21-100167-Permit FinalCity of Federal Way
Conwumity Development Dept.
33325 801 Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: CHERNIKOV
Project Address: 523 SW 316TH PL
Building - Single Family
Permit #:21-100167-00-SF
Inspection Request Line: (253) 835-3050
Parcel Number: 072104 9251
Project Description: BLUEBEAM - Construction of a 2-story, 3173 square foot single family residence with a 89
square foot covered entry , a 178 square foot covered patio and a 732 square foot attached
garage, including plumbing and mechanical. *** 5 bedrooms; $650,000 estimated selling
price***
Owner
Applicant
Contractor
Lender
VLADIMIR CFIERNIKOV
PAVEL MELNIKURBAN DESIGN
OWNER 1S CONTRACTOR
OWNER IS LENDER
28134 29TH AVE S
GROUP
FEDERAL WAY WA 98003
PO BOX 58906
TUKW ILA WA 98138
Census Category: 101 - New Single Family House
Includes:
91
#2
#3
#4
Occupancy Class:
R-3
Construction Type:_
Type V - B
Occupancy Load:
Floor Area (sq. ft.)
3,173.00
Additional Permit Information
New / Additional Sq. Feet - 1st Floor ..................... 1369
New / Additional Sq. Feet - 3rd Floor ..................... 0
New / Additional Sq. Feet - Basement .................... 0
Occupancy # 1 - Construction Type ......................... Type V - B
New / Additional..Sq. Feet - Garage .......... ........ ....... 732
Plumbing Work Valuation? ..................................... 9000
Number of Stories .................... 2
Plumbing to be Included? ........................................ Yes
Will Certificate of Occupancy be Issued? ............... Yes
New / Additional Sq. Feet - 2nd Floor .................... 1904
Occupancy #1 -Area (Sq. Feet) .............................. 3173
BasicPlan? .............................................. No
New / Additional Sq. Feet - Deck ........................... 0
Mechanical to be Included? ..................................... Yes
Mechanical Work Valuation? ................................. 9000
New / Additional Sq. Feet - Other .......................... 267
New / Additional Sq. Feet - Total ................. 4172
..........
Occupancy #1 - Use ..................... ..... Residence (1 or 2
Comprehensive Plan Designation...,,...;..... ___ , SF - High -Density Zoning Designation.. ...................
Residential
Total Valuation: 433,344.07
Mechanical Fixtures
Ducting
Furnaces
Bathtubs
Lavatories
Water Closets
1 Fans
I Gas Piping
Plumbing Fixtures
2 Dishwashers
7 Showers
5 Hose Bibbs
FILE-
8 Fireplace Inserts
2 Hot Water Tanks
family)
RS 9.6
1 Laundry Washer Outlets 1
3 Sinks 2
2
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS, (253) 835-3050
PERMIT #: 21 100167 00 Address: 523 SW 316TH PL
Project: VLADIMIR CHERNIKOV FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑ SWM Precon Site Mtg (4400) ❑ Initial Erosion Control (4365) ❑ Footings/Setback (4110)
Approved To be done PRIOR to breaking ground Approved to place concrete
By Date By Date By Date
❑ Foundation Wall (4115) ❑ Drainage/Downspout (4040) ❑ Plumbing Groundwork (4190)
Approved to place concrete Approved to backfill Approved to cover
By Date By Date By Date
Slab/Concrete Floor (4255) ❑ Underfloor Framing (4285) ❑ Floor Sheathing (4105)
Approved to place concrete Approved to sheath floor Approved to install flooring
By Date By Date By Date
❑
Shear Walls (4245)
❑
Roof Sheathing (4220)
sz
Rough Plumbing (4230)
Approved to install siding
Approved to install roofing
Approved
By
Date
By
Date
By
Date
El
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Fire/Draft Stops (4095)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
El
Interim Erosion Control (4370)
Prior to scheduling a Framing inspection;
I❑
Framing (4120)
Approved
Electrical, Plumbing & Mechanical Rough -in
Approved to insulate
and
Fire/Draft Stop inspections must be signed -
By
Date
off and approved. IBC 109.3.4
By
Date
FITJ
Insulation (4150)
l
Gypsum Wallboard Nailing (4130)
Final Erosion Control (4375)
Approved to install wallboard
Approved to install mud & tape
Approved
By
Date
By
Date
By
Date
❑
Final - Building (4050)
El Final - Mechanical (4065)
❑ Final - Plumbing (4075)
Approved
Approved
Approved
By
Date
By
Date
By
17N Date +f�
❑
Rough Electrical
❑
Final Electrical
Right of Way
Approved
Approved
I
Approved
By
Date
By
Date
By
Date