Loading...
20-103073-Permit FinalCity of Fed=,ep'2609 Comnnmily DevFILE 33325 8t Federal Way, Ph: (253) 835-2607 F Project Name: ARKHIPCHUK Project Address: 35430 4TH AVE SW Building - Single Family Permit #:20-103073-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 738700 0010 Project Description: BLUEBEAM - Construction of a 3314 square foot 2-story single family residence with a 38 square foot covered entry, a 292 square foot deck and a 603 square foot attached garage. Includes plumbing and mechanical. ***4 Bedrooms; $550,000 Estimated Selling Price*** Owner. Applicant Contractor Lender RUSLAN ARKHIPCHUK PAVEL MELNIKURBAN DESIGN OWNER 1S CONTRACTOR OWNER IS LENDER 34930 27TH AVE S GROUP FEDERAL WAY WA 98003 PO BOX 58906 TUKWILA WA 98138 Census Category: 101 - New Single Family House Includes: # 1 #2 #3 #4 Occu anc Class: R-3 Construction Type-, Type V - B Occupancy Load: Floor Area (sq. ft.) 3,314.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 1431 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Basement .................... 0 Occupancy # 1 - Construction Type .................. „ Type V - B New / Additional Sq. Feet - Garage ........................ 603 Plumbing Work Valuation? ..................................... 10000 Number of Stories ................................................... 2 Plumbing to be Included? ........................................ Yes Will Certificate of Occupancy be Issued? ............... Yes New / Additional Sq. Feet - 2nd Floor.. .................. 1883 Occupancy 91 - Area (Sq. Feet) .................... 3314 BasicPlan?........................................................... No New / Additional Sq. Feet - Deck ........................... 254 Mechanical to be Included? ..................................... Yes Mechanical Work Valuation?.................................1 10000 New / Additional Sq. Feet - Other................ .......... 38 New / Additional Sq. Feet - Total .........................- 4209 Occupancy 41 - Use ............................ ......, Residence (1 or 2 Comprehensive Plan Designation ........................... SF - Iligh-Density Zoning Designation...... Residential Total Valuation: 436,593.66 Mechanical Fixtures Ducting Furnaces Hot Water Tanks Bathtubs Lavatories Water Closets 1 Fans 1 Gas Piping 1 Plumbing Fixtures 2 Dishwashers 6 Showers 5 Hose Bibbs CONDITIONS: 7 Fireplace Inserts 1 Gas Pipe Outlets 1 Laundry Washer Outlets 4 Sinks 2 Fire conditions: Fire sprinklers are required. No framiaL, inspection until the fire sprinkler permit is submitted and approved for cover. family) RS 9.6 1 4 I A separate Permit is required for the fire sprinkler plans. PERMIT EXPIRES Sunday, 4 July, 2021 Permit Issued on Tuesday, January 5, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: City of Federal Way Certificate of Occupancy Date: This Certificate issued pursuant to the requirements of Section III of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: ARKHIPCHUK Address: 35430 4TH AVE SW Permit # 20-103073-00-SF Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 3,314.00 Owner Name: RUSLAN ARKHIPCHUK Owner Address: 34930 27TH AVE S FEDERAL WAY WA 98003 r Building ate The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises. _Nt� CITY Of - Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 103073 00 Address: 35430 4TH AVE SW Project: RUSLAN ARKHIPCHUK FEDERAL WAY WA 98023 Scheduled inspections maybe failed if this card is not on -site. DO NOT LOSE 'I'I l IS CAIII). Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 By SWM Precon Site Mtg (4400) Approved Date By Initial Erosion Control (4365) To be done PRIOR to breaking ground Date ❑ By Footings/Setback (4110) Approved to place concrete Date LI By Drainage/Downspout (4040) Approved to backfill Date ❑ By Plumbing Groundwork (4190) Approved to cover Date El Foundation Wall (4115) Approved to place concrete By Date ❑ Underfloor Framing (4285) Approved to sheath floor By Date ❑ By Floor Sheathing (4105) Approved to install flooring Date ❑ Slab/Concrete Floor (4255) Approved to place concrete By Date ED By Shear Walls (4245) Approved to install siding Date ❑ By Roof Sheathing (4220) Approved to install roofing Date ❑ By Rough Plumbing (4230) Approved Date ❑ Gas Piping (4125) Approved to release test By Date ❑ By Fire/Draft Stops (4095) Approved Date ❑ Mechanical Rough -in (4165) Approved By Date ❑ By Interim Erosion Control (4370) Approved Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 17 By Framing (4120) Approved to insulate Date Insulation (4150) El Gypsum Wallboard Nailing (4130) Final Erosion Control (4375) Approved to install wallboard Approved to install inud & tape Approved By Date By Date By Date El Final - Mechanical (4065) ❑ Final - Plumbing (4075) Final - Building (4050) Approved Approved JfBy Approved By Date By Date Ai Date /�I .2 ❑ Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date