TRAFFIC CONCURRENCY INFORMATION
What is a Concurrency Application?
The City uses the concurrency application to look at new development's impact on the transportation network. The
purpose of the test is to verify if there is adequate capacity in the transportation network and identify possible
mitigation for failing intersections. The test uses the City's adopted level of service standards (LOS) as identified
in the Comprehensive Plan as a basis for determining whether new development can proceed. Concurrency
application is required for all development permits within the city that generate new trips in the PMpeak hour,
except for development exempt under FWRC 19.90.060 of the Transportation Concurrency Management
Ordinance. All new development must pass concurrency test before completing other land use processes.
When is a Concurrency Application Required?
An application must be submitted concurrent with a development activity permit application such as Land Use
application. The City will perform the concurrency analysis on a first come first serve basis. The applicant may
request a concurrency feasibility analysis at any time. However, since a concurrency feasibility analysis
application is not tied to a development permit, a Capacity Reserve Certificate (CRC) will not be issued.
What needs to be submitted with the Concurrency Application?
Completed Concurrency Application and Fees
To scale site plan
e5 Vicinity map
6 Independent Trip Generation to be considered (if available).
All required information in the Concurrency Application must be filled out or the application will be returned.
Traffic Division staff will review the completeness of the applicat ion and contact the applicant if further
h?formation is needed. The application will be vested at the time the Concurrency Application is deemed
complete.
How much is my concurrency permit application fees? And when do I pay this fee?
Application fees for the concurrency application will be based on the total new trips the development is estimated
to generate. The Public Works Department uses information provided (project size and land use type) in the pre -
application application to estimate the number of trips and the appropriate application fee as outlined in Table 1
below. Concurrency permit application fees must be paid concurrent with the underlying land use application
submittal. This fee may change if the proposed development is significantly different than the project scope as
provided in the preapplication application. At the applicant's discretion, the applicant may hire their own
Engineer licensed in the State of Washington to calculate the trip generation.
Table 1 — 2019 FW Concurrency Application Fee
Net New PM Peak Hour Trips Less than 10 11 - 50 51 - 500 Greater Than
500
Total Concurrency $1,900.00 $5,451.00 $9,972.00 $15,985.00
Application Fee (2022 rates)
Am I finished with this process after I paid the concurrency permit application fee?
No. The concurrency review process is the first phase of your development project's process with the Public
Works Department. Once staff has completed the concurrency analysis, the applicant and/or owner will be
notified of the result (Pass or Fail). If the project "Passes" the concurrency test, staff will issue a Capacity
Reserve Certificate (CRC) allowing the project to proceed to other applicable development permit processes.
If the project "Fails" the concurrency test, staff will propose mitigation measure(s) to address the LOS
failure at that particular intersection(s). Examples of potential mitigation measures could be:
Construct turn lanes
Modify or construct a new traffic signal
Other traffic control measures (such as channelization improvements)
The applicant has 30 calendar days to review and response to staff proposed mitigation. Within that period,
the applicant must either accept staff recommended mitigation or propose alternative mitigation measures for
any LOS failure. Once an agreement has been reached on the mitigation measures, staff will issue a
Capacity Reserve Certificate (CRC), allowing the project to proceed with other applicable permit processes.
However, if the applicant fails to respond with the 30 days period, a "Denial" letter will be issue and the
project will not be approved.
If my project fails the concurrency test, what are my options?
1. Accept staff proposed mitigation measure(s),
2. Reduce the size of the development or change the type of uses to reduce the trip generation rate until
the standard is met;
3. Delay the application until additional improvements have been identified by the City in the 6-Year
(TIP) or constructed by others;
4. Propose appropriate mitigation to include Transportation Demand Management (TDM) measures.
The proposed mitigation measures shall be constructed and approved concurrent with the
development, typically prior to issuance of a certificate of occupancy.
Depending on what option is chosen, the applicant may have to restart the concurrency application process
again.
Can I appeal the Concurrency Denial Notice?
Yes. The applicant may appeal the concurrency denial notice as part of the appeal process for the
underlying Development Permit application.
How long does a Capacity Reserve Certificate last?
As long as there is activity on the Development Permit and you do not change the trip generation
characteristics of the development (no increase in net new trips is incurred from a change in the project), the
CRC Certificate vests the development's new trips for the life of the project. If the project's size changes
significantly as determine by the Public Works Department staff, the applicant may need to go through the
process again and pay another concurrency application fee.
What if my project changes?
Any thing that changes the trip generation rates can generate a need for an amendment to the process, and
this process may start over. If the trip generation is greater than 10% of the original estimated trip generated
rates the project will require an amendment and the process starts over. Please be conservative and as
specific about your project as you can. If you have any questions please ask.
What if I do not have a development permit ready for my project?
Staff can provide the same level of analysis as a feasibility study for the project. However, the estimated
trips generated by the project analyzed will not be reserved or vested. If you decide to proceed with the
project, staff will revise the analysis using any transferable data at our hourly rate.
Does this mean we will never have to prepare a Traffic Impact Analysis?
No. The Public Works staff will calculate your trips and identity impacts to the City Transportation
system. The following are examples of additional requirements the applicant may need to hire an
Engineer to complete:
Parking Demand and Utilization
Queuing and gap analysis
Specialized Land Use and Trip Generation
• Sight Distance Analysis
Neighborhood Traffic Impacts
• Design of Mitigation Improvements (such as signals, turn lanes, access, or newroads)
• Traffic impacts over 100 trips in other peak hours (morning and weekends)
What is the Concurrency Permit Process?
A flow chart diagram of the process is depicted on the back page. If you have any additional questions,
please contact Sarady Long, Senior Transportation Planning Engineer (253) 835-2743 or
sarady.long@cityoffederalway.com.
CONCURRENCY PERMIT PROCESS
PASSED
r4- - - - - --
t
1
I
I
9
1'
I
4
I!
7
(START)- Applicant submit
Concurrency application with
appropriate fee
CITY * performs trip
generati onlassrgnment
CITY * performs
cwncurrncv attalYsi s
l--- -- _ - -- -�--A
i
1
r
r
1
1
1
r
a
1
Concurrency FAIL I
Result 1
I
I
1
1
CITY * proposes
mitigation for 1
failing intersecti on s I
I
I
I
CITY issues YES
Concurrency Reserve f
I
I
I
I
Applicant 1
accepts
mitigation?` 1
1
1
I
t
I
Applicant
I C1TV issues f :. proposes Y ESQ
To Development Denial letter 'alterna'alternativeltcative
Permit process mitigation
.1
* Denotes tasks that may be prepared by the applicant. Staff reviews and approves all applicant -prepared materials.
0" e0
Federal Way
C nevri,d on Opportwwfy
PUBLIC WORKS DEPARTMENT
33325 86' Avenue South
Federal Way WA 98003-6325
253-835-2700;Fax 253-835-2709
wivw.cit voffederalway.com
2022 TRAFFIC CONCURRENCY REVIEW APPLICATION
APPLICATION NO(s) Date
Project Name Plant 2 Relocation
Property Address/Location 35000 & 35050 Pacific Hwy S
Parcel Number(s) 202104-9043; 9155; 9463; 9162
March 2022
Project Description New concrete plant and associated equipment, conveyor, scale, aggregate storage silos.
Demolish existing buildings and construct a new ol tice,sliop/storage building and site
improvements. Adjust interior parcel boundary lines.
PROPERTY OWNER
Name: 35000 Pacific Hwy South LLC Phone/Fax: 253-278-0237
Address: PO Box 94176
City/State/Zip: Seattle WA 98124-6476
Email: stevec@corlissco.com
Cell: 253-278-0237
Signature:
Stagy C I .&I,
firrutn.Hn t ttl u111erent tnan vwnerJ
Name:
Phone/Fax:
Address:
City/State/Zip:
Email:
Cell:
Signature:
Type of Development permit to be applied for:
a Commercial
❑ Single Family (SF)
❑ Multifamily (MF) ❑ Subdivision ❑ Short Subdivision
None (Feasibility only) ❑ Other
Approval for City to perform Concurrency analysis: 3 Yes ❑ No
If NO: Applicant's Traffic Engineer must perform Concurrency analysis consistent with City procedures; however, the
application fee remains the same.
Required Information — Application is incomplete and will be returned if not filled out.
Gross Square Feet (Commercial) Existing 4,404 Proposed_ 17,006
Number of Dwelling Units Existing 0 Proposed 0 _
Number of Employees Existing 2 Proposed. 2
Parcel size (acres or square footage) Existing 4.19 acres Proposed 4.19 acres
Has the property previously been reviewed for concurrency? Yes not known No
If yes, date of original application
Is this an amendment to an existing Concurrency Certificate?
Will the project be phased? No
Development Build -Out Year 2022
Concurrency Permit No: _
Yes No
Note: Commercial subdivisions and other projects constructed in phases shall be evaluated for concurrency as each phase is submitted
for applicable development permits.
- Once the concurrency test result has been determined, any changes to the development project require additional review will be
billed on an hourly basis.
Estimated Number of New Trip Generated by Project per Pre -application Summary: 18
If the applicant's engineer has prepared a trip generation analysis, please provide the following. If not, staff will calculate
the trip generation based on the above information.
Existing PM Peak Hour Trips (if applicable)
Proposed PM Peak Hour Trips
Net New PM Peak Hour Trips
13
1Z
CONCURRENCY TEST EXPIRATION (FWRC 19.901
A Concurrency Reserve Certificate (CRC) is valid until the underlying development permit expires, is withdrawn or
cancelled, whichever occurs first. In that case, a new concurrency application wouldberequired.
A Concurrency Reserve Certificate is valid only for the specific development approval consistent with the
development parameters and City file number within the CRC issued.
A Concurrency Reserve Certificate (CRC) runs with the land, and cannot be transferred to a differentparcel.
I have read the above information regarding expiration deadlines. I further understand that issuance of a concurrency certificate is
not a guarantee that the City will issue a development permit or building permit.
sue.. C1.91-11
Property Owner/Agent Signature
M a r 8, 2022
Date
SUBMITTAL REQUIREMENTS — STAFF USE ONLY
Permit Submittal: The following items are required for all applications:
o Completed and signed Concurrency Application
o Concurrency Application Fee paid (See Below)
Net New PM Peak Hour Trip Less than 10 11 - 50 51 - 500 Greater than 500+
2022 Application Fee $1,900.00
$5,451.00
$9,972.00
$15,985.00