20-103073-Permit FinalCity of Fed=,ep'2609
Comnnmily DevFILE
33325 8t
Federal Way,
Ph: (253) 835-2607 F
Project Name: ARKHIPCHUK
Project Address: 35430 4TH AVE SW
Building - Single Family
Permit #:20-103073-00-SF
Inspection Request Line: (253) 835-3050
Parcel Number: 738700 0010
Project Description: BLUEBEAM - Construction of a 3314 square foot 2-story single family residence with a 38
square foot covered entry, a 292 square foot deck and a 603 square foot attached garage.
Includes plumbing and mechanical.
***4 Bedrooms; $550,000 Estimated Selling Price***
Owner.
Applicant
Contractor
Lender
RUSLAN ARKHIPCHUK
PAVEL MELNIKURBAN DESIGN
OWNER 1S CONTRACTOR
OWNER IS LENDER
34930 27TH AVE S
GROUP
FEDERAL WAY WA 98003
PO BOX 58906
TUKWILA WA 98138
Census Category: 101 - New Single Family House
Includes:
# 1
#2
#3
#4
Occu anc Class:
R-3
Construction Type-,
Type V - B
Occupancy Load:
Floor Area (sq. ft.)
3,314.00
Additional Permit Information
New / Additional Sq. Feet - 1st Floor .....................
1431
New / Additional Sq. Feet - 3rd Floor .....................
0
New / Additional Sq. Feet - Basement ....................
0
Occupancy # 1 - Construction Type .................. „
Type V - B
New / Additional Sq. Feet - Garage ........................
603
Plumbing Work Valuation? .....................................
10000
Number of Stories ...................................................
2
Plumbing to be Included? ........................................
Yes
Will Certificate of Occupancy be Issued? ...............
Yes
New / Additional Sq. Feet - 2nd Floor.. .................. 1883
Occupancy 91 - Area (Sq. Feet) ....................
3314
BasicPlan?...........................................................
No
New / Additional Sq. Feet - Deck ...........................
254
Mechanical to be Included? .....................................
Yes
Mechanical Work Valuation?.................................1
10000
New / Additional Sq. Feet - Other................ ..........
38
New / Additional Sq. Feet - Total .........................-
4209
Occupancy 41 - Use ............................ ......,
Residence (1 or 2
Comprehensive Plan Designation ........................... SF - Iligh-Density Zoning Designation......
Residential
Total Valuation: 436,593.66
Mechanical Fixtures
Ducting
Furnaces
Hot Water Tanks
Bathtubs
Lavatories
Water Closets
1 Fans
1 Gas Piping
1
Plumbing Fixtures
2 Dishwashers
6 Showers
5 Hose Bibbs
CONDITIONS:
7 Fireplace Inserts
1 Gas Pipe Outlets
1 Laundry Washer Outlets
4 Sinks
2
Fire conditions:
Fire sprinklers are required.
No framiaL, inspection until the fire sprinkler permit is submitted and approved for cover.
family)
RS 9.6
1
4
I
A separate Permit is required for the fire sprinkler plans.
PERMIT EXPIRES Sunday, 4 July, 2021
Permit Issued on Tuesday, January 5, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent:
City of Federal Way
Certificate of Occupancy
Date:
This Certificate issued pursuant to the requirements of Section III of the International Building Code or Section
R110 of the International Residential Code is certifying that at the time of issuance, this structure was in
compliance with the various ordinances of the City regulating building construction or use. This certificate is valid
ONLY when endorsed by City staff.
Tenant Name: ARKHIPCHUK
Address: 35430 4TH AVE SW
Permit # 20-103073-00-SF
Includes: #1 #2 #3 #4
Occupancy Class: R-3
Construction Type: Type V - B
Occupancy Load:
Floor Area (sq. ft.) 3,314.00
Owner Name: RUSLAN ARKHIPCHUK
Owner Address: 34930 27TH AVE S
FEDERAL WAY WA 98003
r
Building
ate
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most severely affect the health and safety of the general public. Although the City has made as complete
a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees
nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises.
_Nt�
CITY Of -
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 20 103073 00 Address: 35430 4TH AVE SW
Project: RUSLAN ARKHIPCHUK FEDERAL WAY WA 98023
Scheduled inspections maybe failed if this card is not on -site. DO NOT LOSE 'I'I l IS CAIII). Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0
By
SWM Precon Site Mtg (4400)
Approved
Date
By
Initial Erosion Control (4365)
To be done PRIOR to breaking ground
Date
❑
By
Footings/Setback (4110)
Approved to place concrete
Date
LI
By
Drainage/Downspout (4040)
Approved to backfill
Date
❑
By
Plumbing Groundwork (4190)
Approved to cover
Date
El Foundation Wall (4115)
Approved to place concrete
By Date
❑ Underfloor Framing (4285)
Approved to sheath floor
By Date
❑
By
Floor Sheathing (4105)
Approved to install flooring
Date
❑ Slab/Concrete Floor (4255)
Approved to place concrete
By Date
ED
By
Shear Walls (4245)
Approved to install siding
Date
❑
By
Roof Sheathing (4220)
Approved to install roofing
Date
❑
By
Rough Plumbing (4230)
Approved
Date
❑ Gas Piping (4125)
Approved to release test
By Date
❑
By
Fire/Draft Stops (4095)
Approved
Date
❑ Mechanical Rough -in (4165)
Approved
By Date
❑
By
Interim Erosion Control (4370)
Approved
Date
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in
and Fire/Draft Stop inspections must be signed -
off and approved. IBC 109.3.4
17
By
Framing (4120)
Approved to insulate
Date
Insulation (4150)
El
Gypsum Wallboard Nailing (4130)
Final Erosion Control (4375)
Approved to install wallboard
Approved to install inud & tape
Approved
By
Date
By
Date
By
Date
El
Final - Mechanical (4065)
❑
Final - Plumbing (4075)
Final - Building (4050)
Approved
Approved
JfBy
Approved
By
Date
By
Date
Ai Date /�I .2
❑
Rough Electrical
❑
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date