Loading...
22-103340City of Federal Way Community Development Dept. FILE 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: NINTH AVE CENTER, Unit A-4 Project Address: 34004 9TH AVE S Project Description: 50 amp car charger Electrical Permit #:22-103340-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 926480 0110 Owner Applican I Contractor BKM FEDERAL WAY SOUTH 246 LLC DOUGLAS OWENBLAZE ELECTRIC & BLAZE ELECTRIC & SRVC CO INC 1701 QUAIL ST SERVICE CO INC BLAZEES0101`8 (10/28/23) NEWPORT BEACH CA 92660 209 S 125TH ST 209 125TH ST S TACOMA WA 98444 TACOMA WA 98444 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical fixtures Circuits - Commercial 1 PERMIT EXPIRES Saturday, 21 January, 2023 Permit Issued on Monday, July 25, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the°City of Federal Way. Owner or agent: Date: AS, CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 103340 00 Address: 34004 9TH AVE S Unit A-4 Project: BKM FEDERAL WAY SOUTH 246 L FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. UFER Ground (4295) 0 Ditch cover (4030) 0 Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding (4195) ® Temporary Power (4275) 0 Service (4235) Approved Approved Approved By Date By Date By Date Q Feeders/Sub-panels (4045) ® Rough Electrical (4225) 0 Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date 1e Final - Electrical (4055) Approved By Date;► Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date