Loading...
21-101516-SITE PLANGENERAL NOTES GENERAL NOTES, CONT. PROJECT DATA DRAWING INDEX FREIHEIT ARCHITECTURE GENERAL NOTES: I. ALL CONSTRUCTION SHALL COMPLY WITH THE 2015 INTERNATIONAL BUILDING CODE A5 ADOPTED BY THE CITY OF FEDERAL WAY, STATE RESULATIONS FOR BARRIER FREE DE516N, WA5HINSTON STATE ENERGY CODE, AND ALL APPLICABLE LOCAL CODES, ORDINANCES, AND STANDARDS. IN CASE OF ANY CONFLICT WHERE THE METHODS OR STANDARDS OF INSTALLATION OF THE MATERIALS SPECIFIED DO NOT EQUAL OR EXCEED THE REQUIREMENTS OF THE LAW5 OR ORDINANCES, THE LAW5 OR ORDINANCES SHALL GOVERN. NOTIFY THE ARCHITECT OF ALL CONFLICTS. 2. SECURE RELEVANT CITY AND STATE APPROVALS RELATING TO FIRE, CONSTRUCTION, LABOR, HEALTH AND LICEN51N6. CONTRACTOR SHALL FURTHER POST ALL BON05 AND SECURE ALL INSURANCE REQUIRED BY LAW OR CONTRACT, FORWARDING PROOF OF SUCH ACTIONS TO THE LANDLORD PRIOR TO COMMENCEMENT OF CONSTRUCTION. 3. PROVIDE ALL NECESSARY PERMITS AND FEES, WITH THE EXCEPTION OF THE BUILDING PERMIT, WHICH WILL BE PROVIDED BY THE OWNER. 4. WORK NOT INCLUDED IN TH15 CONTRACT SHALL BE MARKED "N.I.C." OR SPECIFICALLY A5516NED TO ANOTHER PARTY. 5. CONTRACTOR SHALL VISIT THE SITE, REVIEW THE DRAWIN65 AS SUBMITTED BY THE ARCHITECT, AND BECOME THOROUGHLY FAMILIAR WITH THE 51TE CONDITIONS PRIOR TO BIDDING OR CONSTRUCTION. 6. ALL WORK SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURERS LATEST RECOMMENDATIONS OR WRITTEN DIRECTIONS. 7. SUBMIT A L15T OF PROP05ED PRODUCT SUBMITTALS AND SHOP DRAWIN65 TO THE OWNER FOR APPROVAL PRIOR TO START OF CONSTRUCTION. 8. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, THE DETAILS SHALL BE THE SAME A5 FOR OTHER 51MILAR WORK. g. WHERE DEVICES OR ITEMS OR PARTS THEREOF ARE REFERRED TO IN SINGULAR, IT 15 INTENDED THAT SUCH SHALL APPLY TO AS MANY SUCH DEVICES, ITEMS OR PARTS AS ARE REQUIRED TO PROPERLY COMPLETE THE WORK. 10. VERIFY ALL "BUILDING 5TANDARD5" WITH BUILDING OWNER PRIOR TO BEGINNING ANY WORK. HOWEVER, THERE SHALL BE NO DEVIATIONS WHATSOEVER FROM THE CONTRACT DOCUMENTS WITHOUT THE ARCHITECT'S WRITTEN APPROVAL THEREOF. THE CONTRACTOR A6REE5 TO DEFEND, INDEMNIFY, AND HOLD THE ARCHITECT HARMLE55 FROM ANY CLAIMS ARISING AS A RESULT OF UNAPPROVED CHANSE5. 11. ALL PRODUCTS AND MATERIALS SPECIFIED IN THE DRAWING5 (WITH EXCEPTION TO 5PEGIFIG FIN15H COLORS AND FLOORIN(5) ARE INTENDED TO BE ON AN "OR EQUAL" BASIS. ANY PROPOSED SUBSTITUTIONS MUST BE SUBMITTED TO THE ARCHITECT IN WRITING FOR APPROVAL WITHOUT DELAY OF SCHEDULE. 12. LOCATE ALL EXI5TIN6 UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF TH15 WORK. 13. VERIFY AND CONFORM TO ALL REQUIREMENTS OF ALL UTILITY COMPANIES UNLE55 OTHERA15E NOTED IN THE PLANS OR SPECIFICATIONS. 14. ALL DEBRIS SHALL BE REMOVED FROM PREMISES AND ALL AREAS SHALL BE LEFT IN A GLEAN (BROOM) CONDITION AT ALL TIMES. 15. PROTECT ADJACENT WORK AND REPAIR ANY DAMAGE AT CONTRACTOR'S OWN EXPENSE. I6. THE CONTRACTOR SHALL BE RE5PON51BLE FOR SAFETY IN THE AREA OF WORK IN ACCORDANCE WITH ALL APPLICABLE SAFETY CODES. IT THE CONTRACTOR SHALL INDEMNIFY AND HOLD THE BUILDING OWNER/ARCHITECT/EN6INEER HARMLE55 FOR INJURY OR DEATH TO PERSONS OR FOR DAMAGE TO PROPERTY CAUSED BY THE NEGLIGENCE OF THE CONTRACTOR, HI5 AGENTS, EMPLOYEES, OR SUBCONTRACTORS. 15. APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY ANY WORKER5. ALL CONSTRUCTION SETS SHALL REFLECT THE SAME INFORMATION AS WELL AS ALL REVISIONS, ADDENDA, AND GHANSE ORDERS. THE CONTRACTOR SHALL AL50 MAINTAIN IN SOOD CONDITION, ONE COMPLETE SET OF PLANS WITH ALL REVISIONS, ADDENDA, AND GHANSE ORDERS, ON THE PREM15E5 AT ALL TIMES WHICH ARE TO BE UNDER THE CARE OF THE JOB SUPERINTENDENT. Ig. MAINTAIN ALL EXIT PATHWAY5 DURING CONSTRUCTION. 20. PROVIDE COMPLETE SECURITY OF THE TENANT SUITE WHILE JOB 15 IN PROSRE55 AND UNTIL THE JOB 15 COMPLETED. 21. AT COMPLETION OF THE WORK, REMOVE ALL DEBRIS FROM THE SITE, LEAVING SPACE GLEAN, WASH ALL NEW WINDOWS AND 6LA55, POL15H ALL NEW OR REWORKED HARDWARE. REPLACE AND PATCH AREAS OF GEILING DAMAGED DUE TO LIGHTING INSTALLATION OR MECHANICAL ADJUSTMENT. 22. ALL WORK SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER COMPLETION, UNLE55 OTHERA15E SPECIFIED, AND SHALL BE 50 STATED IN CONTRACTOR'S WRITTEN PROPOSAL AND AGREEMENT. ALL REPAIRS, CORRECTIONS, DISCREPANCIES, ETC., MUST BE MADE WITHOUT ANY ADDITIONAL 005T TO THE OWNER, AND WITHIN FIVE (5) DAYS AFTER NOTICE 15 GIVEN. 23. MINIMIZE DISRUPTIONS OF BUILDING OCCUPANTS DUE TO N015E, ODOR, FUMES, OR VIBRATION. AT THE END OF CONSTRUCTION THE CONTRACTOR SHALL COMPLETELY GLEAN ALL AREAS 501LED BY CONSTRUCTION ACTIVITIES INCLUDING THOSE IN WHICH NO WORK WA5 DONE. 24. LATHING, PLASTER, AND 6YP5UM WALL BOARD SYSTEMS SHALL CONFORM TO CHAPTER 25 OF THE 2016 I.B.G. 25. ALL 6LA55 AND GLAZING SHALL COMPLY WITH CHAPTER 24 OF THE 2018 I.B.G. AND THE U.5. PRODUCT SAFETY COMM155ION: SAFETY STANDARDS FOR ARCHITECTURAL GLAZING MATERIALS (42 FR 1426: I(o GFR PART 1201). 26. VERIFY ALL DOOR AND WINDOW ROUGH OPENING DIMEN51ON5 WITH DOOR AND WINDOW MANUFACTURERS. 2T DISCREPANCIES BETWEEN EXI5TIN6 CONDITIONS AND CONSTRUCTION DRAWING SHOULD BE GALLED TO THE ATTENTION OF THE ARCHITECTS.. DIMEN51ON: 1. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS 15 GIVEN AS THE BEST PRESENT KNOWLEDGE BUT WITHOUT GUARANTEE OF ACCURACY. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND DIMEN51ON5 AND SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES OR CONDITIONS ADVERSELY AFFECTING THE DE516N PRIOR TO PROCEEDING WITH THE WORK. 2. DIMENSIONS OF PLANS ARE TYPICAL TO THE GENTERLINE OF COLUMNS AND FINISHED G.W.B. FACE OF PARTITIONS, UNLE55 NOTED OTHERA15E. DOOR AND CASED OPENIN65 WITHOUT LOCATION DIMENSIONS ARE TO BE FOUR (4) INCHES FROM THE FACE OF THE ADJACENT PARTITION OR CENTERED BETWEEN PARTITIONS. 3. DO NOT SCALE DRAWIN65. THE CONTRACTOR SHALL USE DIMENSIONS SHOWN ON THE DRAWIN65 AND ACTUAL FIELD MEASUREMENTS. NOTIFY THE ARCHITECT IF DISCREPANCIES ARE FOUND. CONTRACTOR SHALL CONSULT OWNER'S REPRESENTATIVE WHEN ADDRE551N6 QUESTIONS OF MATERIAL, METHODS, DETAIL OR WORKMAN5HIP NOT COVERED IN THE CONTRACT DOCUMENTS. 4. CONSTRUCT WALLS PLUMB AND SQUARE WITH EXISTING STRUCTURE AND NEW CONSTRUCTION UNLESS NOTED OTHERWI5E. 5. COORDINATION: THE GENERAL CONTRACTOR SHALL BE RE5PON51BLE FOR THE VERIFICATION AND COORDINATION OF THE WORK OF ALL TRADES TO A55URE COMPLIANCE WITH THE DRAWING5. 6. ANY DEVIATIONS FROM DIMENSIONED LOCATIONS MUST BE APPROVED BY THE ARCHITECT FIRE PROTECTION: I. IF NECESSARY, PROVIDE FIRE PROTECTION AT ALL PENETRATIONS OF FIRE RELATED ELEMENTS AS REQUIRED BY CODE. 2. FIRE EXTINSUI5HER5: PORTABLE FIRE EXTINGUISHERS, 51ZE 2A IO:B:G. VERIFY LOCATION PER FIRE MARSHALL REQUIREMENTS. CONTRACTOR TO PROVIDE ALL TEMPORARY AND PERMANENT FIRE EXTIN605HER5 REQUIRED UNDER N.F.P.A. 10 M05T REGENT EDITION AND APPROVED BY THE FIRE MARSHALL. CONFIRM ACCEPTABILITY OF LOCATION WITH OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. PROVIDE FINISHED CABINETS TO MATCH BUILDING STANDARD FOR EXTINGUI5HER5 AT ALL EXF05ED LOCATIONS. 3. FIRE EXTINGUI5HER5 AND CABINETS SHOULD BE LOCATED 50 THAT THE TOP OF THE EXTIN67UI5HER OR CABINET 15 NO HIGHER THAN 48" A.F.F. AND THE TOP OF THE EXTINGUISHER OR CABINET HANDLE 15 AT LEAST 36" A.F.F. 4. AT 5EMI-REGE55ED FIRE EXTIN6U15HER CABINETS WRAP ADDITIONAL LAYER(5) OF TYPE 'X' SYP5UM WALL BOARD INTO THE CABINET CAVITY TO MAINTAIN SPECIFIED FIRE RATED REQUIREMENT. REFER TO WALL CONSTRUCTION LEGEND FOR ADDITIONAL INFORMATION. 5. PROVIDE AND INSTALL FIRE EXTINGUISHER 516NAGE (5"X(b") ABOVE EACH FIRE EXTINGUISHER OR CABINET WITHIN THE SCOPE OF THE TENANT IMPROVEMENT. MOUNT AT 54" A.F.F. UNLE55 OTHERWI5E REQUIRED. 6. EXIT 516N5 AND EXIT ILLUMINATION SHALL CONFORM TO THE 2015 I.B.G. AND FEDERAL WAY FIRE MARSHALL REQUIREMENTS. CONTRACTOR TO PROVIDE AND INSTALL EMERGENCY LIGHTING AND EXIT LIGHTING AS REQUIRED BY THE FEDERAL WAY FIRE AND BUILDING DEPARTMENTS. CONFIRM ACCEPTABILITY OF LOCATIONS WITH OWNER15 REPRESENTATIVE BEFORE INSTALLATION. CONTRACTOR SHALL PROVIDE AND INSTALL AUDIBLE ALARMS IN ACCORDANCE WITH I.B.G. ARTICLE g. CONTRACTOR SHALL PROVIDE AND INSTALL VISIBLE ALARM 516NAL5 A5 REQUIRED BY ADA 6UIDELINE5. CONTRACTOR SHALL PROVIDE AND INSTALL ALL SMOKE DETECTORS AND SMOKE DETECTION AS REQUIRED UNDER ARTICLE g OF THE I.B.G. THE INSTALLATION OF THE ABOVE NOTED SYSTEM SHALL INCLUDE THE CONNECTION TO AND/OR MODIFICATION OF THE EXI5TIN6 BUILDING SYSTEMS, AS NECESSARY. 7. EXIT DOORS SHALL BE OPENABLE FROM THE IN51DE WITHOUT THE USE OF A KEY OR ANY 5PEGIAL KNOWLEDGE OR EFFORT. 8. FLAMMABLE LIQUIDS SHALL NOT BE PLACED, STORED, OR 015PEN5ED IN TH15 OCCUPANCY EXCEPT AS PROVIDED IN N.F.P.A. STANDARD 30 AND THE 2015 INTERNATIONAL FIRE CODE. PERMIT MAY BE REQUIRED. g. ALL DRAPES, HAN61N65, CURTAINS, AND ALL OTHER DECORATIVE MATERIAL, INCLUDING CHRISTMAS TREES THAT WOULD TEND TO INCREASE THE FIRE AND PANIC HAZARD SHALL BE MADE FROM NONFLAMMABLE MATERIAL, OR SHALL BE TREATED AND MAINTAINED IN A FIRE RETARDANT CONDITION BY MEANS OF A FLAME RETARDANT SOLUTION OR PROGE55 APPROVED BY THE FIRE MARSHALL. PROVIDE A CERTIFICATION TO TH15 EFFECT. EXIT DOORS, EXIT LIGHT5, AND FIRE EXTIN605HER LOCATIONS SHALL NOT BE CONGEALED OR OBSTRUCTED BY ANY DECORATIVE MATERIAL. MINIMUM FLAME SPREAD CLASSIFICATION OF INTERIOR FIN15HE5 SHALL BE PER TABLE SO3.5, SECTION 803.1 OF THE 2018 I.B.G. 10. ALL REQUIRED FIRE DOORS SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY 5HOWIN6 THE SPECIFIC RATING. 11. ADD AND/OR RELOCATE LIFE SAFETY DEVICES A5 NEGE55ARY PER BUILDING CODE. CONSTRUCTION: I. INVE5TIGATE AND VERIFY LOCATIONS OF EXI5TIN6 STRUCTURAL, PLUMBING, MECHANICAL, AND ELECTRICAL ELEMENTS AND OTHER EXI5TIN6 CONDITIONS AND NOTIFY THE ARCHITECT OF ANY AND ALL DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. 2. COORDINATE CONSTRUCTION 5GHEOULIN6 WITH TENANT AND BUILDING REPRESENTATIVE TO ALLOW ONGOING OPERATION OF THE FACILITY DURING CONSTRUCTION. 3. PROVIDE FIRE TREATED BLOCKING AS REQUIRED FOR WALL AND CEILING MOUNTED ITEMS. 4. THERE SHALL BE NO EXP05ED PIPE, CONDUITS, DUCTS, VENT5, ETC. ALL SUCH LINES SHALL BE CONGEALED OR FURRED AND FINISHED, UNLE55 NOTED A5 EXF05ED ON CONSTRUCTION DRAWINGS. 5. OFFSET STUDS WHERE REQUIRED 50 THAT FIN15H WALL 5URFAGE5 WILL BE FLUSH. 6. PROVIDE 6ALVANIG 150LATION BETWEEN DISSIMILAR METALS. 7. PATCH AND REPAIR ALL EXI5TIN6 SURFACES A5 REQUIRED BY DEMOLITION AND NEW CONSTRUCTION TO RECEIVE NEW SCHEDULED FIN15HE5. ALL SURFACES ARE TO HAVE "LIKE -NEW" APPEARANCE. 8. STUD HEIGHT AND 5PAGIN6 LIMITATION OF STEEL FRAMING COMPONENTS SHOULD BE IN COMPLIANCE WITH A5TM G 754 FOR MAXIMUM DEFLECTION AND MINIMUM LATERAL LOADING REQUIREMENTS. g. ALL DEMOLISHED MATERIALS TO BE RECYCLED TO AN APPROVED RECYCLER. 11. STUD HEIGHT AND 5PAGIN6 LIMITATION OF STEEL FRAMING COMPONENTS SHOULD BE IN COMPLIANCE WITH A5TM C 754 FOR MAXIMUM DEFLECTION AND MINIMUM LATERAL LOADING REQUIREMENTS. MECHANICAL $ ELECTRICAL: I. PLUMBING, MECHANICAL, $ ELECTRICAL DRAWING5 ARE TO BE SUBMITTED UNDER SEPARATE PERMIT 2. MECHANICAL $ ELECTRICAL CONTRACTORS SHALL BE RE5PON51BLE TO MAINTAIN COMPLIANCE WITH APPLICABLE CODES AND STANDARDS AND OBTAIN ALL NECESSARY PERMITS AND APPROVALS. 3. ANY DEVIATIONS FROM DIMENSIONED LOCATIONS MUST BE APPROVED BY THE ARCHITECT. 4. DISCREPANCIES BETWEEN EXI5TIN6 CONDITIONS AND CONSTRUCTION DRAWING SHOULD BE GALLED TO THE ATTENTION OF THE ARCHITECTS. 5. EXACT LOCATIONS OF THE CEILING GRID $ LIGHTING SHOULD BE VERIFIED. 6. ALL CABLING AND WIRING NOT IN CONDUITS OR FULL SURROUND GABLE TRAYS SHALL HAVE A FLAME SPREAD RATING OF LESS THAN 25 AND A SMOKE DEVELOPMENT RANGE OF LE55 THAN 50. T MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE BIDDER DESIGN/BUILD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE GORRE5PONDIN6 PERMITS FOR WORK. THE PROPOSED 5Y5TEM DE516N $ METHOD OF OPERATION FOR ALL ROOMS SHALL BE REVIEWED AND APPROVED BY THE TENANT PRIOR TO THE START OF ANY WORK. 8. WHERE APPLICABLE, STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL, AND FIRE PROTECTION DRAWIN65 ARE SUPPLEMENTARY TO THESE DRAWIN65. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ALL DISCREPANCIES BETWEEN THE 0ON5ULTANT5' DRAWING5 WITH A WRITTEN REQUEST FOR CLARIFICATION. ANY WORK INSTALLED IN CONFLICT WITH THESE DRAWING5 OR SPECIFICATIONS SHALL BE CORRECTED BY THE CONTRACTOR AT NO EXPENSE TO THE BUILDING OWNER, TENANT, OR ARCHITECT. g. ALL EXP05FO PIPING IN RETURN AIR PLENUM MUST MEET F5 25. FIN15H AND MATERIALS: I. SUBMIT FIN15H SAMPLES TO TENANT FOR APPROVAL PRIOR TO ORDERING MATERIALS. 2. INTERSECTION OF SCHEDULED FLOORING MATERIALS ARE TO OCCUR AT CENTERLINE OF DOOR WHEN IN A FULLY CLOSED POSITION UNLE55 NOTED OTHERWISE. 3. PROVIDE APPROPRIATE TRANSITION MATERIAL AS REQUIRED WHERE 01551MILAR FLOORING MATERIALS INTERSECT. DOOR: I. ALL DOOR HARDWARE TO MEET REQUIREMENTS OF 2016 IBC W/ WA5HINSTON STATE AMENDMENTS AND OWNER'S BUILDING REQUIREMENTS. LEVER HANDLES ARE REQUIRED IN ALL PUBLIC AREAS. 2. COORDINATE ALL KEYING REQUIREMENTS WITH OWNER/TENANT. CONTRACTOR SHALL PROVIDE ALL LOGK5ET CYLINDERS TO MATCH OWNER STANDARD. CONTRACTOR SHALL RE -KEY ALL DOORS TO MEET OWNER'5 REQUIREMENTS. PROJECT APPRE55: 3450 5. 344TH WAY FEDERAL WAY WA, 118001 AO.00 COVER SHEET AO.01 GENERAL NOTES, PROJECT DATA, INDEX PROJECT OWNER: R05EN PROPERTIES 1500 112TH AVE NE A1.00 CODE PLAN BELLEVUE, WA g8004 CONTACT: DARYL REICH5TEIN A3.00 DEMOLITION PLAN EMAIL: DARYLR@RO5ENHAR5OTTLE.COM A3.01 FLOOR PLAN PROJECT ARCHITECT: FREIHEIT ARCHITECTURE 777 105TH AVE NE SUITE 1650 A6.00 DETAILS BELLEVUE, WA g8004 PHONE: (425) 521-2100 A6.01 DETAILS CONTACT: CHELSEA MERKEL EMAIL: GMERKEL@FREIHEITARGH.GOM A6.02 DETAILS CONTRACTOR: TBD ATOO DEMOLITION REFLECTED CEILING PLAN A7.01 REFLECTED CEILING PLAN Ag.00 FIN15H SCHEDULE Ag.01 DOORS HARDWARE DOOR SCHEDULE AUTHORITY: GITY OF FEDERAL WAY EI.00 ELECTRICAL PLAN GOVERNING CODE: 2015 IBC A5 ADOPTED BY THE CITY OF FEDERAL WAY ZONING: OP-1 (OFFICE PARK 1) OCCUPANCY GLA551FICATION: B (OFFICE) TYPE OF CONSTRUCTION: V-B (5PRINKLERED) NUMBER OF STORIES: 2 PROPERTY TAX NO.: 222104-11040 / 126120-0I115 / 726120-0275 50. FT. OF BUILDING: 64,165 5.F 50. FT. OF IMPROVEMENT: 11,562 S.F. SCOPE OF WORK: TENANT IMPROVEMENT VALUATION: $700,000 VICINITY MAP N.T.5. APPLICABLE CODES DEFERRED SUBMITTALS THE FOLLOWING PORTIONS OF THE PROJECT WILL BE APPLIED FOR UNDER SEPARATE PERMITS, IF REQUIRED: I. LINE VOLTAGE ELECTRICAL SYSTEM WORK. 2. HVAG SYSTEM. (DUCTING, D15TRIBUTION AND CONTROLS, AND A55001ATED STRUCTURAL) 3. LIFE SAFETY SYSTEMS. (HORNS, STROBES AND FIRE ALARM IMPROVEMENT5) 4. LOW VOLTAGE ELECTRICAL SYSTEMS. (TELEPHONE/DATA/5EGURITY/INTERCOM) 5. PLUMBING SYSTEM WORK 6. 5Y5TEM FURNITURE WORK 7. FIRE SPRINKLER WORK LEGAL DESCRIPTION ION* r� • WA5HIN67TON STATE BUILDING CODES AND AMENDMENTS • WA5HINSTON ADMINISTRATIVE CODE (WAG) • FEDERAL WAY MUNICIPAL CODE • 2015 INTERNATIONAL BUILDING CODE W/ WA5HIN6TON STATE AMENDMENTS (51-50 WAG) • 2015 INTERNATIONAL EXI5TIN6 BUILDING CODE • 2015 INTERNATIONAL FIRE CODE W/ WA5HIN6TON STATE AMENDMENTS (51-54 WAG) • 2018 INTERNATIONAL MECHANICAL CODE W/ WA5HINSTON STATE AMENDMENTS (51-52 WAG) • 2015 WA5HIN6TON STATE ENERGY CODE (51-II WAG) DESCRIPTION OF WORK TENANT IMPROVEMENT TO INCLUDE: DEMOLITION OF NON-STRUCTURAL PARTITIONS AND DOORS AND CONSTRUCTION OF NEW NON-STRUCTURAL PARTITION WALL5, DOORS, AND FINISHES. NO SITE WORK PROPOSED UNDER THIS PERMIT Z w> \w � 0 L.L Lu Q N w Z O In/ Z 0L w p U Qo 3:� 0 co = Q Z C`7 ry O U oQ L.L U) ry J Cn Q o 0 U w CoLL w RRGI STERED ARCHITECT MICHAEL T. L T TON STATE OF :�A INCTON REVISION LIST REV DESCRIPTION DATE PERMIT SET 4/14/2021 1 PERMIT SET RESUBM7TAL 7/7/2021 RESUBMITTED 7/8/2021 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT FOR OF NW 1/4 OF 5W 1/4 LY ELY OF 5R IS $ 5ELY OF 5 344TH 5T INTERCHANGE $ NWLY OF 5 344TH WAY TSW VAC 5 344TH 5T COVER SHEET AO. 0 1