Loading...
21-104409-SITE PLANa I a a� cn 0 V V I O 0 O a aD / C V 0 U/ O 3: 0 w E 0 o Q i Q m E -5 3: n N L O N 0 N O � � T 0 O L N o �0 w a) Q N N ~ I Q J 6) 0 N O N _• � N c O 0 m� -_-50 n L O a) cv a a� FEDERAL WAY, WASHINGTON STORE NO.: 3794-242 DRAWING INDEX GENERAL C1 COVER SHEET RR SPECIAL PROJECT BUILDING CODE SUMMARY NAME OF PROJECT STREET ADDRESS: PROPOSED USE: FEDERAL WAY, WASHINGTON 34520 16th AVENUE SOUTH RETAIL CODES: BUILDING CODE: 2018 WASHINGTON STATE BUILDING CODE ARCHITECTURAL MECHANICAL CODE: 2018 WASHINGTON STATE MECHANICAL CODE PLUMBING CODE: 2015 UPC A5.1 RESTROOM PLANS AND DETAILS ELECTRICAL CODE: 2020 NEC A5.2 RESTROOM FLOOR FINISH PLANS AND DETAILS FIRE CODE: 2018 WASHINGTON STATE FIRE CODE A5.3 RESTROOM FINISH PLANS AND DETAILS ACCESSIBILITY CODE: 2009 ANSI A117.1 LIFE SAFETY: 2018 WASHINGTON STATE FIRE CODE ENERGY CODE: 2018 WASHINGTON STATE ENERGY CODE MECHANICAL- OCCUPANCY: M-MERCANTILE; WHOLESALE OR RETAIL STORE (MAIN USE) - SECT. 309.1 P1 PLUMBING PLANS DETAILS AND SCHEDULES ELECTRICAL - El ELECTRICAL PLANS E2 ELECTRICAL PLANS DETAILS AND SCHEDULES TYPE OF CONSTRUCTION: VB UNPROTECTED (SPRINKLERED) PER SECT. 601 AND 602 ALLOWABLE AREA: UNLIMITED SECTION 507.3 FIRE PROTECTION: BUILDING IS EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM AND IS SURROUNDED ON ALL SIDES BY 60 FEET MINIMUM OF PERMANENT OPEN SPACE AND COMPLIES WITH SECTION 507.3. UNLIMITED AREA CRITERIA IS APPLICABLE. 1 1.5 2 2.5 3 4 5 5.4 6 6.6 7 8 9 9.7 10 10.5 11 11.5 12 12.6 12.8 13 14 L I J -F �31 � - - 4 4 eae 1-41 �1= .n >Mn 1 ' r rT 2YYYYYYYYYYmIl YYYYYYYYYYYY A5.1 A5.1 Io II o®o II o®o O®p - III o®o II g®g o®o II F II o®o ®p 13 CE 1 o A5.1 C1 EB A.2- - KEY PLAN 1 NTS NORTH REMODELED SQ FT: EXISTING SQ FT: DATE: PROTO: 1)395 203818 10-18-21 195 GENERAL REQUIREMENTS 1. ALL WORK SHALL BE DONE IN A SAFE MANNER AND IN STRICT 10. WHERE EXISTING FINISHES ARE TO REMAIN, CLEAN, REPAIR, PATCH, ACCORDANCE WITH THE LOCAL AND/OR STATE BUILDING CODES, AND AND/OR REPAINT AS NECESSARY TO BLEND WITH ADJACENT ALL APPLICABLE CODES, REGULATION, ORDINANCES, AND AUTHORITIES SURFACES. COORDINATE WITH WALMART CONSTRUCTION MANAGER. HAVING JURISDICTION. 11. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY 2. EACH CONTRACTOR AND THEIR SUB -CONTRACTORS ARE RESPONSIBLE ORDERING OF MATERIALS TO PROHIBIT DELAYS OF THE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND CONSTRUCTION SCHEDULE OF THIS PROJECT. IT IS THE SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE DELIVERY OF HIMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE HIM OF ANY MATERIALS IN A TIMELY MANNER. RESPONSIBILITY FOR PERFORMING HIS WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE BECAUSE OF CONDITIONS THAT OCCUR DUE 12, THE GENERAL CONTRACTOR SHALL RESPOND TO ALL REQUIREMENTS TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. OF THE ARCHITECT FOR VERIFICATIONS, RESPONSES AND SUBMISSIONS. 3. THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE, DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS REQUIRED 13. DURING ENTIRE CONSTRUCTION PERIOD, PROVIDE ONE U.L. LISTED AND/OR DIRECTED BY THE WALMART CONSTRUCTION MANAGER TO KEEP 2A-20BC DRY CHEMICAL FIRE EXTINGUISHER, OR ONE STANDARD U.L. DUST AND MOISTURE FROM THE OPERATING AREAS OF THE STORE. LISTED 2-1/2 GALLON WATER (E-10) AND ONE U.L. LISTED 1013C 4. ANY DAMAGE TO WALMART PROPERTY, WHICH OCCURS DURING THE CARBON DIOXIDE FIRE EXTINGUISHER MOUNTED TOGETHER IN EACH PROCESS OF CONSTRUCTION, SHALL BE REPAIRED/REPLACED AT NO 3000 SQUARE FOOT OF WORK AREA OR FRACTION THEREOF (MINIMUM ADDITIONAL COST TO WALMART, THIS INCLUDES ALL MERCHANDISE. OF TWO AVAILABLE IN ALL CONSTRUCTION AREAS AT ALL TIMES). THE CONTRACTOR SHALL PAY WALMART THE RETAIL COST FOR ALL 14. IF MODIFICATION TO SPRINKLER SYSTEM IS REQUIRED, THE GENERAL DAMAGED MERCHANDISE. CONTRACTOR SHALL HIRE A LICENSED SPRINKLER CONTRACTOR. THE CONTRACTOR IS TO SUBMIT SIGNED AND SEALED SPRINKLER 5. THE CONTRACTOR SHALL KEEP WORK AREA CLEAN AND FREE OF DRAWINGS FOR APPROVAL TO THE AHJ PRIOR TO ANY ALTERATION DEBRIS AND SHALL REMOVE ALL TRASH AND DEBRIS FROM THE OF THE AUTOMATIC SPRINKLER SYSTEM. CONSTRUCTION AREA DAILY. NO FLAMMABLE MATERIALS OR LIQUIDS MAY BE STORED IN THE EXISTING BUILDING OR CONSTRUCTION AREAS. 15. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE EXISTING BUILDING SECURITY AT ALL TIMES. THIS INCLUDES KEEPING THE 6. REMOVE ANY EXISTING ITEMS, SERVICES, FINISHES OR SURFACES AS BUILDING SECURE FROM PERSONS, ENVIRONMENTAL ELEMENTS OR REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION. PROVIDE HAZARDS. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN FURRING FOR CONDUITS AND PIPING, SHOWN OR NOT, AND FINISH OUT THE INTEGRITY OF ALL EXISTING SECURITY SYSTEM. THE CONTRACTOR FURRING TO MATCH ADJACENT FINISHES. SHALL OBTAIN PERMISSION FROM THE STORE MANAGER PRIOR TO THE MODIFICATION OF ANY EXISTING SECURITY SYSTEM FOR THE OPENING 7. ALL ADJACENT TENANT SPACES SHALL REMAIN IN SERVICE DURING (DEMOLITION) OF ANY EXTERIOR WALL. DEMOLITION AND CONSTRUCTION. 16. FIRE ALARM DRAWINGS TO BE FURNISHED AND INSTALLED BY 8. SCHEDULE ALL WORK TO KEEP DISRUPTIONS TO THE STORE WALMART ALARM SERVICES. OPERATIONS AT A MINIMUM. COORDINATE UTILITY DISRUPTIONS WITH THE WALMART STORE MANAGER, 17. CONTRACTOR TO MAINTAIN ACCESS TO ALL EMERGENCY EGRESS EXITS DURING CONSTRUCTION OPERATIONS. 9. REPAIR, RE-ROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE 18. CONTRACTOR RESPONSIBLE FOR PERMITS AND TRADE LICENSES CONSTRUCTION PROCESS FOR THE COMPLETE INSTALLATION AND THROUGH LOCAL JURISDICTION. OPERATIONS OF NEW EQUIPMENT. THIS INCLUDES ALL ITEMS SHOWN OR NOT SHOWN ON THE DRAWINGS. RESET EXISTING EQUIPMENT OR RELATED ITEMS AS REQUIRED FOR PROPER OPERATION. SITE VERIFICATION DEMOLITION NOTES REQUIREMENTS 1. THE ARCHITECT HAS PREPARED THESE DRAWINGS BASED ON THE 1. CONTRACTOR IS RESPONSIBLE FOR ALL JOBSITE SAFETY AND EXISTING BUILDING CONDITIONS. IT IS THE RESPONSIBILITY OF THE COMPLIANCE WITH REGULATIONS. CONTRACTOR SHALL INSTALL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO THE TEMPORARY WALL, DUST BARRICADES AND CONSTRUCTION BARRIERS SUBMISSION OF HIS BID AND THE COMMENCEMENT OF ANY WORK. NO AND TAKE ALL PRECAUTIONS TO PROTECT CUSTOMERS AND ADDITIONAL COMPENSATION WILL BE PAID DUE TO THE CONTRACTOR'S ASSOCIATES FROM CONSTRUCTION OPERATIONS. FAILURE TO ACQUAINT HIMSELF WITH EXISTING SITE CONDITIONS WHICH INCLUDE, BUT ARE NOT LIMITED TO EXISTING WALL, CEILINGS, OR 2. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF UTILITIES. DEMOLITION. IF DISCREPANCIES ARE FOUND, CONTACT THE CONSTRUCTION MANAGER. 2. ANY DISCREPANCY WITH THE EXISTING SITE CONDITIONS AND/OR THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT 3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL A MINIMUM OF 8" FOR CLARIFICATION AND INSTRUCTION, THESE CONSTRUCTION DOCUMENTS BELOW FINISH FLOOR OR A MINIMUM OF 6" ABOVE FINISH HAVE BEEN DESIGNED AND DRAWN ASSUMING EXISTING BUILDING CEILING. CONDITIONS MATCH THE ORIGINAL DRAWINGS. IF DISCREPANCIES ARE FOUND BETWEEN WHAT IS SHOWN ON THE DRAWINGS AND EXISTING FIELD 4. SAW CUTTING OF EXISTING CONCRETE WILL BE COORDINATED WITH CONDITIONS, CONTACT THE WALMART CONSTRUCTION MANAGER AND THE STORE MANAGER FOR APPROPRIATE HOURS TO MINIMIZE CUSTOMERS ARCHITECT IMMEDIATELY TO DETERMINE WHAT ACTION SHOULD BE TAKEN DISTURBANCE. NO JACKHAMMERS ARE ALLOWED. TO MATCH EXISTING CONDITIONS. 5. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF 3. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR CONSTRUCTION WASTE AND DEBRIS. DO NOT USE STORE DUMPSTERS. SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES PREVENT CUSTOMERS AND ASSOCIATES FROM CONTACT WITH (WHETHER SHOWN OR NOT) O HE SUBMISSION OHIS BID OR ( TT ) PTTF CONSTRUCTION WASTE. THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE WALMART CONSTRUCTION MANAGER AND THE ARCHITECT 6. COORDINATE LOCATION OF DUMPSTER ON SITE WITH WALMART OF THE DISCOVERY OF EXISTING UTILITIES NOT SHOWN OR NOTED ON CM. THE DRAWINGS. 4. THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DEPTHS OF UNDERGROUND UTILITY SERVICES PRIOR TO ANY EXCAVATION. SCOPE OF WORK 5. REPORT ANY DISCREPANCIES FOUND IN THE FIELD IMMEDIATELY TO WALMART AND THE ARCHITECT PRIOR TO MAKING ANY MODIFICATIONS 1. REMODEL CUSTOMER RESTROOMS OR ORDERING OF ANY MATERIALS. RECEIVED Oct 26 2021 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT 0 0 p+enb2 hitecture gineering 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone: 479.636.3545 Fax: 479.636.1209 Architect of Record William Douglas Hurley Washington License No. 8855 Unified Business ID No. 602 491 668 W W - 0 LJ ~~W 20Z(/� O NZ�. Owe~=Q Z Wri� wa �liOQ �370N¢w¢�pWQ+w¢ ~p 'M0 OW¢ UZ� N0=Ja6,<ajo�ao <�Fap ZQ3,o`�wa"O <;aat0oZ00 (A w>-Oz /Q v�U}NQ 3¢3o- w03a�Y pZO<WomwwOzwwwzwm W H IN¢ W 0-Z 3 (nwOZtoWWOOC7¢O} X: (A W 0ov�ia�waawoa'5 z r- 0 0 Z= (� 0 U71 N O w I o zCY) LLJ > r0 � a Q O� 0 LL1 0 � IY __]00 N 1­-o Ln in N L_L ] w m L_L ] LL z m RR SPECIAL PROJECT o ISSUE BLOCK CHECKED BY: SB DRAWN BY: AMR PROTO CYCLE: 09-24-21 DOCUMENT DATE: 10-18-21 8855 WILLIAM DOUGLAS HURLEY STATE OF WASHINGTON 0.18.2021 DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR CONSTRUCTION COVER SHEET N �t O c-) N � Ln / �0) -,0-) 0 0-) I o O w O O Z N ARCHITECTURAL: MECHANICAL/ELECTRICAL/PLUMBING BUILDING REVIEW: STORE ADDRESS: pb2 architecture + engineering RTM ENGINEERING CONSULTANTS CITY OF FEDERAL WAY WALMART STORE NO. 3794 2809 AJAX AVENUE SUITE 100 3333 EAST BATTLEFIELD ROAD PERMIT CENTER 34520 16th AVENUE ROGERS, ARKANSAS 72758 SUITE 1000 33325 8th AVENUE SOUTH FEDERAL WAY, WASHINGTON 98003 (479) 636-3545 SPRINGFIELD, MISSOURI 65804 FEDERAL WAY, WASHINGTON 98003 (417) 881-0020 (253) 835-2607 SHEET: C 1