Loading...
21-104778-Permit FinalCity of Federal Way Community Development Dep4 33325 8th Ave 5 Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: TAJI ADULT FAMILY HOME Project Address: 35436 12TH AVE SW Project Description: BLUEBEAM - Construction of ramp. Building - Single Family Permit #:21-104778-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 257180 0025 Owner Applicant Contractor Lender JOSEPH MWANGITAJI ADULT JOSEPH MWANGITAJI ADULT OWNER IS CONTRACTOR FAMILY HOME FAMILY HOME 35341 13TH WAY SW 35341 13TH WAY SW FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 Census Category: 434 - Residential alt/add - no change in number of units Includes: # 1 #2 #3 #4 Occupancy Class: Construction T e: Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Mechanical to be Included? ..................................... No Number of Stories................................................... I Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ....................................... I No Comprehensive Plan Designation ........................... SF - High -Density Zoning Designation................., .... RS 7.2 ........:................. . Residential Total Valuation: 2,500.00 No Fixtures Associated With This Permit 11 PERMIT EXPIRES Sunday, 19 June, 2022 Permit Issued on Tuesday, December 21, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Was,Iirtgt 0 d t 9 h5 of Federal Way. Owner or a ent:� Date: A14%, THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 104778 00 Address: 35436 12TH AVE SW Project: JOSEPH MWANGI FEDERAL WAY WA 98023-6912 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. SWM Precon Site Mtg (4400) 2❑ Initial Erosion Control (4365) I? I Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By Date Q Foundation Wall (4115)❑ Drainage/Downspout (4040) Slab/Concrete Floor (4255) Approved to place concrete Approved to backfill Approved to place concrete By Date By Date By Date Q Underfloor Framing (4285) ® Floor Sheathing (4105) Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date to Roof Sheathing (4220) 1i' Fire/Draft Stops (4095) 73 Interim Erosion Control (4370) Approved to install roofing Approved Approved By Date By Date By Date E scheduling a Framing inspection; 13 Framing (4120) 14 Insulation (4150) Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard aft Stop inspections must be signed - and approved. IBC 109.3.4 By Date By Date 15 Gypsum Wallboard Nailing (4130) 16 Final Erosion Control (4375) i7 Final - Building (4050) Approved to install mud & tape Approved Approved By Date By Date By Date ?iZ EJ Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date