Loading...
NOA_WSDOT SR 167 1b_FINAL_012721FIFE Fife City Hall www'cityoffife.org 5411 23rd Street E. Fife, WA 98424 WAS H I NGTON Tel (253) 922-9625 Fax (253) 922-5355 CITY OF FIFE, WASHINGTON NOTICE OF APPLICATION (Shoreline Conditional Use Permit) Application Submittal 11/25/2020 Date: Completeness Determination 01/11/2021 Date: Notice of Application 01/27/2021 Date: Project Name: WSDOT SR 167/1-5 to SR 509 — New Expressway (Stage 1 b) Project Project Applicant: Herrera Environmental Consultants Christina Merten 2200 6th Ave Ste 1100 Seattle, WA 98121 Description of The Washington State Department of Transportation (WSDOT), Puget Sound Proposal: Gateway Program, is hereby submitting application for a Shoreline Conditional Use Permit for the subject project. The project will construct a new State Route (SR) 509 Spur alignment between SR 509 and Interstate 5 (1-5) and a new portion of SR 167 alignment between 1-5 and 20th Street East, and associated riparian restoration and wetland mitigation within the cities of Tacoma, Fife, Milton, Edgewood, and Unincorporated Pierce County, Washington. Comments can be emailed to clarson (a)_cityoffife.org or delivered to City Hall. The application and associated documents listed below can be viewed on the City of Fife's public portal at https1/ci-fife- wa.smartgovcommunity.com/Public/Home by navigating to "Public Notice" section. Location of Proposal: See map insert. Case No. SLCUP20-0001 Lead Agency: City of Fife FIFE WASHING TON Fife City Hall www'cityoffife.org 5411 23rd Street E. Fife, WA 98424 Tel (253) 922-9625 Fax (253) 922-5355 Existing Environmental Documents that Evaluate the Proposed Project: SEPA Re-evaluation Form JARPA Application JARPA Permit Drawing Wetland and Stream Assessment Report — SR 167 Completion Project, Phase 1 a Wetland and Stream Assessment Report — SR 167 Completion Project, Phase 1 b SR 167 Completion Project, Stage 1 b: SR 167/1-5 to SR 509 — New Expressway Project Final DRAFT Stage 1 b Mitigation Plan Technical Memorandum: SR 167/1-5 to SR 509 — New Expressway Project Floodplain Impacts and Mitigation in the City of Fife SR 167 JARPA Impact map by jurisdiction City of Fife Master Application The above listed documents can be viewed in the "Public Notice" section of the City's Public Portal at https://ci-fife-wa.smartgovcommunity.com/Public/Home by searching for permit SLCUP20-0001. Other Permits not included in the Application: Civil, utility, building and other discretionary permits for the construction of the project. This permit application covers the shoreline and critical areas review. City staff has preliminarily determined that the proposed use appears to be consistent with the zoning district (Title 19). Other regulations for project mitigation include, but are not limited to, Zoning (Title 19), Critical Areas (Title 17), Buildings and Construction (Title 15), and Low Impact Development (Title 21). Public Hearing: A public hearing is required for this decision, but has not yet be scheduled. Once the public hearing is scheduled, notice will be provided in the same manner as this notice of application. All citizens who provide comment will also receive a notice of public hearing. Comment Period: Agencies, tribes, and the public are encouraged to review and comment on the proposed project. You may also request notification of any hearings, a copy of the decision once made and information about appeal rights. Submit written comments or requests to the City of Fife, Attn: Chris Larson, 5411 23rd Street East, Fife, WA 98424 or email at clarson cityoffife.org. The public comment period on this Notice of Application is fourteen days (14) days. Comments must be received by 5:00 pm on February 10th, 2021. This document constitutes notice of pending action according to the Tribal Agreement of 1989. l &191611 MFGA PROGRAMS °F TR.NSPOATATION MILES 0 1111 40 EJECT LOCATION "h si,9Pv oe 9� TA OMA 0 1400 2800 PROJECT LIMIT SCALE IN FEET sRso9 MP 3.s8 s yY � TACOMA RA/[ PROJECT LIMIT SR509 MP 1.48 o �I LEGEND T.20N. W.M. R.3E. & RAE. CITY OF FIFE TRIBAL rc h TRUST I'll IT PROJECT LIMIT r"r FIFE � I-5 MP 137.85 — 167 Il� JLIl� lla ' Rr oti�o _ O STAGE lb GROUND DISTURBANCE LIMITS EXISTING FEATURES NEW ROADWAY FEATURES NEW STREAM CENTERLINE NEW RRP MITIGATION AREA FUTURE ROADWAY CORRIDOR FED' hI��j1�� j111j111��I jj��jj�� J o�. ll' L-/ R-A y PROJECT NAME: SR 167, 1-5 TO SR 509 - NEW EXPRESSWAY (STAGE lb) PURPOSE: NEW CORRIDOR CONSTRUCTION REFERENCE: NWS-2020-864-DOT PROPOSED: ROADWAY, BRIDGES, TRAIL, RRP, STORMWATER APPLICANT: PUGET SOUND GATEWAY PROGRAM MAP LOCATION: CITIES OF FIFE, MILTON, EDGEWOOD, TACOMA COUNTY: PIERCE DATUM: NAD83, NAVD88 NEAR: WAPATO, FIFE DITCH Washington State ADJACENT PROPERTY OWNERS: VARIES WATER BODY: HYLEBOS, SURPRISE LAKE TRIB. Department Of Transportation DATE: SEPTEMBER 2020 SHEET: 1 OF: 94