22-100990Cily of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: GOEBEL
Project Address: 29628 8TH AVE S
Plumbing
Permit #:22-100990-00-PL
Inspection Request Line: (253) 835-3060
Parcel Number: 515160 0210
Project Description: Install a new Storage Gas Water Heater & Expansion Tank & Water Lines
Owner
Applicant
Contractor
EILEEN GOEBEL
EILEEN GOEBEL
HARTS SERVICES (GENERAL)
29628 8TH AVE S
29628 8TH AVE S
HARTSS*824P4 (10/24/22)
FEDERAL WAY WA 98003-3721
FEDERAL WAY WA 980 03-
3510 PINE ST
TACOMA WA 98409
Water Heaters
Plumbing Fixtures
PERMIT EXPIRES Saturday, 3 September, 2022
Permit Issued on Monday, March 7, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent:rA1\11 INIF Date
THIS CARD IS TO REEMAIN ON -SITE �7 CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS- (253) 835-3050
PERMIT #: 22 100990 00 Address: 29628 8TH AVE S
Project: EILEEN GOEBEL FEDERAL WAY WA 98003-3721
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
1 Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
0
Final - Plumbing (4075)
Approved to cover
Approved
Approved
,y Date
By
Date
By
Date J`?AL/ L72
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date