Loading...
05-106325 • FILE CITY OF CITY HALL Fed ra Way 33325 8th Avenue South•PO Box 9718 Federal Way, nu 9 South•718 PO (253)835-7000 www.cityoffedera iwa y.com January 24, 2006 Michael Donne Summit Properties 10618 Kent Kangley Road, Suite 104 Kent,WA 98031 Re: File#05-106325-00-PC,PREAPPLICATION CONFERENCE SUMMARY Steel Lake Presbyterian Church Short Plat, 1820 South 308th Street,Federal Way Dear Mr.Donne: Thank you for participating in the preapplication conference with the City of Federal Way's Development Review Committee(DRC)held January 5,2006.We hope that the information discussed at that meeting was helpful in understanding the general requirements for your project as submitted. This letter summarizes comments given to you at the meeting by the members of the DRC. The members who reviewed your project and provided comments include staff from the City's Planning and Building Divisions and Public Works Department, and representatives from Lakehaven Utility District and Federal Way Fire Department. Some sections of the Federal Way City Code(FWCC)and relevant information handouts are enclosed with this letter.Please be advised,this letter does not represent all applicable codes. In preparing your formal application,please refer to the complete FWCC and other relevant codes for all additional requirements that may apply to your project. The key contact for your project is Jim Harris,253-835-2641,jim.harris@cityoffederalway.com. For specific technical questions about your project,please contact the appropriate DRC representative as listed below. Otherwise, any general questions about the preapplication and permitting process can be referred to your key contact. PROJECT DESCRIPTION Subdividing one lot into two separate lots resulting in an existing single-family residential structure on one lot and the existing church and parking lot on the second lot. MAJOR ISSUES Outlined below is a summary of the major issues of your project based on the plans and information submitted for preapplication review. These issues can change due to modifications and revisions in the plans. These major issues only represent comments that the DRC consider most significant to your project and do not include the majority of the comments provided.The major issues section is only provided as a means to highlight critical requirements or issues. Please be sure to read the entire department comments made in the next section of this letter. • January 24,2006 Page 2 • Building Division Any change to the occupancy(use)of the existing single-family residence will require approval by the Building Official based upon a submitted proposal,and may require alterations to the existing structure to comply with accessibility,ventilation, fire and life safety codes. If there is documentation that the building was brought up to code at the time the house was converted to an office/church use,please submit it to the City for review. DEPARTMENT COMMENTS Outlined below are the comments made by the representatives of each department present at the preapplication conference. Each section should be read thoroughly. If you have questions please contact the representative listed for that section. PLANNING DIVISION (Jim Harris,Senior Planner,253-835-2641,jim.harris@cityoffederalway.com) The intent of the proposed short plat is to create a separate lot in order to use the existing residential structure for administrative offices for Young Life. As discussed at the meeting and in an email dialogue with Ms.Tonya Coffey following the meeting,the proposed Young Life use is permitted on the site as the property is currently configured(without the proposed short plat). However, subdividing the property raises a number of issues related to the use and compliance with the City's subdivision requirements. To overcome these issues,as an alternative to subdividing the property, the City suggested leasing the existing building on the site.Based on dialogue I had with Ms. Coffey,it appears that leasing the residence is a workable solution that can meet the objective of Young Life,while meeting applicable Federal Way City Code(FWCC)requirements. With a lease arrangement now being the proposal,the City will not address issues related to subdividing the property. In the event plans for the property change and the church wishes to subdivide the property, the City will address use and subdivision requirements at that time. BUILDING DIVISION (Michael Lee,253-835-2639,michael.lee@cityoffederalway.com) If occupancy of the single-family residence is to be changed then the following applies: A change of occupancy classification or use of any building requires approval of the Building Official. In order to secure that approval, several areas of the building may need structural changes, additional fire protection,or zoning code upgrades as required by the code for the proposed occupancy. This occurs most frequently when a residence is converted to a commercial use, or any other commercial use is converted to an assembly occupancy(churches,restaurants,classroom facilities, offices,etc.). If there is documentation that the building was brought up to building codes at the time the house was converted to an office/church use,please submit it to the City for review. If no such documentation exists, the following analysis may be required. Proponent Responsibilities 1. The proponent must secure the services of a person or firm familiar with the IBC, IMC,UPC, IFC, (including pertinent state amendments) and the Washington State Energy and Ventilation Codes to 05-106325 Doc.1.D.34489 Mr.Donne January 24,2006 Page 3 inspect the building and prepare plans(or a report) showing compliance with current code requirements for the proposed use. 2. The proponent will request,in writing, an approval for the proposed change of use. If no construction is required for the conversion, a report of the findings from item one above must be submitted with the written request. If construction is required to convert the building for the proposed change of use, a permit application must be submitted. A complete set of construction drawings demonstrating compliance with all current codes for the proposed use must be submitted with the permit application. City Process 1. A written request and/or permit application for a change of use will be routed to all City departments normally involved in processing permit applications.The change of use must be compatible with land use requirements of the zone in which it is located and must comply with all building code requirements. The City will review the request and issue a determination based on information provided. 2. If appropriate,permits will be issued for improvements required by the change of occupancy. When all work conducted under such permits has been inspected and approved,the Building Official will issue a new certificate of occupancy for the new use. A change in occupancy requires the building to comply with all current codes if the proposed use is more hazardous(as determined by the Building Official)than that of the existing use. The information provided is based on limited plans and information.The comments provided are not intended to be a complete plan review and further comments are possible at time of building permit plan review. LAKEHAVEN UTILITY DISTRICT(Brian Asbury,253-946-5400,basbury@lakehaven.org) Water The precise location of the existing 5/8 meter(S/N 4688) that currently serves the existing residential structure is not shown on the proposed short plat map; however, it is presumed to be located along the north property line. Under this presumption and depending on the precise location of this meter, a private water easement may or may not be necessary across a portion of the new Lot 1. If the existing meter is located on the new Lot 1,new private water easement and/or additional public water easement may be necessary across a portion of the new Lot 1. Sewer The precise location of the existing,private building/side sewer(S/N 4688, SSP 337)that currently serves the existing residential structure is not shown on the proposed short plat map.Applicant will need to determine the current alignment of the pipeline, and if necessary,reserve private sewer easement across a portion of the new Lot 1. If the existing pipeline alignment crosses directly onto either of the adjacent lots to the east(T/L 104 or Lot 1) as shown on the short plat map, Lakehaven strongly recommends that the applicant acquire any easement(s) necessary to cover all existing off-site pipe. General All comments herein are valid for one(1)year and are based on the proposal(s)submitted and Lakehaven's current regulations and policies. Any change to either the development proposal(s)or Lakehaven's regulations and policies may affect the above comments accordingly. 05-106325 Doc.I .34489 Mr.Donne January 24,2006 Page 4 FEDERAL WAY FIRE DEPARTMENT (Greg Brozek,253-946-7241,greg.brozek@southkingfire.org) Water Supplies for Fire Protection A Certificate of Water Availability shall be provided indicating the fire flow available at the site. Fire hydrants shall be spaced 700 ft.or less apart. Every building lot shall have a fire hydrant within 350 ft. All measurements shall be made as vehicular travel distance. Fire hydrants shall be in service PRIOR to and during construction. Fire Apparatus Access Roadway Fire apparatus access roadways shall be required for every building when any portion of an exterior wall of the first story is located more than 150 ft. from fire apparatus vehicle access.Fire apparatus access roads: 1) Shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches. 2) Shall be designed and maintained to support the imposed load of a 25-ton fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. 3) Shall be not less than a 20-foot inside turning radius and not less than a 40-foot outside turning radius. 4) With a dead-end in excess of 150 feet in length shall be provided with a cul-de-sac or Fire Department approved alternative at the dead end. All such cul-de-sacs shall be not less than 80 feet in diameter. 5) Gradient shall not exceed 15 percent. 6) Serving a single residential property which have a dead end in excess of 150 feet in length shall be provided with a turn around approved by the chief. (KCFD#39 Administrative Policy Guideline No. 1006) EXCEPTION: When buildings are completely protected with an approved automatic fire sprinkler system, these provisions may be modified by the chief. Fire apparatus access road gates shall comply with KCFD#39 Administrative Policy Guideline No. 1001. Automatic Fire Sprinkler Systems An automatic fire sprinkler system shall be installed in Group R,Division 3 occupancies: 1) When the occupancy exceeds 2,500 square feet(including attached garages)without adequate fire flow. 2) Without approved fire department access. 3) When the occupancy exceeds 10,000 square feet. 05-106325 Doc.I.D.34489 Mr.Donne January 24,2006 Page 5 4) When the building is classified as an over-water structure. Comments: The minimum fire flow for one-and two-family dwellings shall be 1,000 gallons per minute. These comments are applicable if the existing building on newly created Lot 2 is utilized as a single- family residence.If the proposed use of this building constitutes a change of use(office space,etc.) there would be additional requirements. THESE COMMENTS ARE VALID FOR 180 DAYS FROM REVIEW AND ONLY FOR THE PLANS REVIEWED. CLOSING This letter reflects the information provided at the preapplication meeting and is intended to assist you in preparing plans and materials for formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the City's review of the formal application.The completion of the preapplication process in the content of this letter does not vest any future project application. Comments in this letter are only valid for one year as per FWCC Section 22-1657. As you know,this is a preliminary review only and does not take the place of the full review that will follow submission of a formal application. Comments provided in this letter are based on preapplication materials submitted. Modifications and revisions to the project as presented for this preapplication may influence and modify information regarding development requirements outlined above. In addition to this preapplication letter, please examine the complete FWCC and other relevant codes carefully. Requirements that are found in the codes that are not addressed in this letter are still required for your project. If you have questions about an individual comment,please contact the appropriate department representative noted above. Any general questions can be directed towards the key project contact,Jim Harris, 253-835-2641. We look forward to working with you. Sincerely, yam, Jim Harris Senior Planner c: Tonya Coffey,PO Box 3005,Yelm, WA 98597 Steel Lake Presbyterian Church, 1829 South 308th Street,Federal Way,WA 98003 Tom Touma,6632 South 1915`Place,Suite E102,Kent,WA 98032 Michael Lee,Building Inspector Kevin Peterson,Engineering Plans Reviewer Brian Asbury,Lakehaven Utility District Greg Brozek,South King Fire and Rescue 05-106325 Doc.I .34489 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT REVIEW COMMITTEE(CDRC) Preapplication Conference Sign In Sheet STEEL LAKE PRESBYTERIAN CHURCH SHORT PLAT File No. 05-106325-PC January 5, 2006 NAME REPRESENTING TELEPHONE NUMBER 1. n� }( � i 5 f w : P741A1 /9 F35 _No v/ 2. 5k,,,, H0L--11-5 5d Pis, g _ ? _ 11)9 3. AI..M 1 1ioA tz,tc L.AK.0 Q .. ' '- ' g Z 9 - I'74 4 4. /a.../ b �-(C�c�ric�. S L�f�C- Z s 3 - c,Z?- Z3J� 5. R cpc-r-c\I n 1 ►a(JUVIvtiL, o- e 6. 7.4W /.004 A:i7p,4024/76,-- /Gs - zS/_ ina6S 7. 8. t �,v„� Pa-e.,r VI- ie. J. Czs3) 63 - z 1--3 9 9. (' 116'1 / 1--'e 1 U► �'�� ►^ Z ' S 3 (� 10. , ,�-, CSTL- a53-ci4c) -s4o 7 C-4 1 � c._ v-s p 1- S3 s 12. F ILE Alibi CITY OF CITY HALL Federal VVay Avenue South• Box 9718 Federal Way,WA 98063 97171 8 (253)835-7000 www.cityoffederal wa y.com December 15,2005 Michael Donne Summit Properties 10618 Kent Kangley Road, Suite 104 Kent,WA 98031 RE: File No.05-106325-00-PC; PREAPPLICATION MEETING Steel Lake Presbyterian Church Short Plat, 1820 South 308th Street,Federal Way Dear Mr.Donne: The above-referenced proposal has been assigned to me as project planner.At this time,the application and preliminary site plan have been routed to the members of the Development Review Committee.A meeting with the project applicant and Development Review Committee has been scheduled as follows: January 5,2006— 10:00 AM Hylebos Conference Room City Hall, Second Floor 33325 8th Avenue South Federal Way, WA 98003 We look forward to meeting with you to discuss your proposal. Contact me at 253-835-2641 or jim.harris@cityoffederalway.com if you have any questions. Sincerely, gatvilv)- Ji arris Senior Planner 05-106325 Doc.I .34409 , 4k. RECEIVED MASTER LAND USE APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES CITY OF 1vww`'' 33325 8eh Avenue South PO Box 9718 Federal Way DEC 1 2 00 Federal Way WA 98063-9718 253-835-2607;Fax 253-835-2609 www.cityoffe deralway.corn CITY OF FEDERAL WAY BUILDING DEPT. APPLICATION NO(S) C./� l 0 (0 3 2 5 — P e— Date I Z-- I Z -- O s/ /'L %�by)'M),-/ ,q L Project Name Ge Q � Property Address/Location /2299' „C. 308 .4. ��• /,A?4!^Q/4.14., / W. gO 0).•5 Parcel Number(s) 6 9Z/ ff- 9/7i / Project Description urea•-/ fZeh`,4 • e,v/,57, /7; ‘,7Q/7'e/ /`!fi 0 L D,4 • /aa s er-e a�e. .9 `'e'D/e.W4�Od/��e /pi/4120:5/y GALitz-4 /7r0/2&/' PLEASE PRINT Type of Permit Required Applicant Annexation Binding Site Plan Name: Ai./444,e/ 2:)L, /Je Boundary Line Adjustment Address:/b6/k 5C ,44,4,4/larsleei ,% 571e /d 4/ Comp Plan/Rezone Land Surface Modification City/State: ,a-1f/W/4. Zip: 9�3/ Lot Line Elimination tJ ((a V 4 X Preapplication Conference Phone:Z.5 -S-SS-2--!Pc/ a Process I(Director=s Approval) Fax: ZS3- SSZ -'6 Y33 Process II(Site Plan Review) Email: Process III(Project Approval) Signature: ,, Process IV(Hearing Examiner's Decision) K J Process V(Quasi-Judicial Rezone) Agent (if different than Applicant) Process VI SEPA w/Project Name: 70,E %Z/0142. SEPA Only Address: 3Z S • /9 " /7 ,5cui/e E/.0Z• Shoreline: Variance/Conditional Use City/State: Ke7/, /4v4. Short Subdivision Zip: fazza2 Subdivision Phone: /j/Z,S'-ZS/-OlaG I r Variance: Commercial/Residential Fax: ./2S- 7-S/- o GZ S Email: m4/04/014 40/Lew, Signature: o. y - Required Information Owner 7 Z Zoning Designation / /�� / �tS/c omprehensive Plan Designation Name: •.g e/L. 1.6 5eS,6y/fe//. W C`!V/"1 Address: /A72p S• 3o8d4S1 Value of Existing Improvements City/State:F40erv/ /Ah. y/ w�' Value of Proposed Improvements Zip: Z Phonee:: Z 53-$87-/Z/0 International Building Code(IBC): wit Fax: 1)t.)ii,1 4 Occupancy Type Email: 6Y ,S�e /,v,� ,* p YSignature: ! r o Construction Type �� Bulletin#003-August 18,2004 Page 1 of 1 k:\t-iandouts\Master Land Use Application 16q° CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: December 15, 2005 TO: 11 Appleton, Development Services Manager (2 copies) Scott Sproul, Assistant Building Official Brian Asbury, Lakehaven Utility District Greg Brozek, Federal Way Fire Department FROM: Jim Harris, Senior Planner, 253 835-2641 FOR DRC MTG. ON: December 29, 2005 - Internal January 5, 2005, 10:00 AM - with applicant FILE NUMBER(s): 05-106325-00-PC RELATED FILE NOS. : None PROJECT NAME: STEEL LAKE PRESBYTERIAN CHURCH SHORT PLAT Pre-app PROJECT ADDRESS: 1820 S 308TH ST ZONING DISTRICT: RS 7.2 PROJECT DESCRIPTION: Proposal to create (2) lots from a single lot . LAND USE PERMITS: TBD PROJECT CONTACT: SUMMIT PROPERTIES Michael Donne 10618 KENT KANGLEY RD Suite 104 (253) 852-6400 MATERIALS SUBMITTED: Preliminary Plat conceptual drawing by Tom Touma 4 I.dl„t s pvtbt i c_ /u Q2w�oJ �y Qw k,-) 5pocLs -cOY- k' ) aC.LQ S? —` -Ke- ea,V.;-7 4 �re4_A4,)uik 4411116, ‘..... --... MASTER LAND USE APPLICATION `, DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES RECE M[D 33325 8th Avenue South CITY OF PO Box 9718 Federal Way DEC 1 2 2005 Federal Way WA 98063-9718 253-835-2607;Fax 253-835-2609 www.cityoffederalway.com OITY OF FEDERAL WAY BUILDING DEPT. APPLICATION NO(S) Os — G 0 (o 3 a r Fe- Date IZ 1 Z — 0 c 6y Project Name ,;,4 e/L iee- $ , / / / Property Address/Location /O2S30 f , '. . 8�'.S/• //c./crQ//-t/•Zy/ A7 gp e)03 Parcel Number(s) 6 f z/ 4/- 9 ,9 // Project Description 5 / /',i'7 .-e /Sf it gr/'Ce/ /irk h iC9 104 • %a 6 ere,4-4., 4 i,~4'O /dye ip‘prIte.5/ GAv,z--24 ,,,,PPir PLEASE PRINT Type of Permit Required Applicant Annexation Binding Site Plan Name: Af./444e/ 2)4C2 nC Boundary Line Adjustment Comp Plan/Rezone Address:/b6/k 5C i(/94,//.4019, '/rr/ Id y Land Surface Modification City/State: ,c i'//k/4. - Lot Line Elimination Zip: 9e3/ A Preapplication Conference Phone:Z- -8'SZ -�yaa Process I(Director=s Approval) Fax: ZS,3- B'S2 -�'V33 Process II(Site Plan Review) Email: Process III(Project Approval) Signature: J Process IV(Hearing Examiner's Decision) X Process V(Quasi-Judicial Rezone) Agent(if different than Applicant) Process VI SEPA w/Project Name: 70.1,/ %U0f4 SEPA Only I Address: c32 5 . /9/5-f P/. ,..5c."de E/OZ Shoreline: Variance/Conditional Use City/State: Ke'7/, iv.!. Short Subdivision Zip: 9. 6342.92. Subdivision Phone: L�ZS=ZS/-C 6. Variance: Commercial/Residential Fax: 9' c- zS/ 4' ZS Email: m4f01/074 P 7O/.eiorfri Signature: b � >0.4_,,,, Required Information Owner 7 Z Zoning Designation / / / Name: •�9?e/i-Qie gesh / eizo. & 'i`d 4S/de74a.komprehensive Plan Designation Address: /82p S . 3p8'/4.5r1, Value of Existing Improvements City/State:�c4oer a/ /,fzer ,y, AL)Ai• 6190.5 Value of Proposed Improvements P 2 Phh onee:: 2 5.3-4337;/Z/0 International Building Code(IBC): wil Fax: Occu c T e Email: GY �� �,p[i(. . ,.y 1 Y Signature: / Construction Type f Bulletin#003-August 18,2004 Page 1 of 1 k:\Handouts\Master Land Use Application