Loading...
20-101779-Permit FinalCity of Federal way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: GLAVATSKIY Project Address: 2044 S 312TH ST Building - Single Family Permit #:20-101779-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 053700 0640 Project Description: ***BLUEBEAM ELECTRONIC REVIEW*** Construction of a new 2795 square foot, 2-story single family residence with a 102 square foot covered entry and a 609 square foot attached garage. Includes plumbing and mechanical. ***3 Bedrooms; $520000 estimated selling price.*** Owner Applicant Contractor Lender. LEONID GLAVATSKIY HAYNES LUNDHAYNES WILSON OWNER IS CONTRACTOR OWNER IS LENDER 2042 S 312TH ST LUND ARCHITECTS LLC FEDERAL WAY WA 98003 385 101ST AVE SE BELLEVUE WA 98004 Census Category: 101 - New Single Family House Includes: #1 #2 #3 #4 Occu anc Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 2,795.00 Additional Permit Information New / Additional Sq. Feet - I st Floor ..................... 1279 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Basement .................... 0 Occupancy #1 - Construction Type...... ....... Type V - B New / Additional Sq. Feet - Garage ........................ 609 Plumbing Work Valuation?...................................1. 12000 Number of Stories ........:............... 2 Plumbing to be Included? ........................................ Yes Will Certificate of Occupancy be Issued? ............... Yes Comprehensive Plan Designation ................. . . SF - High -Density Residential Total Valuation: 370,264.40 Air Handling Units Bathtubs Lavatories Water Closets New / Additional Sq. Feet - 2nd Floor .................... 1517 Occupancy #1 - Area (Sq. Feet) ...... ....... __.......... 1. 2795 BasicPlan?........................................................... No New / Additional Sq. Feet - Deck ........................... 0 Mechanical to be Included? ..................................... Yes Mechanical Work Valuation?.................................1 11900 New / Additional Sq. Feet - Otherr ........................... 102 New / Additional Sq. Feet - Total ........ __.............. 3506 Occupancy #1 -Use ......................................... Residence (I or 2 family) Zoning Designation ......:.......... .,..., RS 7.2 Mechanical Fixtures 1 Fans Plumbing Fixtures 2 Dishwashers 5 Showers 4 Water Heaters 4 Fireplace Inserts 1 Laundry Washer Outlets 1 2 Sinks 2 1 Hose Bibbs 4 PERMIT EXPIRES Wednesday, 6 January, 2021 Permit Issued on Friday, July 10, 2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of i he City of Federal Way - LE Owner or agent: Date: City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: GLAVATSKIY Address: 2044 S 312TH ST Includes: # 1 #2 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 2,795.00 Owner Name: LEONID GLAVATSKIY Owner Address: 2042 S 312TH ST FEDERAL WAY WA 98003 Building Official Permit # 20-101779-00-SF #3 #4 Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises. CITY OF Federal Way PERMIT #: 20 101779 00 THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Address: 2044 S 312TH ST Project: LEONID GLAVATSKIY FEDERAL WAY WA 98003-4918 Scheduled inspections may be failed if this card is not on -site. DO tiOT LOSE: 1111S CAM). Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. SWM Precon Site Mtg (4400) ❑ Initial Erosion Control (4365) ❑ Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By Date ❑ Foundation Wall (4115) Drainage/Downspout (4040) ❑ Plumbing Groundwork (4190) Approved to place concrete Approved to backfill Approved to cover By Date By [_, Date By Date El Slab/Concrete Floor (4255) ❑ Underfloor Framing (4285) ❑ Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date Shear Walls (4245) ❑ Roof Sheathing (4220) ❑ Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved By Date By Date By Date ❑ Mechanical Rough -in (4165) I t Gas Piping (4125) ❑ Fire/Draft Stops (4095) Approved Approved to release test Approved By Date By Date By Date l;, Interim Erosion Control (4370) Prior to scheduling a Framing inspection; ❑ Framing (4120) Approved Electrical, Plumbing & Mechanical Rough -in Approved to insulate and Fire/Draft Stop inspections must be signed - By Date ot'f and approved. IBC 109.3.4 By Date I5 Gypsum Wallboard Nailing (4130) ? Final Erosion Control (4375) El Insulation (4150) Approved to install wallboard Approved to install mud & tape Approved By Date By Date By Date I Final - Mechanical (4065) ❑ Final - Plumbing (4075)s Final - Building (4050) Approved Approved Approved By Date By Date By Date ® Rough Electrical ❑ Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date