Loading...
22-101832Mcclitinical City of Federal Way Community Development Dept. `�LE 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 83572609 Project Name: SINGH Project Address: 2333 S 280TH PL Project Description: Replace gas furnace Permit #:22-101832-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 326080 0220 Owner Applicant Contractor JOGINDER SINGH HANI TOBIAALPHA HEATING & A/C INC ALPHA HEATING & A/C INC 2333 S 280TH PL 5716 149 AVE SE ALPHAHA976PS (10/10/23 FEDERAL WAY WA 98003-2931 BELLEVUE WA 98006 5716 149TH AVE SE BELLEVUE WA 98006 Mechanical Work Valuation? Furnaces Additional Permit Information 4000 Is this an Online or O.T.C. application? .................. Yes Mechanical Fixtures PERMIT EXPIRES Tuesday, 18 October, 2022 Permit Issued on Thursday, April 21, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: UIN iN K-1 nA - THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 101832 00 Address: 2333 S 280TH PL Project: JOGINDER SINGH FEDERAL WAY WA 98003-2931 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Mechanical Rough -in (4165) 0 Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By ��✓G?� Date, Rough Electrical Final Electrical F1Right of Way Approved Approved Approved By Date By Date By Date