22-102749-UP-Parking Study-06-15-2022-V1Date: June 3, 2022 To: Sloan Clack Corliss Management Group LLC c/o Ms. Colleen Harris Apex Engineering From: Peyton Whalen, Transportation Planner Subject: Plant 2 Relocation Parking Assessment The intent of this memo serves to provide a parking assessment for the proposed Plant 2 Relocation development. PROJECT DESCRIPTION The Plant 2 Relocation development proposes to relocate the existing concrete plant to a neighboring location as depicted in Figure 1 below. As illustrated, the existing plant location is outlined in red and the proposed location in blue. The proposed subject site is bordered to the west by SR-99 (Pacific Highway S) and to the south by S 351st Street. The site is located on a cumulative 4.19-acres within tax parcel #’s: 2021049-163; -155; -043; & -162. All existing on-site structures and uses would be eliminated prior to new construction. Access is proposed to eliminate two of the three existing curb cuts along SR-99 while maintaining a central driveway and a single access to the south via S 351st Street. The access on SR-99 would be restricted to right- turns only given the continuous raised median along SR-99. A total of 4 parking stalls are proposed on-site. Figure 2 presents the conceptual site plan and access locations. Existing Plant Proposed Location Figure 1: Vicinity Map Plant 2 Relocation Parking Assessment PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com Heath & Associates 1/3 HEATH & ASSOCIATES, INC Transportation Planning & Engineering Figure 2: Site Plan Plant 2 Relocation Parking Assessment PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com Heath & Associates 2/3 CITY PARKING REQUIREMENTS Per the City of Federal Way Municipal Code Chapter 19.240.040, required on-site parking spaces for gravel batch plants are determined on a case-by-case basis. Therefore, Batch Plant 2 characteristics are proposed to be analyzed to generate a site-specific parking demand estimation to determine if the 4 proposed on-site stalls will satisfy demands. Descriptions of site characteristics including operations data, employee counts and anticipated on-site staff scheduling are provided in the following section. SITE CHARACTERISTICS & ESTIMATED PARKING DEMAND To quantify parking demands associated with the proposed development, site characteristics were analyzed. All customers visiting the site are anticipated to do so via concrete trucks. Customers will not be permitted to depart their vehicle and will stage on-site in designated locations to load. As such, customers will not require parking stalls given the controlled nature of their site visit. The plant is anticipated to typically operate from 6:00 AM – 5:00 PM. Two full-time employees will manage operations on-site during these hours. Moreover, the site may occasionally operate for 24-hour period when necessitated by construction demands. Assuming a shift change that may result in an overlap of staff on-site, four employees may be on-site concurrently for a brief duration as two staff depart and two arrive. To provide a conservative estimation, it is anticipated that each employee would drive to work and require a parking stall. Therefore, a maximum of four estimated employees on-site (albeit for a very short duration) would yield an on-site demand of four parking stalls at a given time. As such the development proposal comprising four parking stalls on-site is anticipated to satisfy parking demands based on the outlined site characteristics and operations. CONCLUSION The Plant 2 Relocation proposes to relocate operations from 35053 16th Avenue S to the west on a similar sized area totaling 4.19-acres comprised within four tax parcels. A total of four parking stalls are proposed on-site. Based on City of Federal Way Municipal Code, on-site parking requirements are to be determined on a case-by-case basis. As outlined herein this report, the maximum anticipated number of employees on-site in addition to customer operations will yield a maximum parking demand of four stalls. Overall, parking is anticipated to sufficiently be met given an analysis of proposed site characteristics and operations. No parking deficiencies are identified as a result of the proposed development. Please call if you require additional information. Peyton Whalen, Transportation Planner Plant 2 Relocation Parking Assessment PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com Heath & Associates 3/3