Loading...
18-104281 (2)City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: KURIA Project Address: 31228 8TH AVE S Building - Single Family Permit #:18-104281-,00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 858800 0135 Project Description: ADD - Construction of 1100 square foot addition to the existing single family residence. Plumbing and Mechanical included. Owner Applicant Contractor Lender JOSEPH KURIA JOSEPH KURIA OWNER IS CONTRACTOR OWNER IS LENDER 31228 8TH AVE S 31228 8TH AVE S FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 Census Category: 434 - Residential alt/add - no change in number of units Includes: # 1 #2 #3 44 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 0.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 1100 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Basement .................... 0 New / Additional Sq. Feet - Deck ........................... 0 Mechanical to be Included? ..................................... Yes Mechanical Work Valuation? .................................. 10000 New / Additional Sq. Feet - Other ........................... 0 Plumbing to be Included? ........................................ Yes Occupancy #I -Use ................................................ Residence (1 or 2 family) Total Valuation: 132,825.00 New / Additional Sq. Feet - 2nd Floor .................... 0 Occupancy #1 - Area (Sq. Feet) .............................. 0 Occupancy #1 - Construction Type ......................... Type V - B New / Additional Sq. Feet - Garage ........................ 0 Plumbing Work Valuation? ..................................-, 10000 Number of Stories ................................................... I Is this an Online or O.T.C. application? .................. No New / Additional Sq. Feet - Total ........................... 1100 Comprehensive Plan Designation ........................... SF - High -Density Residential Mechanical Fixtures Ducting 1 Fans 1 Plumbing Fixtures Lavatories 1 Showers 1 Water Closets 1 PERMIT EXPIRES Sunday, 12 May, 2019 Permit Issued on Tuesday, November 13, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and th use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. c � Owner or agent: Date: 1 eTHIS CARD IS TO REMAIN ON -SITE FConstruction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 18 104281 00 Address: 31228 8TH AVE S Project: JOSEPH K KURIA FEDERAL WAY WA 98003-5301 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. SWM Precon Site Mtg (4400) Q Initial Erosion Control (4365) Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By 4�J Date t ( 30 D Foundation Wall (4115) Approved to place concrete By AI J Date � El Drainage/Downspout (4040) Approved to backfill By Date ® Plumbing Groundwork (4190) Approved to cover By Date 7❑ Slab/Concrete Floor (4255) ® Underfloor Framing (4285) 9 Floor Sheathing (4105) By Approved to place concrete Date By Approved to sheath floor Date _ Approved to install flooring J By Date S Shear Walls (4245) of Sheathing (4220) Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved By Date — c_,_ By ; 14.1�Date By Date L — 1�k E131 By Mechanical Rough -in (4165) Approved Date 14 By Gas Piping (4125) Approved to release test Date 9b By Fire/Draft Stops (4095) Approved Date El Interim Erosion Control (4370) Prior to scheduling a Framing inspection; 77 Framing (4120) Approved Electrical, Plumbing & Mechanical Rough -in Approved to insulate and Fire/l graft Stop inspections must be signed - By Date off and approved. IBC 109.3.4 By Date is Insulation (4150) 19 Gypsum Wallboard Nailing (4130) 0 Final Erosion Control (4375) Approved to install wallboard Approved to install mud & tape Approved By A kJ Date 15 ) By Date By Date a 1 Final - Mechanical (4065) z2 Final - Plumbing (4075) Final - Building (4050) Approved Approved Approved By Date By Date By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date