Loading...
21-100168-Permit FinalCity of Federal way Community Development Dept. 33 325 Sth Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax. (253) 835-2609 Building - Single Family Permit #:21-100168-00-SF Inspection Request Line: (253) 835-3050 Project Name: LISITSYN Project Address: 519 SW 316TH PL Parcel Number: 072104 9252 Project Description: BLUEBEAM - Construction of a 2-story, 3051 square foot single family residence with a 137 square foot covered entry , a 286 square foot covered deck and a 456 square foot attached garage, including plumbing and mechanical. *** 5 bedrooms; $625,000 estimated selling price*** Owner MIKHAIL LISITSYN 28134 29TH AVE S FEDERAL WAY WA 98003 Includes: occupancy Class: Construction Type Occupancy Load: Floor Area (sq. ft., Applicant PAVEL MELNIKURBAN DESIGN GROUP PO BOX 58906 TUKWILA WA 98138 Contractor Lender OWNER IS CONTRACTOR OWNER IS LENDER Census Category: 101 - New Single Family House #1 92 #3 44 R-3 Type V - B 3,051.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 1386 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Basement .................... 0 Occupancy #1 - Construction Type........... .............. Type V - B New / Additional Sq. Feet - Garage ........................ 456 Plumbing Work Valuation? ..................................... 9000 Number of Stories ............................... I................... 2 Plumbing to be Included? ........................................ Yes Will Certificate of Occupancy be Issued? ............... Yes Comprehensive Plan Designation. .......................... SF - High -Density Residential Total Valuation: 407,823.27 Ducting Furnaces Hot Water Tanks New / Additional Sq. Feet - 2nd Floor....... ............. 1665 Occupancy # 1 - Area (Sq. Feet) .............................. 3051 BasicPlan?........................................................... No New / Additional Sq. Feet - Deck ........................... 286 Mechanical to be Included? ............................. Yes Mechanical Work Valuation? .................................. 9000 New / Additional Sq. Feet - Other ........................... 137 New / Additional Sq. Feet - Total ........................... 3930 Occupancy # 1 - Use .................... Residence (1 or 2 ............................ family) Zoning Designation...............................................1. RS 9.6 Mechanical Fixtures 1 Fans 1 Gas Piping 1 Plumbing Fixtures 6 Fireplace Inserts 1 1 Gas Pipe Outlets 2 Bathtubs 2 Dishwashers 1 Laundry Washer Outlets I Lavatories 5 Showers 2 Sinks 2 Water Closets 3 Hose Bibbs 2 _4%� csrr of Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 100168 00 Address: 519 SW 316TH PL Project: MIKIJAIL LISITSYN FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. E] SWM Precon Site Mtg (4400) ❑ Initial Erosion Control (4365) 0 Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By Date ❑ Foundation Wall (4115) ❑ Drainage/Downspout (4040) ❑ Plumbing Groundwork (4190) Approved to place concrete Approved to backfill Approved to cover By Date By Date By Date Slab/Concrete Floor (4255) ❑ Underfloor Framing (4285) ❑ Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date El Shear Walls (4245) ❑ Roof Sheathing (4220) ❑ Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved By Date By Date By Date ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) E5 Fire/Draft Stops (4095) Approved Approved to release test Approved By Date By Date By Date ❑ Interim Erosion Control (4370) Approved By Date 1l Insulation (4150) Approved to install wallboard By Date Q Final- Mechanical(4065) Approved By Date Prior to scheduling a Framing inspection; 17 Framing (4120) Electrical, Plumbing & Mechanical Rough -in Approved to insulate and Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 By Date EJ Gypsum Wallboard Nailing (4130) ❑ Approved to install mud & tape By Date By Final - Plumbing (4075) Approved By Date By Final Erosion Control (4375) Approved Date Final - Building (4050) Appr+n ed I Date �7�1 ❑ Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date