21-104778-Permit FinalCity of Federal Way
Community Development Dep4
33325 8th Ave 5
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: TAJI ADULT FAMILY HOME
Project Address: 35436 12TH AVE SW
Project Description: BLUEBEAM - Construction of ramp.
Building - Single Family
Permit #:21-104778-00-SF
Inspection Request Line: (253) 835-3050
Parcel Number: 257180 0025
Owner
Applicant
Contractor
Lender
JOSEPH MWANGITAJI ADULT
JOSEPH MWANGITAJI ADULT
OWNER IS CONTRACTOR
FAMILY HOME
FAMILY HOME
35341 13TH WAY SW
35341 13TH WAY SW
FEDERAL WAY WA 98023
FEDERAL WAY WA 98023
Census Category: 434 - Residential alt/add - no change in number of units
Includes:
# 1
#2
#3
#4
Occupancy Class:
Construction T e:
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
Mechanical to be Included? ..................................... No Number of Stories................................................... I
Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ....................................... I No
Comprehensive Plan Designation ........................... SF - High -Density Zoning Designation................., .... RS 7.2
........:................. .
Residential
Total Valuation: 2,500.00
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Sunday, 19 June, 2022
Permit Issued on Tuesday, December 21, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Was,Iirtgt 0 d t
9 h5
of Federal Way.
Owner or a ent:� Date:
A14%, THIS CARD IS TO REMAIN ON -SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 21 104778 00 Address: 35436 12TH AVE SW
Project: JOSEPH MWANGI FEDERAL WAY WA 98023-6912
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
SWM Precon Site Mtg (4400)
2❑
Initial Erosion Control (4365)
I? I
Footings/Setback (4110)
Approved
To be done PRIOR to breaking ground
Approved to place concrete
By
Date
By
Date
By
Date
Q
Foundation Wall (4115)❑
Drainage/Downspout (4040)
Slab/Concrete Floor (4255)
Approved to place concrete
Approved to backfill
Approved to place concrete
By
Date
By
Date
By
Date
Q
Underfloor Framing (4285)
®
Floor Sheathing (4105)
Shear Walls (4245)
Approved to sheath floor
Approved to install flooring
Approved to install siding
By
Date
By
Date
By
Date
to
Roof Sheathing (4220)
1i'
Fire/Draft Stops (4095)
73
Interim Erosion Control (4370)
Approved to install roofing
Approved
Approved
By
Date
By
Date
By
Date
E
scheduling a Framing inspection; 13 Framing (4120) 14 Insulation (4150)
Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard
aft Stop inspections must be signed -
and approved. IBC 109.3.4 By Date By Date
15
Gypsum Wallboard Nailing (4130)
16
Final Erosion Control (4375)
i7
Final - Building (4050)
Approved to install mud & tape
Approved
Approved
By
Date
By
Date
By
Date ?iZ
EJ
Rough Electrical
0
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date