Loading...
21-100627-Permit FinalCity of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MERIDIAN COURT APARTMENTS, BUILDING 1 Project Address: 31420 23RD AVE S Building - Multi Family Permit #:21-100627-00-MF Inspection Request Line: (253) 835-3050 Parcel Number: 092104 9190 Project Description: BLUEBEAM - Sheetrock and firestopping for penetration of fire -rated wall system. Owner Applicant Contractor Lender FAIRFIELD MERIDIAN COURT LP CHRISTOPHER FARIASBUILDING BUILDING RESOURCES INC OWNER IS LENDER ;55 MIRA SORRENTO PL SUITE 11 RESOURCES INC 18386 REDMOND WAY SAN DIEGO CA 92121 386 REDMOND WAY NE UNIT 183 REDMOND WA 98052 REDMOND WA 98052 Census Category: 434 - Residential alt/add - no change in number of units Includes: # 1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Mechanical to be Included? .................................... No Number of Stories .... ......................... ___ .......... 1—. 2 Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only?.............................. No Plumbing to be Included? ........................................ No Total Valuation: 7,000.00 No Fixtures Associated With This Permit I+ PERMIT EXPIRES Sunday, 29 August, 2021 Permit Issued on Tuesday, March 2, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: V�Iool)l CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 100627 00 Address: 31420 23RD AVE S Project: FAIRFIELD MERIDIAN COURT LP FEDERAL WAY WA 98003-5550 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Footings/Setback (4110) ® Foundation Wall (4115) 0 Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfi[I By Date By Date By Date Re -steel (4215) 5❑ Slab/Concrete Floor (4255) ® Underfloor Framing (4285) Approved to place concrete or grout Approved to place concrete Approved to sheath floor By Date By Date By Date 0 Floor Sheathing (4105) ® Shear Walls (4245) Roof Sheathing (4220) Approved to install flooring Approved to install siding Approved to install roofing By Date By Date By Date 10 Fire/Draft Stops (4095) Prior to scheduling a Framing inspection; 11 Framing (4120) Approved Electrical, Plumbing & Mechanical Rough -in Approved to insulate and Fire/Draft Stop inspections must be signed - By Date 13 off and approved. IBC 109.3.4 Gypsum Wallboard Nailing (4130) By 14 Date Suspended Ceiling Grid (4265) 1? Insulation (4150) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date Final - S K F & R (4060) 16 Final - Building (4050) By Approved Date By Approved #31J Date 3I;2j 1j', Q Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date