Loading...
21-104081City of Federal Way Community Development Dept, 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Electrical Permit #:21-104081-00-EL Inspection Request Line: (253) 835-3050 Project Name: EAST CAMPUS CORPORATE PARK Project Address: 32001 32ND AVE S 1V 30� Parcel Number: 215465 0010 Project Description: Expanding an existing Continental panel for one single door. Owner _Applicant Contractor STERLING REALTY ORGANIZATION JARED MARKEWICZPROTECTION & PROTECTION & COMMUNICATIONS 777 108TH AVE NE COMMUNICATIONS INC INC BELLEVUE WA 98052 19630 40TH AVE W PROTECI165L8 (5/31/23) LYNNWOOD WA 98036 19630 40TH AVE W LYNNWOOD WA 98036 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Low Voltage - Other (Commel 2 PERMIT EXPIRES Friday, 30 September, 2022 Permit Issued on Thursday, September 30, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of h. KIE[Nrz deral Way. Owner or agent: Date: CITY or Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 104081 00 Address: 32001 32ND AVE S Project: STERLING REALTY ORGANIZATII FEDERAL WAY WA 98001-9625 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE 'I HIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 UFER Ground (4295) Ditch cover (4030) s❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ® Pool Bonding (4195) 5❑ Temporary Power (4275) ® Service (4235) Approved Approved Approved By Date By Date By Date 0 Feeders/Sub-panels (4045) ® Rough Electrical (4225) ® Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date tU Final - Electrical (4055) A pronod By Date o<n Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date