Loading...
20-104475 - Permit FinalCity of Federal Way Community Development Dept,. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MIRROR LAKE HIGHLAND - COMMONS BUILDING Project Address: 31000 6TH LN SW Building - Commercial Permit #:20-104475-00-CO Inspection Request Line: (253) 835-3050 Parcel Number: 555790 TR-A Project Description: BLUEBEAM - Construction of a 560 square foot commons building for use by residents of the cottage housing development. Includes plumbing and mechanical. Owner Applicant Contractor Lender WILLIAM MCCAFFREYMIRROR WILLIAM MCCAFFREYTHE THE NEXUS STUDIO INC OWNER IS LENDER LAKE HIGHLAND LLC NEXUS STUDIO INC 30929 37TH PL SW 30929 37TH PL SW 30929 37TH PL SW FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 Census Category: 318 - New Amusement, Social and Recreational Building Includes: #1 #2 #3 #4 Occupancy Class: A-3 Construction Type: Type V - B Occupancy Load: 37.00 floor Area (sq. 11.) 560.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 560 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Basement .................... 0 New / Additional Sq. Feet - Deck ................. 0 Mechanical to be Included? ..................................... Yes Mechanical Work Valuation? ................................. 4000 New / Additional Sq. Feet - Other_-. ................... 0 Permit for Building Shell Only? ............................. No New / Additional Sq. Feet - Total ........................... 560 Occupancy 41 - Use ................................................ Community Hall Zoning Designation .................................... Total Valuation: 72,116.80 Fans Hot Water Tanks Bathtubs Lavatories Water Closets RS 7.2 New / Additional Sq. Feet - 2nd Floor .................... 0 Occupancy #1 - Area (Sq. Feet)., ............ . 560 Occupancy # 1 - Construction Type ......................... Type V - B New / Additional Sq. Feet - Garage ........................ 0 Plumbing Work Valuation? ..................................... 5000 Number of Stories ................................................... I Is this an Online or O.T.C. application? .................. No Plumbing to be Included?..... .... . ... ....................... .. Yes Will Certificate of Occupancy be Issued? ............... Yes Comprehensive Plan Designation ........................... SF - High -Density Residential Mechanical Fixtures Gas Piping 1 Plumbing Fixtures 1 Dishwashers 3 Showers 2 Hose Bibbs CONDITIONS: 1 Gas Pipe Outlets 1 Laundry Washer Outlets 1 Sinks 2 3 Fire sprinklers are required due to fire flow. If fire sprinklers are not desired, I strongly recommend contacting Lakehaven Water and Sewer for a hydraulic model report that shows the available fire flow exceeds 1500 gallons per minute. PERMIT EXPIRES Tuesday, 3 August, 2021 Permit Issued on Thursday, February 4, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washin ton and the City of Federal Way. Owner or agent: Date: City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by Citystaff. Tenant Name: MIRROR LAKE HIGHLAND - COMMONS BUIL Address: 31000 6TH LN SW Includes: #1 #2 #3 Occupancy Class: A-3 Construction Type: Type V - B Occupancy Load: 37.00 Floor Area (sq. ft.) 560.00 Owner Name: WILLIAM MCCAFFREYMIRROR LAI Owner Address: 30929 37TH PL SW FEDERAL WAY WA 98023 �W 'M Building Official Permit # 20-104475-00-CO #4 flW Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/ occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises. CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 104475 00 Address: 31000 6TH LN SW Project: WILLIAM J MCCAFFREY FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSETHIS IIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Footings/Setback (4110) ® Foundation Wall (4115) 0 Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date By Date By Date El Re -steel (4215) E] Plumbing Groundwork (4190) 0 Slab/Concrete Floor (4255) Approved to place concrete or grout Approved to cover Approved to place concrete By Date By Date By Date E] Underfloor Framing (4285) Floor Sheathing (4105) ® Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date I" Roof Sheathing (4220) Q Rough Plumbing (4230) E) Mechanical Rough -in (4165) Approved to install roofing Approved Approved By Date By Date By Date Gas Piping (4125) Fire/Draft Stops (4095) Prior to scheduling a Framing inspection; Approved to release test Approved and Electrical, Plumbing & Mechanical Rough -in j Fire/Draft Stop inspections must be signed - By Date By Date off and approved. IBC 109.3.4 Framing (4120) El Insulation (4150) E7 Gypsum Wallboard Nailing (4130) Approved to insulate Approved to install wallboard Approved to install mud & tape By Date By Date By Date Suspended Ceiling Grid (4265) D Final - S K F & R (4060) 0 Final - Planning Approved to drop tile Approved Approved By Date By Date By Date Final - Public Works (4080) 0 Final - Mechanical (4065) ® Final - Plumbing (4075) Approved Approved Approved By Date By Date By Date Q Final - Building (4050) Approved By Date } Rough Electrical Q Final Electrical Right of Way Approved Approved Approved By Date By Date By Date