21-100075City of Federal Way
Community Development Dept
FILF
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: LAKEHAVEN WASTEWATER TREATMENT PLANT
Project Address: 3203 SW DASH POINT RD
Electrical
Permit #:21-100075-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 122103 9105
Project Description: Various electrical modifications throughout the secondary treatment facility.
Owner
Applicant
Contractor
LAKEHAVEN UTILITY DISTRICT
KARRIE STEWARTSOURCE ELECTRIC
SOURCE ELECTRIC LLC
PO BOX 4249
LLC
SOURCE*876QD (2/3/22)
FEDERAL WAY WA 98063
7045 BANNER RD SW
7045 BANNER RD SE
PORT ORCHARD WA 98367
PORT ORCHARD WA 98367
Additional Permit Information
Is this an Online or O.T.C. application? ............... Yes
Electrical Fixtures
Alt. Srvc / Feeder 0 to 200 aml 17 Circuits - Commercial 42 Temp. Service: 0 - 60 amps (A
PERMIT EXPIRES Tuesday,11 January, 2022
Permit Issued on Monday, January 11, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
sFVaOirr�t n a e I ►a'FFederal Way.
T
Owner or agent: Date
Construction
CARD IS TO REMAIN
/7ON-SITE
nrY}�
CITY OF Construction Inspection Record
Federal Way INSPECTION 11EQ11ESTS: (253) 835-3050
PERMIT #: 21 100075 00 Address: 3203 SW DASH POINT RD
Project: LAKEHAVEN UTILITY DISTRICT FEDERAL WAY WA 98023-2340
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE' I'I I IS CAM). Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must riot be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑
UFER Ground (4295)
❑ Ditch cover (4030)
Slab/Concrete Floor (4255)
Approved
pprowd//
`
Approved to place concrete
By Date
By DAte{To
By Date
Pool Bonding (4195)
Approved
By Date
❑ Temporary Power (4275)
Approved
By Date
By
Service (4235)
Approved
Date
❑ Feeders/Sub-panels (4045)
❑ Rough Electrical (4225)
❑ Ceiling Cover (4020)
Approved
.By Date �_1_/
Approved
By Date
Approved
By r Date
❑ Final - Electrical (4055)
roved
By Date`kf
zj/ 60,7 ,"
❑ Rough Electrical ❑ Final Electrical ❑ Right of Way
Approved Approved Approved
By Date By Date By Date