Loading...
21-100544r City of Federal Way nu Conu Development Dept FILE 33 Ave 33; Federal Way,y, WA 93003 W Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BROOKS Project Address: 32012 41ST AVE SW Project Description: 13 can lights, 15 outlets, 4 wall heaters, smoke alarm Electrical Permit #:21-100544-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 873190 2710 Owner Applicant Contractor DAMES BROOKS BONNIE BROOKS OWNER 32012 41ST AVE SW 34930 S 30TH AVE AVE 98003 OWNER FEDERAL WAY WA 98023 FEDERAL WAY WA 98003 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml 4 Circuits - Residential 3 Low Voltage - Fine Alarm (Re: 1 PERMIT EXPIRES Friday, 11 February, 2022 Permit Issued on Thursday, February 11, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: A4%� THIS CARD 1S TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 100544 00 Address: 32012 41ST AVE SW Project: BONNIE BROOKS FEDERAL WAY WA 98023-2402 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 UFER Ground (4295) 0 Ditch cover (4030) 0 Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding (4195) Q Temporary Power (4275) El Service (4235) Approved Approved Approved By Date By Date By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date