TO 2 % MAX (1.5 % IS PREFERABLE) AT ADA STALLS AND PEDESTRIAN
ACCESS AREAS AS SHOWN IN PLAN.
5. CATCH BASIN TYPE 1 PER COFW STD DWG NO. 4-1. RECTANGULAR FRAME PER COFW
STD DWG NO. 4-6.
6. RECTANGULAR HERRINGBONE GRATE PER COFW STD DWG NO. 4-5. ALL STORM DRAIN
COVERS AND GRATES SHALL BE LOCKING.
7. DRAIN PIPE (DP) SHALL BE AT 1 % MIN SLOPE AND THE FOLLOWING PIPE MATERIALS AND
CORRESPONDING MIN COVER: 18" FOR SOLID WALL PVC (SDR-21), 3 FT FOR SOLID WALL
PVC (SDR-35), AND 6 IN FOR DUCTILE IRON (CL 52) STORM PIPE.
8. PIPE ZONE BEDDING AND BACKFILL PER WSDOT STD PLAN NO. B-55.20-03
9. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS OF
DOWNSPOUTS. ROOF DRAINS SHALL MAINTAIN 1 % MIN SLOPE.
10. POSITIVE DRAINAGE SHALL BE PROVIDED IN LANDSCAPED AREAS.
11. FOOTING DRAIN SHALL BE 4" MIN RIGID PERF PVC DRAIN PIPE WRAPPED IN DRAINAGE
FABRIC AND SURROUNDED BY DRAIN ROCK. DAYLIGHT OR TIGHTLINE FOOTING DRAINS
TO DOWNSTREAM STORM SYSTEM AS REQ'D.
AG
G\e*
..e
W
W
y
rye,
IW W W W W ✓/ W�
1 FRONTAGE ROAD GRADING DETAIL
SCALE: 1" = 10'
SURFACE SEAL
(SEE NOTE 1)
�12"MIN. --I MIN DIAM PERF
RIGID DRAIN PIPE
WRAPPED IN DRAINAGE
FABRIC; TIE TO
DOWNSTREAM STORM
,_� ,_ SYSTEM
\--1" DRAIN ROCK
NOTES:
I. SURFACE SEAL TO CONSIST OF 6" TO 12' OF NATIVE SOIL OR OTHER LOW PERMEABILITY
MATERIAL. SLOPE AWAY FROM BUILDING.
2. DRAIN PIPE: PERFORATED OR SLOTTED RIGID PVC PIPE LAID WITH PERFORATIONS OR SLOTS
FACING DOWN; TIGHT JOINTED; WITH A POSITIVE GRADIENT, 0.5% MIN. DO NOT USE FLEXIBLE
CORRUGATED PLASTIC PIPE. DO NOT TIE BUILDING DOWNSPOUT DRAINS INTO FOOTING LINES.
WRAP WITH MIRAFI 140 FILTER FABRIC OR EQUAL.
�_21 TYPICAL FOOTING DRAIN
NTS
DATUM
PRELIMINARY
NOT FOR CONSTRUCTION
NA11188 01 /2022
AS -BUILT CERTIFICATION:
I HEREBY DECLARE THAT THE HORIZONTAL AND
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A
FIELD SURVEY PERFORMED BY ME OR UNDER MY
DIRECTION.
NAME L.S.# DATE
PERMIT NO. XX-XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
10 5
0
10 20
SCALE IN FEET
IMPERVIOUS SURFACES
TOTAL EXISTING: ALL TBR
TOTAL PROPOSED: 18,285 SF
EARTHWORK QUANTITIES
A. CUT = 980 CY
B. FILL=1,100CY
C. NET IMPORT/EXPORT (B-A) = 120 CY
D. TOTAL EARTHWORK (A-B) = 2,080 CY
NOTE:
THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
APPROVAL DATE. THE CITY WILL NOT BE
RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
THESE PLANS.
FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
PERMIT NO. XX-XXXXXX-XX
APPROVED
DATE
0 Q3
Z
N ~9
L-1 Z
W
J 1�
W_
U N
zvf
L7Z
C 7
zLn
47
Z N
; M
W
0
OJ
S
z
wti
N CO
U
x N
LIZA
a
LU
a
'W
V
pI01TE O
wasM�Ry
Z
w�
ry
���
Qayou
R 4ez1a �
C'y@�1ISTE. a61�
Cn
ONAL E
COI_
U)
JOB N0.
Ca
21-021
r ^
DATE
Z
01/2022
Q
DRAWING NAME
C5
f 1�
5 OF 12
3
CONNECT TO EX SIDE SEWER
S.S. MANHOLE
I
SSCP 24625 (FIELD VERIFY
RIM = 225.05.0 0'
DEPTH AND LOCATION PRIOR
I.E. = 21 (C/L CHANNEL) 12" ENV
TO CONSTRUCTION)
I.E. = 216.90' (C/L CHANNEL) 8" N/S
3
—
\
N>
\ N
22Y\
\
\\
50,
\\
3v 6
FIRE HYDRANT PER LUD
STANDARDS
SIDE SEWER
6" PVC SDR 35 @ S=2.0'
1,000 GAL GREASE INTERCE
RIM=ADJUST
IE IN=
IE OUT -
SEE DETAIL THIS
6
Know what's below.
Call before you dig.
SSCO
IE=223.30
TRASH DRAIN W/
DOWNTURNED ELBOW
TRASH ENCLOSURE W/ROOF
REFER TO ARCH PLANS
vvvN
I
QP
�
518" BY 314" IRRIGATION METER AND DCVA
PER LUD STANDARDS
REUSE EX 518" BY 3/4" DOMESTIC METER
(WTR SVC 1002)
INSTALL DCVA PER LUD STANDARDS
SOUTH
348TH STREET
3 NNS w \
/ � b
e
�I
20 10 0 20 40
SCALEIN FEET
LAKEHAVEN GENERAL NOTES
1. PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO
PRE -CONSTRUCTION MEETING.
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE FEDERAL WAY REVISED CODE
(FWRC), APPLICABLE ORDINANCES, AND THE CITY COUNCIL CONDITIONS OF PROJECT
APPROVAL. THESE DOCUMENTS ARE SUPPLEMENTED BY THE MOST RECENT VERSION
OF THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL
CONSTRUCTION (WSDOT/APWA), THE KING COUNTY ROAD STANDARDS (KCRS), AD THE
KING COUNTY SURFACE WATER DESIGN MANUAL (KCSWDM). IT SHALL BE THE SOLE
RESPONSIBILITY OF THE APPLICANT AND THE PROFESSIONAL ENGINEER TO CORRECT
ANY ERROR, OMISSION, OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN
THESE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST OR LIABILITY TO
THE CITY OF FEDERAL WAY.
3. THE DESIGN ELEMENTS WITHIN THESE PLANS HAVE BEEN REVIEWED ACCORDING TO
FEDERAL WAY ENGINEERING REVIEW CHECKLIST. SOME ELEMENTS MAY HAVE BEEN
OVERLOOKED OR MISSED BY THE CITY ENGINEERING PLAN REVIEWER. ANY VARIANCE
FROM ADOPTED STANDARDS IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY
THE CITY OF FEDERAL WAY, PRIOR TO CONSTRUCTION.
4. APPROVAL OF THIS ROAD, GRADING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AN
APPROVAL OF ANY OTHER CONSTRUCTION (I.E. DOMESTIC WATER CONVEYANCE,
SEWER CONVEYANCE, GAS, ELECTRICITY, ETC).
�i 5. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION
MEETING MUST BE HELD BETWEEN THE CITY OF FEDERAL WAY, THE APPLICANT, AND
THE APPLICANTS CONSTRUCTION REPRESENTATIVE.
QV� 6. A SIGNED COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PRORESS.
7. ON -SITE CONSTRUCTION NOISE SHALL BE LIMITED AS PER FWRC (SECTION 19.105.040);
NORMALLY THIS IS 7:00 A.M. TO 8:00 P.M., MONDAY THROUGH FRIDAY, AND 9:00 A.M. TO
8:00 P.M. ON SATURDAYS.
8. RIGHT-OF-WAY CONSTRUCTION IS ALLOWED 8:30 A.M. TO 3:00 P.M. MONDAY THROUGH
FRIDAY. WRITTEN AUTHORIZATION TO WORK OUTSIDE OF THESE HOURS MUST BE
GRANTED BY THE PUBLIC WORKS DIRECTOR.
9. IT SHALL BE THE APPLICANTS /CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL
CONSTRUCTION EASEMENTS NECESSARY BEFORE INITIATING OFF -SITE WORK WITHIN
THE ROAD RIGHT-OF-WAY.
10. FRANCHISED UTILITIES OF OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE
APPROVED PLANS SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS
THAT MEET ALL CITY REQUIREMENTS AND THE REQUIREMENTS OF KCRS CHAPTER 8
ARE SUBMITTED TO THE CITY OF FEDERAL WAY AT LEAST THREE DAYS PRIOR TO
CONSTRUCTION.
11. VERTICAL DATUM SHALL BE KCAS OR NCVD-29.
12. GROUNDWATER SYSTEM CONSTRUCTION SHALL BE WITHIN A RIGHT OF WAY OR
APPROPRIATE DRAINAGE EASEMENTS, BUT NOT UNDERNEATH THE ROADWAY SECTION.
ALL GROUNDWATER SYSTEMS MUST BE CONSTRUCTED IN ACCORDANCE WITH THE
WSDOT/APWA STANDARD SPECIFICATIONS.
13. ALL UTILITY TRENCHES IN THE RIGHT-OF-WAY SHALL BE BACKFILLED 5/8" CRUSHED
ROCK AND COMPACTED TO 95% DENSITY. WHEN TRENCH WIDTH IS 18 INCHES OR LESS,
AND IS WITHIN THE TRAVELED WAY, TRENCH WILL BE BACKFILLED WITH CONTROL
DENSITY FILL (SELF -COMPACTED FLOWABLE FILL) AS DEFINED BY WSDOT 2-09.3(1)e. THE
AGGREGATE WILL BE 3/8" MINUS.
14. ALL ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95 % DENSITY IN
ACCORDANCE WITH WSDOT 2-06.3.
15.OPEN CUTTING OF EXISTING ROADWAYS IS NOTALLOWED UNLESS SPECIFIALLY
APPROVED BY THE PUBLIC WORKS DIRECTOR AND NOTED ON THESE APPROVED PLANS.
ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH KCRS 8.03(B)3.
LEGEND(PROPOSED
• SSCO SEWER CLEANOUT
_SS NSEWER PIPE
W WATER PIPE DATUM
■ WATER METER
Ip RPBA
p DCVA
NAVD88
STRATA GREASE INTERCEPTOR - 1000
a. 6- 4T
8"0 Sump
(3 Places)
Casting Not Shown
This View
2" vent
Tarm—A—Duct in Top
(1 Each Entl)
p
(3)— No. 30 x 4 Castings Nook Lift
Anchor
(edt—Down and Gasketetl) (4 Places
in Top & Base)
30" Mo. Clear Access
PLAN VIEW
0
OUTLET U
0
30" Grade Rings Available
exible 9001
neclor
E INLET
Boot
Recommended 12" Maximum
( )
Co
for 4" & 6" Pipe
Conexible
eclor
Risers Available
I., 4" & 6" Pipe
outResin Sealant
I
�• I 1 I
t
-------------
0 0
<N
.ry
outlet Bay
--{5.1— 7'-63" 1 2'-2f" ----15"1r
SIDE VIEW
— Designed in ocrordance with IAPMO/ANSI Z1001, Manufactured per ASTM C1613
— Loading per ASTM C890 for AASHTO HS20-44 vehicle loading and maximum soil cover of 5-0"
— Maximum allowable DFUs (Drainage Fixture Units) = 35 (e9ulvalent to 1,000 gallon size)
— Corrosion resistant coating line avoiloble to extend the life of the lank.
Manufacturer's re endations: r
Fill Ift anchor pockets with grout
Vent Iota each end to open atmosphere
— Prior to "Start Up" of System, fill wth clean water through let boy to bottom of Bow channel (approx one foot deep).
— Follow Regular Inspection, Cleaning, & Maintenance Schedule (See Clean Out & Mantenance Instructions).
GREASE INTERCEPTOR STRATA
0Oldcastle Precast FiIaName:020-STRATAI-1000 GREASE INTERCEPTOR
PO Box 323, Wilsonville, Oregon 97070-0323 Issue Date: 2016 GGI-1000 GALLON
Tel: (503) 682-2844 Fax: (503) 682-2657 oldoestlepreoast.eomlvAlsonville
19.1
PRELIMINARY
NOT FOR CONSTRUCTION
01/2022
GRAVITY GREASE INTERCEPTOR (GGI) SIZING:
TYPE OF FIXTURE # OF FIXTURES # OF DFUs TOTAL DFUs
3 COMPARTMENT SINK 1 9 9
MOP SINK 1 3 3
FLOOR DRAIN 6 2 12
TOTAL: 24 DFUs
SELECT 1,000 GAL MIN GGI (MAX DFUs 35)
I GREASE INTERCEPTOR DETAIL
SCALE:NTS
AS -BUILT CERTIFICATION:
I HEREBY DECLARE THAT THE HORIZONTAL AND
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A
FIELD SURVEY PERFORMED BY ME OR UNDER MY
DIRECTION.
NAME L.S.# DATE
PERMIT NO. XX-XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
NOTE:
THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
APPROVAL DATE. THE CITY WILL NOT BE
RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
THESE PLANS.
FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
PERMIT NO. XX-XXXXXX-XX
APPROVED
DATE
a
a
W
j3 >
W a NQ
LL Q
a w
I.l.l � W
aCO)
LL
I-
O
O
LL
02 m o'
0 Q3
Z 2 �W
W O
W_ L..) of
`7 Z z
C 7 47
Z � ; M S
W WD z
N CO
U x N
k V A VA
Z
J
a
'/ ^,pI01TE O
U) t4l�eoe WABN/R'L
W
_U N
Y 11
ISTEiI��
ii W�/3@TONAL
U) Eati
DESIGNED KWO
WCHECKED KWO
DRAWN NAS
W CHECKED KWO
AS -BUILT
W JOB NO.
V/ 21-021
DATE
01/2022
W DRAWING NAME
Q C6
s of 1z
NOTES:
1. AN EXPANSION JOINT CONSISTING OF 3/8- PRE -MOLDED JOINT
MATERIAL SHALL BE PLACED FULL DEPTH MOUND HYDRANTS, POLES,
POSES, AND URNLY CASTINGS. SEE DETAIL AT RIGHT.
2. M EXPANSION JOINT CONSISTING OF 3/8' PRE -MOLDED JOINT
MATERIAL SHALL BE PLACED IN ME UPPER 2 INCHES OF CURBS AND
SIDEWALKS AT W FOOT INTERAuS AND AT SIDES OF DRAINAGE
INLETS. (JOINT MATERIAL OF 2%' DEPTH NAY BE USED IN UEU OF 2-
DEPTH).
3. EXPANSION JOINTS IN SIDEWAK SHALL BE LOCATED SO M TO
MATCH THE JOINTS IN THE CURB AND GUTTER. WHEMER THE
SIOEMNX IB AOACENT TO THE CURB OR SEPARATED BY A PLANTER
STRIP.
4. TOOL MARKS, CONSISTING OF 1/4-INCH 'V-GROOVES SHAL BE
E%PE IN THE I— AT 5 FOOT I—. INTERMEDIATE TO ME
5. AN EXPANSION JOINT CONSISTING OF 3/8' PRE -MOLDED JOINT
MATERIEL SHALL BE PLACED NLL-DEPTH BETMEEN THE CURB AND
A MACENT SIDEWALK.
6. EXPANSION JOINT MATERIAL SHALL CONFORM TO ME REQUIREMENTS
OF ASTM D1751 (NSHTO M 213).
). MONOLTIHIC POURS OF CURB MD SIDEWAUK ME hill ALLOWED.B B. ALL UFUIY MPURTENNICES WIMIN ME SIDEWALK SHALL HAVE
AG-COMPUANf NON-SUD LADS.
BROOMED FINISH (TYP.)
TROWWELECOMPERMMIk (TYP)
-- EXPANSION JOINT
SEE NOTES AT LEFT
......................... 1/4' OEPIX V GROOVE
O MAX. 5' C-C
r
J` NLL-DEION PM EXPANS
: ��9q niK;••. JOINT, ONE FOOT
.. a MOUND VALVES,
PoL6. ETC.
SEERSESEE.Y i5 L5 D
E%PM510x JOINT
2 CST SEj[C --
SIDEWALK
EXPANB ION
SIOEWPL(BOTH TOJAcu
C PCB
SEE NOTE 3.
FINISH (TYP.)
DE. SMOOTH
:LED PERIMETER (TYP)
CONCRETE CURB AND GUTTER
SEE CRY SEANCMD
`DETAIL DWG. 3-4
)
ULL-DEPM EXPANSION J01
- 1/4' 'V'-GROOVE
JOINT IN BOTH
SIDEWALK
3
I LP1IµlELLR S TRIP
zRinl
PUBLIC SIDEWALK AND CURB JOINTS DWG. NO.
�(O v WORKS AND SIDEWALK FINISH 3-3
PUBLIC I COMMERCIAL, INDUSTRIAL, AND MULTI -FAMILY DWG. NO.
uVT.sD (SYI UU WORKS I DRIVEWAY APPROACH 3-6A
a.
Know whBPs bCIOYIL Call before you dig
I 'AIR
, • R yllk
KTn)
I
-L-R-L-S'
S¢iWx FlEM1KK11%'
NPE 'C' BLOCK TRAFFIC CURB
• TSLOPENCR0.02 R/R.
MOUNTABLE CEMENT CONCRETE CURBCE�EM CONCR�CURBs
• E, JaM 2. E
GDEWUK CRET
TOP COURREE (CBTC)IxG
oF UP AT
NEW CEMENT CONCRETE CURB &GUTTER
s 1/ • R - 1/2'
C
1�
CEMENT CONCRETE BARRIER CURB
�muXMIT� vWORKS CURB DETAILS D 3-4 G
SEAL JOINT PAVEMENT RESTORATION MINIMUM 3' HIM CL }'
LIMITS, V BACK FROM
PG 64-22 (COMPACTED DEPTH)
EXISTING ACP
EDGE OF TRENCH
OR MATCH EXISTING
(3- MIN. WIDTH)
WHICHEVER IS GREATER
_
........
� EXISTING BASE
NATIVE SUBBASE
1' 1'
ACP TRENCH
RESTORATION
�CKflLL
FOR TR NCH
SEAL JOINT
PAVEMENT RESTORATION
OMITS, V BACK FROM
MATCH EXISTING DEPTH
PCCP PAVEMENT IS TO
EDGE OF TRENCH EXCEPT
BE CONSTRUCTED PER
EXISTING ACP
IF WITH 3' OF JOINT THEN
WSDOT STANDARD 5-05
USE 1' EPDXY COATED
REPLACE TO JOINT
15 MIN.
SMOOTH DOWEL BAR
3' MIN. WIDTH
I
"
.25' MIN.
. EXISTING BASE
0.5' BAR
NATIVE SUBBASE
LENGTH
PCCP TRENCH
RESTORATION
5/8' MINUS BACKflLL
FOR TRENCHI,2
MATCH EXISTING ACP
PAVEMENT RESTORATION
COMPACTED DEPTH
SEAL JOINT
UNITS, V BACK FROM
WITH HMA XJ', PG 64,-22
EXISTING ACP
EDGE OF TRENCH EXCEPT
IF WITH 3' OF JOINT THEN
MATCH EXISTING DEPTH
PCCP PAVEMENT I$ TO
USE 1' EPDXY COATED
REPLACE TO JOINT
3' MIN. WIDTH
BE CONSTRUCTED PER
WSDOT STANDARD 5-05
15' MIN.
SMOOTH DOWEL BAR
.25' MIN.-:=...::.
EXISTING BASE
1' 1'
0.5' BAR
NATIVE SUBBASE
LENGTH
5/8' MINUS BACKFILL
ACP OVER PCCP
FOR TRENCH12
TRENCH RESTORATION
NOTES:
1) FOR TRENCHES LESS THAN 18' WIDE, USE 100% CDF FOR TRENCH
BACKFILL.
2) FOR TRENCHES GREATER
THAN 18" WIDE, ALL BACKFILL IN RIGHT-OF-WAY SHALL
BE MIN. %- CSTC.
�M
WORMS TRENCH RESTORATION 03 28
JI•---IY ux.�
A
�OSInc� CATCH Ixvnxo)..X. carc
CEMENT CON R
NOTES:
1. EXISTING CURB REPLACEMENT WILL REQUIRE REMOVAL
OF ASPHALT A MINIMUM OF 12" FROM FACE OF GUTTER.
MOXW: MO M R=U
EXTRUDED ASPHALT OR CEMENT CONCRETE CURB
IN PRIVATE PARKING AREAS ONLY
1
NNT MWROVED FOR USE
USE IN AL-
EXTRUDED CEMENT CONCRETE CURB
FOR USE IN PUBUC RIGHT OF WAY
PUBLIC CURB AND GUTTER REPLACEMENT DWG. NO.
�0w. WORKS AND EXTRUDED CURB 3-4A
oODoEµ1 TI
ti � \ a RWm SECIMx
I
1 N Bw xoaP
6�
s N ILw xmle �'
/\ jam` \ �•^
N Bn ucx CDraEN
I r 1
N RA vIH s0E I I .21 =
I
I �I
X1
' N e•R E.rH vuv
TES:
1. CATCH BASINS SHALE ))BE CONSMUC1ED
IIN ACCIXiDMCE
SH
PIANS(OR NOTED NBfi1E CNSDOT/MWASSTANDARD SPEC
2. AS AN ACCEPTABLE ALTERNATIVE TO RE6M. WELDED WTI
FABRIC HAMNG A MIN, M OF 0.12 SOWRE INCHES
PER FOOT MAY BE USED. WELDED YME FABRIC SHALL
COMRY TO P51M M9T OHOHIO�MO 21). RE FMNC
HALL NOT BE IUGEC KN .
3. ALL RDNFORCED GST-IN-PUCE CONCRETE SHAL BE
CLASS 4000.
4 KNOGX UTSS KNOCKOUTS FURNISHED XAWVE A WPC THICICKNES I
OF 2' MIN. ALL WE SHAL BE INSTALLED IN -
GET KNOCKOUTS. UNUSED KNOCKOUTS NEED NO
F MALE. IS _EFT INTACT.
5. KNOCKOUT OR CUTOUT HOLE SIZE IS EOIIAL TO PIPE 0
DMJ. OF 20'. KNOCKOUTS MAY BE EITHER ROUND OR 'D' SHAPE.
T. ME MAX. DEPTH FROM ME FINISHED GRADE TO ME
PIPE INVERT IS V-0'.
B. ME TAPER ON ME SIDES OF ME PRECAST BASE SECTION
D RISER SECTION SNALL NOT EXCEED 1/2'/R.
B. GTCH BASIN FRAME AND GRATE SHPLL BE IN ACCORDANCE
WITH STANDARD SPECIFICATIONS AND MEET ME STRENGM
WTNIREMENTS OF FEDERAL BPECIRCATWN RR-F-621D.
NON-GROCOU NO � WR1I�ANYE COI ER POSIIEDTO N ASSURE
10. FRAME AND CRATE MAY BE INSTALLED WIM FLANGE DOWN
OR CAST INTO RISER.
11. EDGE OF RISER OR BRICK SHALL HOT BE MORE THAN 2' FROM
VERTIGL EDGE OF CATCH BASIN WA11.
�GO Uj� WORKS CATCH BASIN TYPE 1 Dw4c1No.
PRELIMINARY
NOT FOR CONSTRUCTION
01/2022
AS -BUILT CERTIFICATION:
I HEREBY DECLARE THAT THE HORIZONTAL AND
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A
FIELD SURVEY PERFORMED BY ME OR UNDER MY
DIRECTION.
NAME L.S.# DATE
PERMIT NO. XX-XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
NOTE:
THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
APPROVAL DATE. THE CITY WILL NOT BE
RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
THESE PLANS.
FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
I PERMIT NO. XX-XXXXXX-XX I
APPROVED
DATE
� lJ
z
DC z
LLJ O
L.LJ �!
z +
� z
z "
LLi W
O
i
L v A
0v�
U Wa
a LL o
0 W
K a-
U oAN
f �
zLu
0 th
Y Lei
W 1�
N Cfl
x N
VA
UNITE O
y!�� OF WAgMA�iL�
IST
� TJA
Y 11
�SSA�(kMAL ENOI'
DESIGNED KWO
CHECKED KWO
DRAWN NAS
CHECKED KWO
AS -BUILT
JOB NO.
21-N21
�/
DATE
U) 01/2022
J
Q DRAWINGNAME
C%
LU
Q C 1 OF 12
NOTES:
1. a BASINS S BE CONSTRUCTED IN ACCORDANCE W AIM
C478 (VHT0 M199) MD ASM MO UNLESS OTHERWISE SHOWN ON
PUNS OR NOTED IN THE WSWT/M•NA STANOMD SPECIFl.T-I.
6' MIN. CUENZANCE, SEE
N0. 2 �I�
OOB. CAWIN OF ONE�DHO FINDS
O NM�E 1%0SfBICI LOUR E 1 SEE
4. PREP �54 alb FURNISHHEE� CCU OR
sm KxocKouTs IeED NOT BE c9ourm IEss OF z
ALL IS KNOCI-TST9' UNLESSS OTHPES ERwBIESE AAPPRD'ED BY THE
5. ExG� NO NOIE 912E 9MLL EOI u PIPE DOTER
DLW K_S CATG°�i B�0.5M WALL TNCNNESS. E
.- F9HALL "B e' BTCH BAST FOR F.BR
a SBµCDNBW
B' =I MCE = 9SVID.OS oTE�K.0 R.S. A�xD NM .E MEN-
REOUIREMUENrs OF FDERAL NFINISHED DTTO SE TM "N10 BODKKIITNG
MR
OF GDODD PSI AND BE PIACED
8 MI THE I BEAR VAWEx9HALL 0q 3,SOD PWN09 PER
SOUARE —
9. FOR DETM N SH-NO W R, STEPS, HANDRNLS AND TOP S1AN9.
SEE D 0. - .
10 COTAFY/E STPNMAD SPECIFIC- SEC.
T-05.3 TOR JOINTOUIREMENI9.
TNN MR. IAW. axLa
, ^^F nw PUBLIC DWG. NO.
� WORKS CATCH BASIN TYPE 2 (48", 54", 60",72", & 96") 4-3
pop%
MATH ume xpF BOLT -GOWN DETAIL
I/a Jb
COVER SKID DESIGN DETAIL
NOTES:
1. USE WITH THREE LOCKING BOLTS a/8'-11 NC STAINLESS TYPE 304
STEEL SOCKET HIM (ff!N GD� CAP SCREWS 2' LONG. GRILL
HOLES SPACED 2O AT 11 1/ 8 RADUS.
2. MATERIAL IS DUCTILE IRON ASTM Aa38 GRADE 80-85-06
3. DRILL THREE I INCH HOLES SPACED AT 120 AND 9 1/2' RADIUS.
4. THE WOR08 'CITY OF FEDERAL WAY S BE OMITTED IF COVER
IS ON A PRIVATE SY51EM.
WG NO
�MEMO W
PUBLIC WORKS ROUND LOCKING COVER D4-12
is.
Kaowwhaf5 below
Call betme you dig
4. o
2ucar �
NOTES:
PNOP
�M D4TB, AASNTD M—Iaa AND MEE �L WSM REQUIREMENTS,
CATCH =1 //xN T" TME LLG9 —1 ,HE MORE �. �.
hA. riAriiKaj
-_ PENE�Dx°.DEaWLL�A�rIN HIo 91MIRW o �0 0e. M
j'
ON OETWL OR vROTUBEwwcEs To PR_ sR=i
j T/r,w. slm €F_
/ a. s1As oPExlxc MAY BE za x 20 aR za DUM. "`,a I
BE USED MELDEDwPe FAamG swrl COMVIr ro ASM A4aT O O v..
a. u EH S OON N. P9 9NNL EXTEND TO WRHIN I OF BOTTDM DF P
7. =:NO ON
3 � OR B! BMTERNNNN EMBECOI�xC EN ACUNRflE'. � BOTTOM NEW
B. o'wp1a um°NOLuuAL s�`iR Mwn,=RES MABEM1'E=E
_j11 ss a/s• \
Te k va• L
arawoL"°� ��1�- - •zD I •,T , , an• , ,/.'
11
ORATE (SXALL BEECCAST IRON PER A9M • 2. A48 CU> NLESS SS U
L,s der J `, >/x• �� �� I -. SPECIRED.
� "I �
�o
JLro
7: N w WORKS MISC. TYPE 2 CATCH BASIN DETAILS D 4-4 G
SEE 2
PRONoORm
A =
�( I
P O / `�+O BOLT —DOWN DETAIL
I
PL1N
NOTES:
1, MATERIAL IS CART IRON ASM A4B CVSS 30,
2. DRILL END TAP THREE S/8'-11 NC NOTES THROUGH
FRVAE AT 120 AND 11 1/18' RADIUS.
NO-
�I WORKS FRAME FOR ROUND LOCKING COVER D4-13
PUBLIC STANDARD HERRINGBONE GRATE DWG. NO.
'�GD 6�1M" WORKS (NOT FOR USE IN PUBLIC ROADWAYS) 4-5
f�a ;,nr �M,¢wn ,e_a/R�x•,/R'. �M mrxr wxcu,e wie
L
�_u
ELM
SECDON A
NOTES:
CE. 1W0 LOCNING BOLTS S B'� 11 NC STENNNLES U 1. E TAP FOR.
°R—EET x� (ALEx INID) CAP SCR
9OUD CWER (DMG. 10. 4-T) OR wHEN S—%N BT2EN6w[ER�
2. —1 IMI 119 CAST IRON PER AEM - CNSS 1,SET III TO GR AND CONSTINICT ROAD AND G TO BE RUSH wIN1 FWNE.
PUBLIC TYPE 1 CATCH BASIN FRAME IN DWG. NO.
FZGI WORKS VERTICAL OR EXTRUDED CURB INSTALLATION 4-6
PRELIMINARY
NOT FOR CONSTRUCTION
01/2022
AS -BUILT CERTIFICATION:
I HEREBY DECLARE THAT THE HORIZONTAL AND
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A
FIELD SURVEY PERFORMED BY ME OR UNDER MY
DIRECTION.
NAME L.S.# DATE
PERMIT NO. XX—XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
NOTE:
THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
APPROVAL DATE. THE CITY WILL NOT BE
RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
THESE PLANS.
FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
I PERMIT NO. XX-XXXXXX—XX I
APPROVED
DATE
1J1i1TE 0
WAaM/y
C �
s 1L
�Sa�DNAL ENOIS
DESIGNED -0
CHECKED KWO
DRAWN NAS
CHECKED MID
AS -BUILT
JOB NO.
21-N21
�/� DATE
01/2022
J
Q DRAWINGNAME
C8
Lu
0 F7.1 12
PIPE ZONE NOTE
NE EII) o� b
oRAVEL BACKFILL FOR O BS%O.D. Q
PIPE ZONE BEDDING (SEE NOTE 4)(SEE NOTE a S
1F%O.D.
FOUNDATION LEVEL \ m
CONCRETE AND DUCTILE IRON PIPE
TRENCH WDTN
(FEE NOTE S)
1 /
o FIR
PIPE ZONE BEDDING b
(SEE NOTE Z)
O DI E
FOUNDATION LEVEL b�
THERMOPLASTIC PIPE
TRENCH YADTH
(SEE NOTE 3)
PIPE ZONE BACNFILL
(SEE NOTE 1)� b
G LBACKFILLFOR o
PIPE ZONE BEDDING DO
(SEE NOTE 2) -
FOUNCATON IEVEL b
METAL AND STEEL RIB
REINFORCED POLYETHYLENE PIPE
INLET GEOTF%n
3
i I
a � )
I (
I
I I
i t
I I
I I
PLAN VIEW
tCROSS BRSES NOT SHONM)
POST (SEE STO SPEC, 841.3(OW.
GEOTEXTIE FOR EMFORARY SILT FENCE 1
SEE STD, SPEC 9-as2n). TABLE 8
b
COMPACTED NATIVE 801E rl
Fto�
ORATE
BURY OEOTEXTE IN TRENCH ^ S
b
INLET
SECTION OA
15
Know what's below.
Call before you dig.
NOTES POST -SSE M.
c. 1a1sN NOTES
1. See Standard SpeelScaBons Section 7.08.3(3) 1. Install the ends of me SR fence to mint slightly upslope to phaVers
. �,. for Pipe Zone BaccMIL Sediment from flowing around the ends of the lenoe.
2. See Standard Specifications Section 9.03.12(3) 0 2. Perform maintenance in accordance with Standard Specifications
for Gnewl Badcfill for Pipe Zone Bedding. --.To 8.01.3(9)A and 841.3(15).
1.� GRAVEL BACKFILLFOR POST EVERY T BEN.) O.C.
PIPE ZONE BEDDING 3. Splices shell never be placed In low Spots Or Bump locations. If
;! r 3. See Standard 313eelflcatlons Section 2-09.4 located in low or Bum splices are
( rench dth, WiGEOTIXTE
P areas, Me fence may reflect to nd
for Measurement of T
'natalled unless the Prefect Engineer epproass Me installation.
4. For sanitary sewer installation, concrete pipe shall reI g n8 Para peed m
e- De artedded to spring line. BACK PACT s 4. Install Bill fend HMI fo ma INour lines.
SEPARATE BASE mP.l INTEGRAL BASE COMPACTED b
PRECAST NATNE BOIL
(Ae 11
IN)ONLY)
TYPICAL CONDITION FOR DRAINAGE STRUCTURE SELFiOCKNG TIE-r1TLON ed (MIN. GRADE.
FAOW tma MIN. TNSILE STRENGTH. W STABILIZED
THE DETAIL APOLIES
&10STANDARD B... e D B...3 &1880. BEE NOlE 1
6N.20. L.,e 6M.2O AND 630.A0.
TRIEN
TH
(SEE CNO NOTE
BURY BIN TRENCH C
PIPE ZONE BACKFILL QO
(SEE NOTE 11 _ a .. F a®� ' / SS,
L FOR $
GRAVEL
PIPE
ELZONE SEODINO A.
(SE NOTEA 1. RISE '.9' Q®
FOUNDATION LEVELDURING EIrCAVKTON 'AN IMIZE
1 I THE GROUND
AROUND TRENCH AS MUCH ASS IB FEIB EG AND SMOOTH
SURFACE FOLLOWING EXCAVATION lb AVOID CONCENT- GEOmE LE FOR SILT FENCE -SEE STANDARD
RANG FLOWS. COMPACTON MUST E AOEOUATE TO B® p3PgECaE(IICA��SSEOTI011
PIPE ARCHES PREVENT UNDERCUTnNGF0=MU �' f' NT POST
- WOOD Oft STEEL
TYPICAL INSTALLATION DETAIL I (TYPICAL)
HE/t (STEEL POSTS SHOWNS
CLEARANCE BETWEEN PIPES eT -eir, Y'A
FOR MULTIPLE INSTALLATIONS +-s�s,<;' . F VaT��
MNIMUM 5 -•' - %' ' .•fL U WI GPEMCmHIRCT
DISTANCE ze G / 5'Q
PIPE SIZE eE1V N Be °lei pyo `i - % ANORA L. SALISBURY
BARRELS S G CERTFICATE NO.OWBW
sy0h'AL
CIRCULAR PIPE /- fdA'g+ FAertlC (GEOry-= e�pN•,M
(DIAMETER) UP T048" 24" Aug 1T, 2021 % �P TYPICAL SILT FENCE mPCAU
"�•�-•-P�
PIPE ZONE BEDDING IS BEE xoTE WTIOUT BACNUP SUPPORT
METAL DIAL RR AND BACKFILL rsEEL SSNu SILT FENCE
PIPE ARCH a$" AND OR Sir.
(SPAN) LARGER WHICHEVER STANDARD PLAN 0-55.20.03 STANDARD PLAN 1.30.15.02
B E88 SHEET 1 OF 1 SHEET SHE.1 OF 1 SNET
SPLICED FENCE PREVENT
SECTIONS ILT A BE CLOSE ENOUGH
APPROVED FOR PUBLICATION TOGETHER TROUGH THE
SILT FENCE
AT WATER FROM APPROVED FOR FUBLICATION
��- Aug 17, 2021 ESCAPING Tnaoucn THE FENCE AT THE ovEauP ECG BSkoUeh Ill 3
w.MeF,.RsraF mm�,wT...Fwr.,� SPLICE DETAIL
GA POSTS SHOWN) �w.n.P..NR. pFw-wnaTwnMerNAm
FASTEN CROSS BRACER TDOETHER WITH
SCREWS. NAIL
LI
ISOMETRIC VIEW
(ENTIRE FENCE NOT SHONM
FOR ILLUSTRATIVE PURPOSES)
NOTES
1. Prefat ogled units may De used in Ile, of the design
shown on this plan upon approval of the Engineer.
2, 14udure Shell be consWded SUCH that geolex ile
materiel shall IN, fastened to posts cheating a seam.
M.10'..
3. Ensure that ponding height of water does not Cause
flooding on "Scum roadways or pnVam property.
4. PeNom1 maintenance in accordance wkh Standard
Spedhca4on 8.01.3(15).
Odn�b�RI
1� DBLAPEARLHIECT
,MARK W.MA�IRFRER
.m� CnEEUDFlw•ur�wrae
TEMPORARY SILT FENCE
FOR INLET PROTECTION
IN UNPAVED AREAS
STANDARD PLAN 1.40.10.00
SHEET I OF I SHEET
APPROVED FOR PUBLICATION
Pasco Bakotich 111 09.2047
P IBM
NMIJ
1' IT) DEPTH OVERFLOW �I S-
p d1 �LDMPALTEDNATIVEANERIAL
RUC
LL Z Z CONSTTED BY EXCAVATON
OR EMBANKMENT
SEDIMENT TRAP BOTTOM J OUSRY SPALLS- I-IFTI DEPTH
SEE STANDARD SPECIFICATION
SECTIONMs11a)
1' (FT) DEPTH OF SM' -1 IoT
LOUR BE AGGREGATE FOR PCEMENT CONCREE- SpRwGEOTEXTLE FOR SEPARATION
SEE STAINDARDCPEOIFIAZO, SECE STANDARDSPECIFICATIONSTO-TION&3-
SECTION OA (A )
AS REDUIRED- IUD (FT) MIN.. (FT)DI MAY
BE REDUCED TO ED (T) MIN. FOR
alms WITH LESS THAN ONE ACRE
OF EXPOSED SOIL
I-I")DE THLLS-
:HARGE TO SGU ILDED
EL SPREADER
UTET, OR
OVERFLOWCHANNEL
3MITS OF QUARRY
RxUL s-mp)
PARTIAL PLAN VIEW OF BERM
SETTLING POND coMRIAORPPARTIAL OR
MIN. I CAVATION
VSETNING DEPTH 1f7 �1
ROUND -NE
a sEDIxaxr sroRAGE
GROUND LINE
LONGITUDINAL SECTION EMIRARv SQL TFECK
NOTE M
COONNTINUOUS .—TILE
BETWEEN
ETUNDEENTHEG�AY ROCNORND THSIUnVVEE EARTHEN MATERIAL.
TEMPORARY SEDIMENT TRAP
PRELIMINARY
NOT FOR CONSTRUCTION
01/2022
3G MIN. I—)
PERMEABLE BALLAST (TYP.1-SEE
STANDARD SPECIFICATION
SECTION 9,03sou
N E
PUCE CONSTRUCTION GEOTEXTILE FOR SOIL LROVIDFULL WIDTH OF
GRESS/ EGRESS AREA
STABILIZATION FROM THE EDGE OF THE EXISTING IF (FT) MINIMUM
ROAD— TO THE UCTION
OR AS DIRECTED BYOTHETENG NEERENTRANCE,
ISOMETRIC VIEW
STABILIZED CONSTRUCTION ENTRANCE
STABILIZED CONTTINTRANGE SLLMTHE 1-111ENTS
CSTANDARD SPECIFICATION EN S o .3(T).
/ COARSE COMPOST
� L
C ` C
OR SLOPES STEEPER THAN 4H 'X FOR SLOPES IN IV OR FIATTER'V A
� /`CB EI.
TYPICAL SECTION MISCELLANEOUS 17
COMPOST BERM DETAIL EROSION CONTROL DETAILS
STANDARD PLAN 1-80.10-02
SHEET 1 OF 1 SHEET
IPPRONED
IN
�w
AS -BUILT CERTIFICATION: NOTE:
I HEREBY DECLARE THAT THE HORIZONTAL AND THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND APPROVAL DATE. THE CITY WILL NOT BE
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
FIELD SURVEY PERFORMED BY ME OR UNDER MY THESE PLANS.
DIRECTION. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
NAME L.S.# DATE
PERMIT NO. XX-XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
I PERMIT NO. XX-XXXXXX-XX I
APPROVED
DATE
L If It IYA
NNITE O
VIASMA�iL
IY 1
Y 1L 11
p0 � 60218 G ��Q
�SS�OIST ENOI'
DESIGNED KWO
CHECKED MO
DRAWN NAS
CHECKED MID
AS -BUILT
JOB NO.
21-121
/� DATE
C a' 01/2022
J
Q .RAWINGNAME
C9
LU
0 F7.1 12
BIDENNIK RAMPV F 4-PWIN. CEMENT
CONCRETE SIDEWALK
OF STALL
RT-0m
IIAII [ Y-P
<'VADE.YELLOW D �' AACE �OEF CUftE
PAINT DNES
PAINT LINE IYPJ
4Q Y P
B-P��SPF MINN4MI
PLAN
o ONE ACCESSTALLIBLE STALLNT
ONE ACCESSIBLE STALL
W' PARItINO STALL ARMXOEYEM
MIN.
6TYP
THREE ACCESSIBLE STALLS
PLAN
TWO ACCESSIBLE STALLS
CEMENT
CONCRETE
91DEWN.K 61DEVMNM( RAMP
Ri-0Ot
R7-0OtA
F
1•N DE,VMRE
N xE TYR)
\� \b,
FOUR ACCESSIBLE STALL
F OF STALL
FACE
4--E.Y LOW
PA
I LURB
46•
PUN uNF mP) I
P B PR r-o-
SEE DETAIL .n4'-r R.
B-P MN 5'-P B-PMIN. B.Pk1IN.
DETAIL A ore-P
PLAN
ALTERNATIVE PARKING STALL MARKINGS
USE ONLY WHEN SPECIFIED IN THE CONTRACT
NOTES
i. Three, four and five accessible stall anangamenh may Da eiMer 6O° (argled) or 9D° (W'
pendicular) parking ammhgenumm. See Contact
2. An AGESSS Parking Spam Symbd is required far Each aaessible parking stall. A blue
barkgreund and white border are required when the symbol is installed an a mment con-
crete surfam.
3. All acrossible stalls shall have wheal stops. Plam Wheel stops in other stalls when sped
fled in the mntrect Wlheal stops shall be approamately 6• high and a minimum of 8' kNg.
4. Refer to the Standard Plans for MhmWalk ramp, deteclable warning pattern, and mrb details.
N
LLOW eti•
U
LEGEND
P RTA01 Rammed Parking Sign and host
wth RTdOtA Plaque, if indimted
g
X a' \
rngLE) g 6�N" g 6 6 d �
PLAN
(Sea Sign Fabrication Manual)
Acmes Parking Spam Symbol
®Manufactured wheel stop
I Detectable Warning Patem
TWO ACCESSIBLE STALLS
eP PARXIXD STALL ARIMANOEMENT
r"P $IDEVVPL(MMR T.P 4'- W,
-r
B-P
ttP. �\e ��\d� \e �\
6'
S FIVE ACCESSIBLE STALLS
ED bRVxMIH
NOTES:
LOCNNN MOLTS.
1. PIPE SIZES AND SLOPES: PER PUNS.
2. OUTLET CAPACITY: NOT LESS THAN COMBINED INLETS.
pFs�Siai
3. EXCEPT AS SHOWN OR NOTED. UNITS SHALL BE CONSTRUCTED
IN ACCORDANCE WITH THE REQUIREMENTS FOR CATCH WIN
NVE13-V PLAN
TYPE 2, 5e MIN. DAM.
4. PIPE SUPPORTS AND RESTRICTOR/SEPARATOR SHALL BE OF
SAE MATERW„ AND BE ANCHORED AT V MAX. SPACING
BY 5/B' DWA. STNNLESS STEEL EXPANSION BOLTS OR
STEPS m IwxO.
EM DOE° 2' IN WPLL.
5. THE RESIRICTOR/SEPATATOR SHALL BE FABRICTED FROM
060' ALUMINUM, OR .064' ALUMINIZED STEEL OR .064'
GALVANIZED STEEL PIPE; IN ACCORDANCE WITH MSMO
M 36. M 196, M 197 AND M 274. GALVANIZED STEEL
SHALL WIVE TREATMENT 1.
GATE. sxEW
DATE
6. OUNET SHALL BE CONNECTED TO CULVERT OR SEWER PIPE
WITH A STANDARD COUPLING BAND FOR CORRUGATED METAL
PIPE. OR GROUTED INTO THE BELL OF CONCRETE PIPE
]. THE VERTICAL RISER STEM OF THE RESTTCfOR/SEPARATOR
SHALL BE THE SAME DAu. AS THE HORIZONTAL OUTLET
PIPE. WITH AN 8' MIN. DRAM.
I- DLV. m PLAN
B.FRAME AND LADDER OR STEPS OFFSET SO THAT:
A CLEAOUT CATE IS WSIBLE FROM TOP.
B. CLIMB DOWN SPACE IS CLEAR OF RMER AND
CLFANOIR GATE.
C. FRAME M CLEAR OF CURB.
9. IF METAL OUTLET PIPE CONNECTS TO CEMENT CONCRETE
PIPE: OUTLET PIPE TO HAVE SMITH O.D. EWAL TO
CONCRETE PIPE I.D. LESS 1/4'.
10. MULTI -ORRICE ELBOWS MAY BE LOCATED AS SHOWN OR
ALL ON ONE SIDE OF RISER TO ASSURE LADDER
CLEARANCE.
11. ORRICE MUST BE INSPECTED PRIOR TO INSTAUATON
PuIE MM �nm J �'�
ELBOW DETAIL \
PUN
PUBLIC �FLOW RESTRICTOR / OIL POLLUTION DWG. NO. Gu�O WORKS CONTROL STRUCTURE, TEE TYPE (FROP-T) 1 4-14
ro
Know what's below.
Call before you dig.
ELEV.
DIA/WIDTH
M
TOP OF RISER
223.70
12'
ORIFICE 1
214.20
0.39'
ORIFICE 2
221.70
1'
ORIFICE 3
223.20
0.5"
OUTLET IE
216.20
12' W
INLET HE
216.20
24" E
OU-�W e'1Fy�A5N'G4' ��.�dl
1��1€
OA ,eOI8T8W` �2�� °ly
aayONAL gaG l$�I�p(I
E%PIKES AUGuSi 9. 2009 Ball
PARKING SPACE LAYOUTS
STANDARD PLAN M-17.10-02
SHEET I OF 1 SHEET
APPROVED FOR PUN.LGT011
Pasco BakoOch Ill 07A3.08
o�.I
T E' u se xoTED
OTHERNI8E IN CONTRACT
a
ias
STOP
LINE
NMITE OR YEU - SEE CONTRACT
CHEVRON OR DIAGONAL
CROSSHATCH MARKING
W • P IN FOR POSTED SPEED OMIT OF 40 MPH OR LOWER
W12" FOR FOR POSTED SPEED UMR OF 45 MPH OR HIGHER
b EDGE LINE
4 --I 1^
.d
SHOULDER°
MARKING AREA =11.73 SQ.FT.
HALF -MILE MARKER
EDGE LINE
r�
b
M FULL MILE MARKER T
AERIAL SURVEILLANCE MARKERS
NOTE
CENTERLINE OF JUNCTION BOX,
1. If Rumble Strips ale present,
f PULL BOX, OR CABLE VAULT
astall melting oUtside Of
the Rumble Ship,
EDGE LINE
Id,\�
CEMERUNE OF
CROSS CULVERT
GE
b �
T�I\�UNE
�
OLDER
JUNCTION BOX,
> $� CROSS CULVERT
ULLB � OR
SHOULDER
MARKING AREA=5S
0SDFT
MARKING AREA = GES ED.FT.
CROSS CULVERT
..
JUNCTION BOX, PULL BOX,
OR CABLE VAULT MARKINGS
DRAINAGE MARKING
EDGE LINE
4' iYP
BD° m• m
Y-P
SHOULDER
MAFNENG AREAm SO.FT.
DRAINAGE STRUCTURE INLET
DRAINAGE MARKING
o�J' W9
W uea4y�9
B BB018TBM00 `2m
�'�/ONAL eaG
W. Brien
SYMBOL MARKINGS
MISCELLANEOUS
STANDARD PLAN M-24.60.04
°MeNe W+. Orw-.•h+Ww-e:Mm
rcx Hx.
caNEeoCimsNic. mO nu0cL 1�� / l� � / O
/O �°Vhl°rtreraIwE reMIuWhwIH. xxsw_.
O
Ee
'____-_�__
O O O
------------
0 OO H
few REcwumwrwxs. SITE MAXIMUM OPENING
OF GATE
NOE6:
1. SHEAR GTE SHALL BE ALUMINUM ALLOY PER ASTM B-26-2G-32n OR GAST IRON
SIM A48 CIA59 bB AS KOUIREO.
2. GTE SHALL BE S' DAN. UNLESS OTHERWISE SPECIFIED.
a. GTE SHALL BE JOINED TO TEE SECTION BY BOLTING (THROUGH FLANGE). WELDING,
OR OTHER SECURE MEWS.
4. UFT Rea: AS SPECIFIED aY MFR. ARM H NDIE EXTENDING TO WITHIN ONE FOOT
OF COVER AND ADJUSTABLE HOOK LOON FASTENED TO FRAME OR UPPER MWDXOLD.
6. GTE SHAJL NOT OPEN BEYOND THE CLEAR OPENING BY UMITED HINGE MOVEMENT.
STOP TIB, OR SOME OTHER OENCE,
6. NEOPRENE RUBBER GASKET REQUIRED BETWEEN RISER NOUNNNG FRINGE AND GTE FUVIGE.
]. MATING SURFACER OF LID AND BODY TO BE NACHINED FOR PROPER FR.
8. FIANCE MOUNTING BOLTS SHALL BE 3/8• DIAM. STAINLESS STEEL
9. 11TFPGlE CITAKOUT/SHEAR GATES TO THE DESIGN SHOWN ARE ACCEPMBIE.
PROVIDED THEY MEET THE MATERA SPECIIGTIONS ABOVE AND IMYE A SIX
BOLT• 10 3/a' BOLT CIRCLE FOR BOLTING TO THE FWIGE CONNECTION.
JULY Wt4
Afmam0Vft WORKS FROP-T SHEAR GATE D4-15
PRELIMINARY
NOT FOR CONSTRUCTION
01/2022
AS -BUILT CERTIFICATION:
I HEREBY DECLARE THAT THE HORIZONTAL AND
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A
FIELD SURVEY PERFORMED BY ME OR UNDER MY
DIRECTION.
NAME L.S.# DATE
PERMIT NO. XX-XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
NOTE:
THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
APPROVAL DATE. THE CITY WILL NOT BE
RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
THESE PLANS.
FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
I PERMIT NO. XX-XXXXXX-XX I
APPROVED
DATE
a
w
0 >
w a �<
IYL
`aJ W\
W � W
a�Jul
I-
0
0
LL
M�
W
-i-i TL-71 o OW
V - U W^
0 Q3
z = W H3
Z X HW
ILLJ
z +
W Q � l
OJ wI`
V X, CV
,pIHITE OR
1�?E OF WABMA�y�
Y r7 r
P S�O'ST ENO
DESIGNED KWO
CHECKED KWO
DRAWN NAS
CHECKED KWO
AS -BUILT
JOB NO.
21-021
DATE
V/ 01/2U22
J
Q DRAWING NAME
I.ass. C10
III
Q 10 OF 12
PROJECT SUMMARY
:UOADI1G=1320&1EGS
F. UNEARFWT -(SSE.
I.
WIB.A9U. N
_STORAGE PR OED=9.R MDIAMETER
PIPE DET
eARREU SIZING SS N.
BWIDTH
ADET
ENDS =,2Ix.
NOTES
ION
ALL RISERS D$TOM ARE 2%JEA ycCORRUGATIW AN13
UNLESS
RISERS TO BE ==E-D TTODGRADE,
LED
TO EXISTING D""AAUX ONu PIPEISKK'
NEEDED IT IS TIE RESP W SNNUTv OF THE CONTRACTOR.
TYPE TO BE DETERMINED UPON FINAL DESIGN,
PROJECT SUMMARY IS REFLECnV a OF THE DYODS DESIGN,
• WANTInESMEAPPROx. AND ENOULD BE VERIMED UPON
FINAL DESIGN AND APPROVAL. FOR ENAMPUe, YMN.
ExCAVATIW DOESNOTCONBIDERN4VANABLESSUCHAS
SHORING AND ONLY ACCOUNTS FOR MATERML wOwx THE
ESTMATED Ex ON FOOTPRINT.
TXESE Dw.wsNGSARE FOa CONCEPTUAL PURPOSESANDW
xOTaFFLECT ANY LOCAL PREINENCES OR REGULATIONS.
PLEASE CONTACT YOUR LOCALCONTECH RFP ION
MDD 'CATIorvs.
ASSEMBLY
SCALE: 1" - 10'
_-� C�'I�NTECH' N."O �aT€CH DY012727 Davis BFJ -Fed Way
1NGINEELED SONIRGNS LLC CMP DETENTION SYSTEMS 8' DIA CMP DETENTION SYSTEM
cvoos Federal Way, WA
. , DETENTION SYSTEM �°
�� �YM9RDEBOR�N N
„� „3�s,w F O D1
PIPE SPAN,
AXLE LOADS (kips)
INCHES
tbw —I I snD
ttat
MINIMUM
COVER
(ED
So
3.0
aD
SCALE: N.T.S.
ACCESSCASTINGroBE
PRWIDEDANDINSTALLED
BY CONTRACTOR.
� 6 IN
)
r "A
NIBNT�MONTRACTOR• mCMP�RISER tt'TYP.L 9
NEON 9€�
3W
SECTION VIEW
Wooemwisrsemoen eTHTMEuiREnxiiMFACTuaDRoRwwceroTHEAPPLCLEcrem"SS=I TePIrsoiNnsF THEOrLo HEc.REorsSELM,
nut RI ALUMRNED—B 2: AASHTO—OR ASTMA-TSO
uL L COx SHALFORM TO THE APPLI—P RE W REMENTS
LISTED
B Lo . GUV -D: AASO M36 OR ASTMA.T60
T APPLICABLE REWIREMENTSS OF AAENTO M. ORASTM AA2. MxuMC MSHTOM$MA-T62
S60RASTMB]aS
REWREMENTSOFAASLMOIM2,88ORLASTAA,y18iO THE APPLICABLE
PS(NATIONAL CORRUGATED STEEL
THE YIER COATED STEEL COILS I —
LUMIIZED
APPFORM TO THE PTPCASS FOR LcABLE REWIREMENrs aFAAsxroMzaB aaarrnAEAz. RIIATEDITEEL EcoMMENDnT orvs FaaAuuMINUMP eEzALVANaeo oa POLYMERS
_ 7SHALL BE IN ACCORDANCE YATH AAENTO STANDARD es FOR
CONSTRUCTION LOADS MAY BE HIGHER FINAL Loons. FOLLOW Ei. GALVANIZEED onro-YMER Teo �EyoRASTM
MANUFACTURERS OR NLSMGUIDELINES. P�S(FOR AL MINUMPIE)ANDW—ORMANCE WTTHTHE PROJECT
•I�ll�
I,
ROUND OPTION PLAN VIEW
1NDgDEsiGry R ACCH1:1 E— AASHTO, 171 EtJmW.
2. DEBIGR LOAD H52S,
3. EARTHCMER=t'MAz.
S. RM.—CINGETEEL ==ASMIABI—RAGE.
B.OPIN- RA-TOTRERANSINTERRoa.u,
HALF EACH SIDE. ADDITWAL SANS TO BE IN
THE — PLANE,
REINFORCING TABLE
D CMP
"BEARING
RISER
A
GB
REINFORCING
PRESSURE
(PSF)
�-
it
asp DLEw
30•
3r
=1
o0c
msxs
e4Y S'd
bSMtO'OCEW
tT20
sr
uerocEw
utD
me s
As®9'oLEw
,A00
x8'
AS@sSCc_
too
ASSUMED SOIL BEANNG CAPACITY
Ay
E SEE NOTE E.
SQUARE OPTION PLAN VIEW
mNOOVTE 0 $IABANDALLMNENI�N CTOR
S TOBE
MANHOLE CAP DETAIL
SCALE: N.T.S.
CONTECH' DY012727 Davis BFJ - Fed Way
s r�s� s l�vs>c ' R�
.^�-+�+••-++ ENGINEEeED 51NA1110144 LW CMP DETENTION SYSTEMS 8• DIA CMP DETENTION SYSTEM
Federal Way, WA
DATE RL,HSMNDESDRIPDDN BY 'tn "46°5100° "�TA'S_ Drops DETENTION SYSTEM .P.
D3
0
Know what's below.
Call before you dig.
QMINIMUM wIOTH DEPENDS ON SRE CONDITIONS AND ENGINEERING JUDGEMENT
Q F urvDAT ON BEDD NG PRE ABLE
G�AODRETGNP��INGETNITETBE ING, THE FOUNDATION MUST BE CONSTRUCTED TOAUNIFOR.AND
NTERED
ARPRWED BYTITXE ENGINEERMOVEDAND BRWGHT BFLKTO THE GRPDE WTM AFRLMATERMLAB
S IMUNCHZONE LWTERMLSHALLBEPLACEDANDUNIFORMALLYCOMPACTEDWITHOUT
SOFTBPOTS.
IFT(,S')DIFFERENT
BACKFILLSHALLBE/
—ID DIFFERENTIAL
nFFeALTERNATE
z.s
L L
FRONT
MAY DETAIL APPLICABLE FOR CMP
—mNpE—
PLAN EENDUIG ON SMALLER SYSTEMS ON
TYPICAL MANWAY DETAIL ACT —SITE G—IFIC CONDITIONS.
SCALE: N.T.S. f
EDeTaE)
f]
ELEVATION END
TYPICAL RISER DETAIL uMRS ARE OPTIONALAND ARE NOT
REDUIRED FOR ALL SYSTEMS.
SCALE: N.T.S.
LINN OVER TOP
OFEPINS
DFREDUIRED)
LIMITS OF
REQUIRED
SYBACKFILL
STEM
DIAMETER
TYPICAL SECTION VIEW
LINER OVER ROWS
SCALE'. N.TS.
TWMF PRWECTINAN XDRE MEMBRANE LINER IS RECOMMENDED WITH ON E SYSTEM.
TXE IMPERMEABLE LINER IS INTENOEDTO HELP PROTECT THE SYSTEM FROM THE
POTENTMLADVERSE EFFECTSTHAT—ESU.TFROMACHANGEIN THE
SURROUNDING ENVIRONMENTOVERA PERIODOF TIME, PLEASE REFER TOTHE
CORRUGATED METAL PIPE DETENTION DESIGN GUIDE FOR ADDITIONA.
INFORMATION.
CONTECHj!*�' DY012727 Davis BFJ -Fed Way
.---..----. eeaNeeEeo SOIURGNS ue CMP DETENTION SYSTEMS 8' DIA CMP DETENTION SYSTEM "
Federal Way, WA
D2
.a._..- -� wTE REwBIox DExRIFTNx eY 'Ip s,3as,ao eoas,w7 C��°mDws DETENTION SYSTEM
PRELIMINARY
NOT FOR CONSTRUCTION
01/2022
AS -BUILT CERTIFICATION:
I HEREBY DECLARE THAT THE HORIZONTAL AND
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A
FIELD SURVEY PERFORMED BY ME OR UNDER MY
DIRECTION.
NAME L.S.# DATE
PERMIT NO. XX-XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
NOTE:
THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
APPROVAL DATE. THE CITY WILL NOT BE
RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
THESE PLANS.
FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
I PERMIT NO. XX-XXXXXX-XX I
APPROVED
DATE
Q
Q
W
a
W Q o a
LL p 3
Q W �3
W §��
W
Q �
LL
I-
0
0
�LL
M`
W
(> S WE
D rn
0 Q 3
z N o ya
� Z 0: aN
L.0 O D "
z + 0 a�
U c z
z 0 6f
W LLJ Y Ln
IN ? Lc'
J W 10
N co
(� x N
fJVAITE 0
WAgMY
y AP 1
cy
Y L 11
9 60218 I.tT ��
IST
Oe S�ONALEaENO��
DESIGNED KWO
CHECKED KWO
DRAWN NAS
CHECKED KWO
AS -BUILT
JOB NO.
21-D21
�/�
DATE
U) 01/2022
J
Q DRAWING N..E
C11
LU
Q C 11 OF 12
CMP
IN -SITU TRENCH WALL MAINTENANCEN SYSTEM INSPECTION AND
CMP DETENTION INSTALLATION GUIDE
F ExGWANM IS REQUIRED, WE TRENCH WALLNEEDSTO BE CAPABLE OF WIUCk. WML FILL ISUSEOYOU DEMEUST NTHEVENT PIPE ANDTTE UNDERGROUND _ INFILTRATION
WILLPRONSNSTMLATi TERM AFLEXI UE IM-CE.E GROUND HECOM*URATITIONSYSTEMHEM A .CANEDYTOS ENJP PRIG TO THE PLAC MEENT OF TIEEN % iIFT. THE ENS ECTED AND MMNTMNED AT REGULAR INTERVALS FOR PURPOSES OF
WILLEMS EGG.TEMPEECIAL N THECONFIGURATICE—ATEB SUPPORTING THE LOAD THAT THE PRTI SHEDS WESELOADS TEMIPELOADED, IF ALLOWABLETHICKNEBSOFTHECLSMUFTISAFUNCTIONOFAPROPER
OFTEN REQUIRES SPECLALLONSTRUCTION PRACTICES THAT SOILSARENOT LARABLE OF SUPPORRNGTIESE LOADS,TXE PIPECAR DEFLECT. CE BETWEEN THE UFLIFTFORCE OF THE C=OF THE PIPE. AND TC-AEREFFILE12"' RLSM. WE OPPOSING PERFORMANCEARDLONGENtt.
DIFFER ROM CONVENTIONAL FLEKIBLE PIPE CONSTRUCTIN. CONTECX PER FORMA SIMPLE SOIL PRESSURE CHECK USING THE APPLIED LOADS TO
DETERMINE WE LIMITS OF E%CAVATION BEYOND WE SPRING LINE OF THE
INSPECTION
ENGINEERED SOLUTIONS STRONGLY SUGGESTS SCHEDULING A
PRE-GNSTRUCTION MEETING WRHYOUR LOCALSPLES ENGINEER iO SALES ENGINEER CANHELP ALSO AFFECTS WE CLSM INSPECTION ISEASIY TOEFFECTIVELY NEI. ONTEC"RECAINTENANCE OFCMP ENS DS ONGOIION
NUMOSi CASES WE REOUIREMENTS FOR A SAFE WORK ENVIROMMENTAND LLSNS ECnON3. SGES MSTH wG o RASH LOADORSMALL OUTLET
ARPROPRIATE FORYOUR SITErURES. NOT COVERED IN THIS GUIDE. ARE PROPER SACKELL PLACEMENT AND COMPACTION TAKE CARE OF THIS CONCERN. TERMINE TXE EOPERLIFT TXICKNE88.
CONTROL ORIFICES MAY NEED MORE FREQUENT INSPECTIONS. THE RATE AT
FOUNDATION ?wR.x'MaawLLLR WHICH THE srareM cousins vouITTANTS WTLLDEPEND MORE oN SITE
FOUNDATION
FOUNDATION THAT CANS O O oo , Pu"Rrwxvsuus STSEE�.I, ACTIVITIES RATHER THAN WE SIZE ORCONFIGUMTION OF THE
CONSTRU
plo� IONS SHOULD BE PERFORMED MORE OFTEN IN ECUIPMENT
ITSPNTEGRIWTDURNGCONO N3TRUCNTX KFILL MIGHT AS WELLAS MAINTAIN °-E TON
E
FBI =Hg_AREAS.INCUMX1MVRE NO
OK ONSTAKEPI-ACE.ANDIN
H WHICH
ORUNSU
ISOIPoLII TOOWN TOAISUITABLE
U TABL EIDEARMEX PNNU TGIIEN BPEURD Up To
THE
N wLOFoeFmxousrn LORRLD EXPECT GIVECONDINIONSAARELOROOFRFACX MSPECTIONIARO�
S MIGRATION OF FINES, CAN CAUSE SETTLEMENT a uIPP+uLsn a NAINTAINED FOR THE LIFE OF THE SYSTEM
SYSTEMORMVEMENTABOVE, IFTXESTRUCTURALFRLMATERIALISNOT
COMMTISLE wRH WEUNOERLENGSOILSAN ENGINFERIrvG FABRIC SHOULD BACKFILL PLACEMENT '°"°'"`"""w"""`""°""I MAINTENANCE
SE UMDASASEPARATOR. IN SOME CASES, USINGa STIFF REINFORCING
GEOGRID REDUCES OVER UKCAVATON An PI-ACMEITIES. T FILL QUANTMATERIAL SHAU_ BE WORKED INTO THE PIPE HAUNCHES BY MEANS OF
e LICING.RGDING.AIRTAMPER, VISRATIRY ROO OR OTHER EFFECTIVE
.—CS.
44�
� !-
GRADETHE FOUNDATION SUGRADE TOAUNIFOR OAR SLIGHTLY SLOPING aLamFuns esmixs
GRADE. IFTHE SUBGRADE ISQUENCE CV•YOR RELATIVELY NON.PoROUSARDTHE
CONSTRUCTION SEE THE GRAOETOONELAST ENOO TEE SYSTEM PERIOD PROCEURESAREBETERMNEONFEASMLEeYTHE
WA TER TO DRAIN QUICKLY. PREVENTING SATURATION OFTHE GEOrECHNICAL EGNEE OF RECORD, COMPAC ISCONSIDERED
BGRADE. ABOUATE WHEN NO FUNTHE YIELDING OF THE MATEIAL IS OBBMED
UNDER THE COMPACTOR, OR UNDER FOOT, AND WE GEOTECHNRC
ENGINEER OF RECORD (OR REPRESENTATYE THEREOF) IS SATISFIED WITH
GEOMEMBRANE BARRIER THE LEVEL OF COMPACTION.
VIEWHERVAR
SALTING AGENTS ICE USEDHSUCHE AS ROAD SALTS FOR DIEIC IG AGENTS. IF
SALTING AGENTS ARE USED ON OR NEAR THE PROJECT SITE, A THE ENTIRE MYTH! OF WE SYSTEM IS REACHED.ADVANCE WE EQUIPMENT
THE POTS TiALADVE BEFFECTS T'HATEMVE RESULT FROM WE USE OFM CONSTRUCTION SEQUENCE PROVIDES ROOM FOR STOCKPs DSACKFILL
ECKHOE.AS-ELL-THE MOVEMENT OF
INCLUDING PREMATURE CORROSION REDUCED COxSTRUCTNiRARFIC. MATERIAL STOCKPRES ON 11111111
ERY LIFEBACKFILLEo DETENTION SYSTEM SHOULD BE LIMUE To S-TO 10IFFT HIGH
AND MUUI OVIOE BALANCED LOCOING ACROSS— BARRELS. To
THE PROJECTS ENGINEER OF RECORD IS TO EVALUATE WHETHER SALTING E PHOPE COVE OVEN THE PIPES TO CILOW THE
AGENBESi�IL BE GEMENTUSED ON OR NEARTHE TODETERMNEIFANYAD—OTSITE, AND NA-PROTECTSVEHISMER MNTOF CONSTRUCTION LOCAL CONTECH SALES ENGNEERUIMETSEE TABLE t.OR LONTCCTYOUR
REEDIRED BELOW ISATYPICALDETAILSHOWINGTHEEM OF AGENTS ARE USED ON OR NEAR I ZE PRI�EFEFDISIPTR TING
CUP DETETION SYSTEMS SHOULD BE CLEANED WHEN AN INSPECTION
CONSTRUCTION LOADING =UMULwTED PEDIMENT DR TRASH IS CLOGGING THE DISCHARGE
FAorvI OF WE OU- F�eDMMICIiLOVERE SHOULD BE SECURTL N
NECESSARY SINCE CONSTRUCTION EQUIPMENT VARIES FROM JOB TO JOB.—EOFOLLOWINGCLEAxNGACTVITE3.CONTECH BUGGESTSTHATPLL
BEQUIMENT SPECIFIC MINIMUMC AT
IN ER OR NEAR THE NLETANO WE OUTLETO ORIFICE. SHOULD IT BE NECESSAMEMS S DESI.WED WIN AN ACCESSIINSPECTION MANHOLE TO
ECH SALES ENGINEER DURING GET INSIDE THE SYSTEM TO PERFORM MAINTENANCE ACTIVITIES, ALL
YOUR PRE MSTRUCTION MEETING. T APPROPRIATEPRECAUTIONSREGARDINGCONFINEDSPACEENTRYANDOSHA
REOULATIONS SHOULD BE FOLLOWED,
UNDER-ROUNDSYETE
ADDITIONAL CONSIDERATIONSFINELUDIN MBE
S
CANARAPIDLY OST FILL THE ESYSTEMS ME CONSTRUCTED BE— FAINFAU_ XGVA1ON POTENTIALY CAUSING FLOATATION AS PARTOF THE MAINTENANCE PROGRAM FOR THE SYSTEM.
anWTE IIFFOR THEOwn ER TO oSCAE. TEMPAUR ORARYDrvERS10N MEASURES WFATHER,
MON' BE REQUIRED FOR HIGH FLOWS DUE TOTHE RESTRICTED NATURE OF THE FORMONG INSPECTION AND MAINTENANCE EFFORTS HELP ENSURE
UNDERGROUND P PE SYSIDIS USED THE OUTLET PIPE. TOFU —ON AS INTENDED BY NETIFTENG ROK Oco M.oEDOBGULAN nxUE
SPECTIOx ARDMANTENArvcE PN.CTICES.IrvSPECTIDn AND Nwk SCE
awx� OF NPEJOINTCONNECTIONS IS BEYOxDTxE SCOPE OF THIS GUIDE.
C+ NTECH' A&/&uTewu° DY012727 Davis BFJ -Fed Way
CIS?! B' DIA CMP DETENTION SYSTEM
+•d•••�•++•-.++ ENGNEEEED SWUDONS I1C CARP DETENTION SYSTEMS
Federal Way, WA
DATE -1. DESC��U DYMODS DETENTION SYSTEM
co
Know what's below.
Call before you dig.
SITE SPECIFIC Owiw NOTES.
SSUCIUR ID ID
Treatment Plow Rate ds B Y
Peak Fbw Rate Ids) TR`T= eELawE GE
EIT
lw+sB
IE
Tap d Vault EI—GG, Oil RCP MAX. INLET p. / PRE—B.asxF
. IuvEgGwm
ipe Data Plpe Pipe Pip" IRWR ALTERNATE INLET LOCATION TLAT LNELOAO SURcxumE PTF
LoeaUm 8W TYP" EMvMbn E Leo ToeauBLaA:ER
InMt - ET
wnomrs.wuLe. Nsas.ax Fouxmno
Ouee1 ��� a REsslvsa
Notes: INLET I _ sTasnmx. s.aao EiMNeDu.
�' > aDxronuw.nEw+..sTxce+vAms.G"ADE
PERFORMANCE SPECIFICAWMS cE—C.A.I.— aLUEANNUCARACOY
TreaUnent Flow Ca c xws s
NJDEP SO% Removal, ]5 m'Krm O.OW de t� OUTLET I s
WA Ecology GULD-Basic, 0.05]ds —J
EnXan bP — — c. ACI s+eN
ByPMFCBPRSy SA da
rsapr saL ALTERNATE OUTLET LOCATION l DNIDER WALL 'l. TIE
01Y RCPAULK OUTLET
PLAN VIEW REY�Ew.
CVITGNE
AN
—I PER
'K 018' TRAFFIC RATED CAST IRON COVERS. OW BOLTED B GASKETED ACCESS COVER. + iR
FIELD POURED CONCRETE COLLAR REQUIRED, FIELD POURED CONCRETE COLLAR REWIRED.
TY
BY OTHERS. BY OTHERS. eoxsT"Anrts nITYAew PRODueTKN FAe"
RIM
O'MIN TO
• "wassws:IR.o VGEwuLlrocKa MED
_ _ 5 E NOTE 1ER
rwMeNEDWMnN,DF a.SE NDLDPES
(SEE NOTE I.B) +
WI
VARIESI wML. aYPasewR"nxoovI—GRAIN
I
5'-1-1I0-MIN
13'-10' MAX I I ENERGY DISSIPATION STONE
-- RL
MULCN
y 3iC-
ER
DIVIDER WALL r�, I I 1'-0' OIdemm*hkeBbl,Ck
_ BYPASS WEIR I I SIOlmM#"' MEDIA
—' OUTLET O S' DRAIN ROCK
�B'NPaB"'NINtl@, S,a : w:(—GARD
OPTIONPL DRAIN 1'-10' 6 1'-10' 1'-S' UNDERDRAIN PIPE UMNgmulMVaultwM lrvema BryNs
DOWN DEVICE
�I� w
LEFT END VIEW ELEVATION VIEW
BPUaBIB""n9 of
INLET WINDOW
I I
INLET _"�
II H U
I I I
Y-Y I28T DROP
RECOMMENDED, 8' MIN.
aIST
I I
PRELIMINARY
NOT FOR CONSTRUCTION
01/2022
AS -BUILT CERTIFICATION:
I HEREBY DECLARE THAT THE HORIZONTAL AND
VERTICAL LOCATIONS OF THE STORM DRAINAGE AND
ROAD SYSTEM SHOWN HEREIN IS THE RESULT OF A
FIELD SURVEY PERFORMED BY ME OR UNDER MY
DIRECTION.
NAME L.S.# DATE
PERMIT NO. XX-XXXXXX-XX
CITY OF FEDERAL WAY
AS -BUILT
DATE
NOTE:
THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER
APPROVAL DATE. THE CITY WILL NOT BE
RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON
THESE PLANS.
FIELD CONDITIONS MAY DICTATE CHANGES TO THESE
PLANS AS DETERMINED BY THE CITY ENGINEER.
I PERMIT NO. XX-XXXXXX-XX I
APPROVED
DATE
Q
J
NQ
EIIr
LU
0 N o
w 'a 0 <
IRL Q
QW.
n Q
W W It
W
LL
I-
0
0
�LL
MV
W
C7 o WE
D Lug
Q3
z = W H3
Z ox HW
LLI O
W o v�
z +
Z
W Q @ LLn
O wti
V x CV
.1JHITE OR
WASMC�AlA�
de
Y 11
f S�ONALE ENT'
DESIGNED KWO
CHECKED KWO
DRAWN NAS
CHECKED KWO
AS -BUILT
JOB NO.
21-021
V/ 01/2022
J
Q DRAWING NAME
C12
Q 12 OF 12
Appendix E - Operations and Maintenance Manual
Technical Information Report
Davis BigFoot Java Federal Way
KWO Engineering, PLLC
January 2022
Stormwater
Operations &Maintenance Manual
Davis BigFoot Java Federal Way
803 S 348th St, Federal Way, Washington
Project Owner:
Steve Davis
6124 Panorama Dr E
Tacoma, WA 98422
253.606.5586
Prepared by:
Kristen Orndorff, PE
KWO Engineering, PLLC
4505 91' Ave SE
Mercer Island, WA 98040
kristen@kwoeng.onmicrosoft.com
206.755.3951
January 21, 2022
Narrative
The project is located at 803 S 348t" St, Burien, WA 98003 and encompasses one King County
parcel: 2021049087. The proposed development consists of a new dual drive-thru coffee stand
and associated drive aisles, parking, walkways, landscaping, lighting, utilities, signage, and trash
enclosure.
The storm system will be privately maintained by the property owner whose contact person,
address and phone number are listed on the cover page of this report. This Operations &
Maintenance Manual is to be kept at the owner's office and made available to the City for
inspection upon request. The new onsite storm system consists of the following components
that will require regular inspection and maintenance:
• Detention Tank
• Control Structure/Flow Restrictor
• Catch Basins and Manholes
• Conveyance Pipes
• Grounds (Landscaping)
• BioPod Biofilter Underground Vault
Detailed requirements for inspection and maintenance for each storm system component are
included in the following pages. Manufacturer's recommendations should be followed for proper
operation and maintenance. The facility -specific maintenance standards contained in this report
are intended to be conditions for determining if maintenance actions are required as identified
through inspection. They are not intended to be measures of the facilities' required condition at
all times between inspections. However, based upon inspection observations, the inspection and
maintenance schedules shall be adjusted to minimize the length of time that a facility is in a
condition that required a maintenance action.
Operations & Maintenance Manual KWO Engineering, PLLC
Davis BigFoot Java Federal Way January 2022
Maintenance Log (Sample)
Instructions: The following pages contain maintenance needs for the storm drainage system at
Davis BigFoot Java Federal Way. Ignore any requirements that do not apply. Complete a checklist
and log for all system components at least annually (preferably in September) and after any major
storm event. Add notes on problems found and actions taken. Keep each report in your files.
Inspection Period:
Inspection Date:
Sheets Attached:
Name of Inspector:
Inspector's Signature:
Summary/Recommendations:
Operations & Maintenance Manual
Davis BigFoot Java Federal Way
KWO Engineering, PLLC
January 2022
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO.3 - DETENTION TANKS AND VAULTS
Maintenance
Defect or Problem
Conditions When Maintenance is Needed
Results Expected When
Component
Maintenance is Performed
Site
Trash and debris
Any trash and debris which exceed 1 cubic foot
Trash and debris cleared from site.
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds
Any noxious or nuisance vegetation which may
Noxious and nuisance vegetation
constitute a hazard to County personnel or the
removed according to applicable
public.
regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and
Any evidence of contaminants or pollution such
Materials removed and disposed of
pollution
as oil, gasoline, concrete slurries or paint.
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover
Grass or groundcover exceeds 18 inches in
Grass or groundcover mowed to a
height.
height no greater than 6 inches.
Tank or Vault
Trash and debris
Any trash and debris accumulated in vault or
No trash or debris in vault.
Storage Area
tank (includes floatables and non-floatables).
Sediment
Accumulated sediment depth exceeds 10% of
All sediment removed from storage
accumulation
the diameter of the storage area for''/z length of
area.
storage vault or any point depth exceeds 15% of
diameter. Example: 72-inch storage tank would
require cleaning when sediment reaches depth of
7 inches for more than'/z length of tank.
Tank Structure
Plugged air vent
Any blockage of the vent.
Tank or vault freely vents.
Tank bent out of
Any part of tank/pipe is bent out of shape more
Tank repaired or replaced to design.
shape
than 10% of its design shape.
Gaps between
A gap wider than '/z-inch at the joint of any tank
No water or soil entering tank
sections, damaged
sections or any evidence of soil particles entering
through joints or walls.
joints or cracks or
the tank at a joint or through a wall.
tears in wall
Vault Structure
Damage to wall,
Cracks wider than '/z-inch, any evidence of soil
Vault is sealed and structurally
frame, bottom, and/or
entering the structure through cracks or qualified
sound.
top slab
inspection personnel determines that the vault is
not structurally sound.
Inlet/Outlet Pipes
Sediment
Sediment filling 20% or more of the pipe.
Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris
Trash and debris accumulated in inlet/outlet
No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged
Cracks wider than''/z-inch at the joint of the
No cracks more than'/, -inch wide at
inlet/outlet pipes or any evidence of soil entering
the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
2016 Surface Water Design Manual — Appendix A 4/24/2016
A-5
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO.3 - DETENTION TANKS AND VAULTS
Maintenance
Defect or Problem
Conditions When Maintenance is Needed
Results Expected When
Component
Maintenance is Performed
Access Manhole
Cover/lid not in place
Cover/lid is missing or only partially in place.
Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism
Mechanism cannot be opened by one
Mechanism opens with proper tools.
not working
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to
One maintenance person cannot remove
Cover/lid can be removed and
remove
cover/lid after applying 80 Ibs of lift.
reinstalled by one maintenance
person.
Ladder rungs unsafe
Missing rungs, misalignment, rust, or cracks.
Ladder meets design standards.
Allows maintenance person safe
access.
Large access
Damaged or difficult
Large access doors or plates cannot be
Replace or repair access door so it
doors/plate
to open
opened/removed using normal equipment.
can opened as designed.
Gaps, doesn't cover
Large access doors not flat and/or access
Doors close flat; covers access
completely
opening not completely covered.
opening completely.
Lifting Rings missing,
Lifting rings not capable of lifting weight of door
Lifting rings sufficient to lift or
rusted
or plate.
remove door or plate.
4/24/2016 2016 Surface Water Design Manual — Appendix A
A-6
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO.4 - CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance
Defect or Problem
Condition When Maintenance is Needed
Results Expected When
Component
Maintenance is Performed
Structure
Trash and debris
Trash or debris of more than'% cubic foot which
No Trash or debris blocking or
is located immediately in front of the structure
potentially blocking entrance to
opening or is blocking capacity of the structure
structure.
by more than 10%.
Trash or debris in the structure that exceeds 1/3
No trash or debris in the structure.
the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Deposits of garbage exceeding 1 cubic foot in
No condition present which would
volume.
attract or support the breeding of
insects or rodents.
Sediment
Sediment exceeds 60% of the depth from the
Sump of structure contains no
bottom of the structure to the invert of the lowest
sediment.
pipe into or out of the structure or the bottom of
the FROP-T section or is within 6 inches of the
invert of the lowest pipe into or out of the
structure or the bottom of the FROP-T section.
Damage to frame
Corner of frame extends more than 3% inch past
Frame is even with curb.
and/or top slab
curb face into the street (If applicable).
Top slab has holes larger than 2 square inches
Top slab is free of holes and cracks.
or cracks wider than '/4 inch.
Frame not sitting flush on top slab, i.e.,
Frame is sitting flush on top slab.
separation of more than % inch of the frame from
the top slab.
Cracks in walls or
Cracks wider than '/z inch and longer than 3 feet,
Structure is sealed and structurally
bottom
any evidence of soil particles entering structure
sound.
through cracks, or maintenance person judges
that structure is unsound.
Cracks wider than '/z inch and longer than 1 foot
No cracks more than 1/4 inch wide at
at the joint of any inlet/outlet pipe or any
the joint of inlet/outlet pipe.
evidence of soil particles entering structure
through cracks.
Settlement/
Structure has settled more than 1 inch or has
Basin replaced or repaired to design
misalignment
rotated more than 2 inches out of alignment.
standards.
Damaged pipe joints
Cracks wider than '/z-inch at the joint of the
No cracks more than'/4-inch wide at
inlet/outlet pipes or any evidence of soil entering
the joint of inlet/outlet pipes.
the structure at the joint of the inlet/outlet pipes.
Contaminants and
Any evidence of contaminants or pollution such
Materials removed and disposed of
pollution
as oil, gasoline, concrete slurries or paint.
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Ladder rungs missing
Ladder is unsafe due to missing rungs,
Ladder meets design standards and
or unsafe
misalignment, rust, cracks, or sharp edges.
allows maintenance person safe
access.
FROP-T Section
Damage
T section is not securely attached to structure
T section securely attached to wall
wall and outlet pipe structure should support at
and outlet pipe.
least 1,000 Ibs of up or down pressure.
Structure is not in upright position (allow up to
Structure in correct position.
10% from plumb).
Connections to outlet pipe are not watertight or
Connections to outlet pipe are water
show signs of deteriorated grout.
tight; structure repaired or replaced
and works as designed.
Any holes —other than designed holes —in the
Structure has no holes other than
structure.
designed holes.
2016 Surface Water Design Manual — Appendix A 4/24/2016
A-7
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO.4 - CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance
Defect or Problem
Condition When Maintenance is Needed
Results Expected When
Component
Maintenance is Performed
Cleanout Gate
Damaged or missing
Cleanout gate is missing.
Replace cleanout gate.
Cleanout gate is not watertight.
Gate is watertight and works as
designed.
Gate cannot be moved up and down by one
Gate moves up and down easily and
maintenance person.
is watertight.
Chain/rod leading to gate is missing or damaged.
Chain is in place and works as
designed.
Orifice Plate
Damaged or missing
Control device is not working properly due to
Plate is in place and works as
missing, out of place, or bent orifice plate.
designed.
Obstructions
Any trash, debris, sediment, or vegetation
Plate is free of all obstructions and
blocking the plate.
works as designed.
Overflow Pipe
Obstructions
Any trash or debris blocking (or having the
Pipe is free of all obstructions and
potential of blocking) the overflow pipe.
works as designed.
Deformed or
Lip of overflow pipe is bent or deformed.
Overflow pipe does not allow
damaged lip
overflow at an elevation lower than
design
Inlet/Outlet Pipe
Sediment
Sediment filling 20% or more of the pipe.
Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris
Trash and debris accumulated in inlet/outlet
No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged
Cracks wider than''/z-inch at the joint of the
No cracks more than'/, -inch wide at
inlet/outlet pipes or any evidence of soil entering
the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
Metal Grates
Unsafe grate opening
Grate with opening wider than 7/8 inch.
Grate opening meets design
(If Applicable)
standards.
Trash and debris
Trash and debris that is blocking more than 20%
Grate free of trash and debris.
of grate surface.
footnote to guidelines for disposal
Damaged or missing
Grate missing or broken member(s) of the grate.
Grate is in place and meets design
standards.
Manhole Cover/Lid
Cover/lid not in place
Cover/lid is missing or only partially in place.
Cover/lid protects opening to
Any open structure requires urgent
structure.
maintenance.
Locking mechanism
Mechanism cannot be opened by one
Mechanism opens with proper tools.
Not Working
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to
One maintenance person cannot remove
Cover/lid can be removed and
Remove
cover/lid after applying 80 lbs. of lift.
reinstalled by one maintenance
person.
4/24/2016 2016 Surface Water Design Manual — Appendix A
A-8
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO.5 - CATCH BASINS AND MANHOLES
Maintenance
Defect or Problem
Condition When Maintenance is Needed
Results Expected When
Component
Maintenance is Performed
Structure
Sediment
Sediment exceeds 60% of the depth from the
Sump of catch basin contains no
bottom of the catch basin to the invert of the
sediment.
lowest pipe into or out of the catch basin or is
within 6 inches of the invert of the lowest pipe
into or out of the catch basin.
Trash and debris
Trash or debris of more than Y-i cubic foot which
No Trash or debris blocking or
is located immediately in front of the catch basin
potentially blocking entrance to
opening or is blocking capacity of the catch basin
catch basin.
by more than 10%.
Trash or debris in the catch basin that exceeds
No trash or debris in the catch
1/3 the depth from the bottom of basin to invert
basin.
the lowest pipe into or out of the basin.
Dead animals or vegetation that could generate
No dead animals or vegetation
odors that could cause complaints or dangerous
present within catch basin.
gases (e.g., methane).
Deposits of garbage exceeding 1 cubic foot in
No condition present which would
volume.
attract or support the breeding of
insects or rodents.
Damage to frame
Corner of frame extends more than % inch past
Frame is even with curb.
and/or top slab
curb face into the street (If applicable).
Top slab has holes larger than 2 square inches
Top slab is free of holes and cracks.
or cracks wider than '/4 inch.
Frame not sitting flush on top slab, i.e.,
Frame is sitting flush on top slab.
separation of more than % inch of the frame from
the top slab.
Cracks in walls or
Cracks wider than '/z inch and longer than 3 feet,
Catch basin is sealed and is
bottom
any evidence of soil particles entering catch
structurally sound.
basin through cracks, or maintenance person
judges that catch basin is unsound.
Cracks wider than '/z inch and longer than 1 foot
No cracks more than inch wide at
at the joint of any inlet/outlet pipe or any
the joint of inlet/outlet pipe.
evidence of soil particles entering catch basin
through cracks.
Settlement/
Catch basin has settled more than 1 inch or has
Basin replaced or repaired to design
misalignment
rotated more than 2 inches out of alignment.
standards.
Damaged pipe joints
Cracks wider than '/z-inch at the joint of the
No cracks more than'/4-inch wide at
inlet/outlet pipes or any evidence of soil entering
the joint of inlet/outlet pipes.
the catch basin at the joint of the inlet/outlet
pipes.
Contaminants and
Any evidence of contaminants or pollution such
Materials removed and disposed of
pollution
as oil, gasoline, concrete slurries or paint.
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Inlet/Outlet Pipe
Sediment
Sediment filling 20% or more of the pipe.
Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris
Trash and debris accumulated in inlet/outlet
No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged
Cracks wider than''/z-inch at the joint of the
No cracks more than'/4-inch wide at
inlet/outlet pipes or any evidence of soil entering
the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
2016 Surface Water Design Manual — Appendix A 4/24/2016
A-9
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 5 - CATCH BASINS AND MANHOLES
Maintenance
Defect or Problem
Condition When Maintenance is Needed
Results Expected When
Component
Maintenance is Performed
Metal Grates
Unsafe grate opening
Grate with opening wider than 7/8inch.
Grate opening meets design
(Catch Basins)
standards.
Trash and debris
Trash and debris that is blocking more than 20%
Grate free of trash and debris.
of grate surface.
footnote to guidelines for disposal
Damaged or missing
Grate missing or broken member(s) of the grate.
Grate is in place and meets design
Any open structure requires urgent
standards.
maintenance.
Manhole Cover/Lid
Cover/lid not in place
Cover/lid is missing or only partially in place.
Cover/lid protects opening to
Any open structure requires urgent
structure.
maintenance.
Locking mechanism
Mechanism cannot be opened by one
Mechanism opens with proper tools.
Not Working
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to
One maintenance person cannot remove
Cover/lid can be removed and
Remove
cover/lid after applying 80 lbs. of lift.
reinstalled by one maintenance
person.
4/24/2016 2016 Surface Water Design Manual — Appendix A
A-10
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 6 - CONVEYANCE PIPES AND DITCHES
Maintenance
Defect or Problem
Conditions When Maintenance is Needed
Results Expected When
Component
Maintenance is Performed
Pipes
Sediment & debris
Accumulated sediment or debris that exceeds
Water flows freely through pipes.
accumulation
20% of the diameter of the pipe.
Vegetation/roots
Vegetation/roots that reduce free movement of
Water flows freely through pipes.
water through pipes.
Contaminants and
Any evidence of contaminants or pollution such
Materials removed and disposed of
pollution
as oil, gasoline, concrete slurries or paint.
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damage to protective
Protective coating is damaged; rust or corrosion
Pipe repaired or replaced.
coating or corrosion
is weakening the structural integrity of any part of
pipe.
Damaged
Any dent that decreases the cross section area
Pipe repaired or replaced.
of pipe by more than 20% or is determined to
have weakened structural integrity of the pipe.
Ditches
Trash and debris
Trash and debris exceeds 1 cubic foot per 1,000
Trash and debris cleared from
square feet of ditch and slopes.
ditches.
Sediment
Accumulated sediment that exceeds 20% of the
Ditch cleaned/flushed of all
accumulation
design depth.
sediment and debris so that it
matches design.
Noxious weeds
Any noxious or nuisance vegetation which may
Noxious and nuisance vegetation
constitute a hazard to County personnel or the
removed according to applicable
public.
regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and
Any evidence of contaminants or pollution such
Materials removed and disposed of
pollution
as oil, gasoline, concrete slurries or paint.
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vegetation
Vegetation that reduces free movement of water
Water flows freely through ditches.
through ditches.
Erosion damage to
Any erosion observed on a ditch slope.
Slopes are not eroding.
slopes
Rock lining out of
One layer or less of rock exists above native soil
Replace rocks to design standards.
place or missing (If
area 5 square feet or more, any exposed native
Applicable)
soil.
2016 Surface Water Design Manual — Appendix A 4/24/2016
A-11
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 11 -GROUNDS (LANDSCAPING)
Maintenance
Defect or Problem
Conditions When Maintenance is Needed
Results Expected When
Component
Maintenance is Performed
Site
Trash or litter
Any trash and debris which exceed 1 cubic foot
Trash and debris cleared from site.
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds
Any noxious or nuisance vegetation which may
Noxious and nuisance vegetation
constitute a hazard to County personnel or the
removed according to applicable
public.
regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and
Any evidence of contaminants or pollution such
Materials removed and disposed of
pollution
as oil, gasoline, concrete slurries or paint.
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover
Grass or groundcover exceeds 18 inches in
Grass or groundcover mowed to a
height.
height no greater than 6 inches.
Trees and Shrubs
Hazard
Any tree or limb of a tree identified as having a
No hazard trees in facility.
potential to fall and cause property damage or
threaten human life. A hazard tree identified by
a qualified arborist must be removed as soon
as possible.
Damaged
Limbs or parts of trees or shrubs that are split or
Trees and shrubs with less than 5%
broken which affect more than 25% of the total
of total foliage with split or broken
foliage of the tree or shrub.
limbs.
Trees or shrubs that have been blown down or
No blown down vegetation or
knocked over.
knocked over vegetation. Trees or
shrubs free of injury.
Trees or shrubs which are not adequately
Tree or shrub in place and
supported or are leaning over, causing exposure
adequately supported; dead or
of the roots.
diseased trees removed.
4/24/2016 2016 Surface Water Design Manual — Appendix A
A-16
Oldcastle Infrastructure' INSPECTION AND MAINTENANCE GUIDE
0 A CRH COMPANY
BioPod"' Biofilter with StormMix"' Biofiltration Media
Description
The BioPodTm Biofilter System (BioPod) is a stormwater biofiltration treatment system used to remove pollutants
from stormwater runoff. Impervious surfaces and other urban and suburban landscapes generate a variety of
contaminants that can enter stormwater and pollute downstream receiving waters unless treatment is provided.
The BioPod system uses proprietary StormMixTM biofiltration media to capture and retain pollutants including
total suspended solids (TSS), metals, nutrients, gross solids, trash and debris as well as petroleum hydrocarbons.
Function
The BioPod system uses engineered, high -flow rate filter media to remove stormwater pollutants, allowing for a
smaller footprint than conventional bioretention systems. Contained within a compact precast concrete vault, the
BioPod system consists of a biofiltration chamber and an optional integrated high -flow bypass with a contoured
inlet rack to minimize scour. The biofiltration chamber is filled with horizontal layers of aggregate (which may or
may not include an underdrain), biofiltration media and mulch. Stormwater passes vertically down through the
mulch and biofiltration media for treatment. The mulch provides pretreatment by retaining most of the solids or
sediment. The biofiltration media provides further treatment by retaining finer sediment and dissolved pollutants.
The aggregate allows the media bed to drain evenly for discharge through an underdrain pipe or by infiltration.
Configuration
The BioPod system can be configured with either an internal or external bypass. The internal bypass allows both
water quality and bypass flows to enter the treatment vault. The water quality flows are directed to the biofiltration
chamber while the excess flows are diverted over the bypass weir without entering the biofiltration chamber. Both
the treatment and bypass flows are combined in the outlet area prior to discharge from the structure. BioPod
units without an internal bypass are designed such that only treatment flows enter the treatment structure. When
the system has exceeded its treatment capacity, ponding will force bypass flows to continue down the gutter to
the nearest standard catch basin or other external bypass structure.
The BioPod system can be configured as a tree box filter with tree and grated inlet, as a planter box filter with
shrubs, grasses and an open top, or as an underground filter with access risers, doors and a subsurface inlet
pipe. The optional internal bypass may be incorporated with any of these configurations. In addition, an open
bottom configuration may be used to promote infiltration and groundwater recharge. The configuration and size
of the BioPod system is designed to meet the requirements of a specific project.
Inspection & Maintenance Overview
State and local regulations require all stormwater management systems to be inspected on a regular basis and
maintained as necessaryto ensure performance and protect downstream receiving waters. Without maintenance,
excessive pollutant buildup can limit system performance by reducing the operating capacity of the system and
increasing the potential for scouring of pollutants during periods of high flow.
Some configurations of the BioPod may require periodic irrigation to establish and maintain vegetation. Vegetation
will typically become established about two years after planting. Irrigation requirements are ultimately dependent
on climate, rainfall and the type of vegetation selected.
2
Maintenance Frequency
Periodic inspection is essential for consistent system performance and is easily completed. Inspection is
typically conducted a minimum of twice per year, but since pollutant transport and deposition varies from site to
site, a site -specific maintenance frequency should be established during the first two or three years of operation.
Inspection Equipment
The following equipment is helpful when conducting BioPod inspections:
• Recording device (pen and paper form, voice recorder, iPad, etc.)
• Suitable clothing (appropriate footwear, gloves, hardhat, safety glasses, etc.)
• Traffic control equipment (cones, barricades, signage, flagging, etc.)
• Manhole hook or pry bar
• Flashlight
• Tape measure
Inspection Procedures
BioPod inspections are visual and are conducted without entering the unit. To complete an inspection, safety
measures including traffic control should be deployed before the access covers or tree grates are removed. Once
the covers have been removed, the following items should be checked and recorded (see form provided on page 6)
to determine whether maintenance is required:
• If the BioPod unit is equipped with an internal bypass, inspect the contoured inlet rack and outlet chamber
and note whether there are any broken or missing parts. In the unlikely event that internal parts are broken
or missing, contact Oldcastle Stormwater at (800) 579-8819 to determine appropriate corrective action.
• Note whether the curb inlet, inlet pipe, or - if the unit is equipped with an internal bypass - the inlet rack is
blocked or obstructed.
• If the unit is equipped with an internal bypass, observe, quantify and record the accumulation of trash
and debris in the inlet rack. The significance of accumulated trash and debris is a matter of judgment.
Often, much of the trash and debris may be removed manually at the time of inspection if a separate
maintenance visit is not yet warranted.
• If it has not rained within the past 24 hours, note whether standing water is observed in the biofiltration
chamber.
• Finally, observe, quantify and record presence of invasive vegetation and the amount of trash and debris
and sediment load in the biofiltration chamber. Erosion of the mulch and biofiltration media bed should
also be recorded. Sediment load may be rated light, medium or heavy depending on the conditions.
Loading characteristics may be determined as follows:
o Light sediment load - sediment is difficult to distinguish among the mulch fibers at the top of the
mulch layer; the mulch appears almost new.
o Medium sediment load - sediment accumulation is apparent and may be concentrated in some areas;
probing the mulch layer reveals lighter sediment loads under the top 1" of mulch.
o Heavy sediment load - sediment is readily apparent across the entire top of the mulch layer; individual
mulch fibers are difficult to distinguish; probing the mulch layer reveals heavy sediment load under the
top 1" of mulch.
Often, much of the invasive vegetation and trash and debris may be removed manually at the time of inspection
if a separate maintenance visit is not yet warranted.
Maintenance Indicators
Maintenance should be scheduled if any of the following conditions are identified during inspection:
• The concrete structure is damaged or the tree grate or access cover is damaged or missing.
• The curb inlet or inlet rack is obstructed.
• Standing water is observed in the biofiltration chamber more than 24 hours after a rainfall event (use
discretion if the BioPod is located downstream of a storage system that attenuates flow).
• Trash and debris in the inlet rack cannot be easily removed at the time of inspection.
• Trash and debris, invasive vegetation or sediment load in the biofiltration chamber is heavy or excessive
erosion has occurred.
Maintenance Equipment
The following equipment is helpful when conducting BioPod maintenance:
• Suitable clothing (appropriate footwear, gloves, hardhat, safety glasses, etc.)
• Traffic control equipment (cones, barricades, signage, flagging, etc.)
• Manhole hook or pry bar
• Flashlight
• Tape measure
• Rake, hoe, shovel and broom
• Bucket
• Pruners
• Vacuum truck (optional)
Maintenance Procedures
Maintenance should be conducted during dry weather when no flows are entering the system. All maintenance
may be conducted without entering the BioPod structure. Once safety measures such as traffic control are
deployed, the access covers may be removed and the following activities may be conducted to complete
maintenance:
• Remove all trash and debris from the curb inlet and inlet rack manually or by using a vacuum truck as
required.
• Remove all trash and debris and invasive vegetation from the biofiltration chamber manually or by using a
vacuum truck as required.
• If the sediment load is medium or light but erosion of the biofiltration media bed is evident, redistribute
the mulch with a rake or replace missing mulch as appropriate. If erosion persists, rocks may be placed in
the eroded area to help dissipate energy and prevent recurring erosion.
• If the sediment load is heavy, remove the mulch layer using a hoe, rake, shovel and bucket, or by using a
vacuum truck as required. If the sediment load is particularly heavy, inspect the surface of the biofiltration
media once the mulch has been removed. If the media appears clogged with sediment, remove and
replace one or two inches of biofiltration media prior to replacing the mulch layer.
• Prune vegetation as appropriate and replace damaged or dead plants as required.
• Replace the tree grate and/or access covers and sweep the area around the BioPod to leave the site clean.
• All material removed from the BioPod during maintenance must be disposed of in accordance with local
environmental regulations. In most cases, the material may be handled in the same manner as disposal
of material removed from sumped catch basins or manholes.
4
Natural, shredded hardwood mulch should be used in the BioPod. Timely replacement of the mulch layer
according to the maintenance indicators described above should protect the biofiltration media below the
mulch layer from clogging due to sediment accumulation. However, whenever the mulch is replaced, the
BioPod should be visited 24 hours after the next major storm event to ensure that there is no standing water
in the biofiltration chamber. Standing water indicates that the biofiltration media below the mulch layer is
clogged and must be replaced. Please contact Oldcastle Infrastructure at (800) 579-8819 to purchase the
proprietary StormMiXW biofiltration media.
BioPod Tree Module
BioPod Media Module
BioPod Planter Module BioPod Media Vault
BioPod Model
Inspection Date
Location
Condition of Internal Components Notes:
❑ Good ❑ Damaged ❑ Missing
Curb Inlet or Inlet Rack Blocked
Notes:
❑ Yes ❑ No
Standing Water in Biofiltration Chamber
Notes:
❑ Yes ❑ No
Trash and Debris in Inlet Rack
Notes:
❑ Yes ❑ No
Trash and Debris in Biofiltration Chamber
Notes:
❑ Yes ❑ No
Invasive Vegetation in Biofiltration Chamber
Notes:
❑ Yes ❑ No
Sediment in Biofiltration Chamber
Notes:
❑ Light ❑ Medium ❑ Heavy
Erosion in Biofiltration Chamber
Notes:
❑ Yes ❑ No
Maintenance Requirements
❑ Yes - Schedule Maintenance 71 No - Schedule
Re -Inspection