Loading...
Exhibit R - NOA Summit at Steel Lake Preliminary Plat 10-22-2121-100244-SU Doc ID 81110 NOTICE OF LAND USE APPLICATION Summit at Steel Lake Preliminary Plat Project Name: Summit at Steel Lake Preliminary Plat Project Description: Applicant proposes to subdivide an approximately 5.94-acre parcel into 24 single-family residential lots and associated improvements, including street improvements, storm drainage facilities, utility improvements, and landscaping. Property is zoned RS 7.2. Applicant Contact: Evan Mann; Copper Ridge, LLC.; PO Box 73790; Puyallup, WA 98373 Project Location: Unaddressed north and east intersection of South 304th Street and 11th Avenue South, Federal Way, WA 98003; Parcel 052104-9033 Application Received: July 22, 2021 Notice of Application: October 22, 2021 Determined Complete: October 18, 2021 Other Permits and Determinations Included with this Application: Preliminary Plat Application File No 21- 102770-SU; State Environmental Policy Act Threshold Determination File No 21-102841-SE; and Transportation Concurrency File No 21-102842-CN. Environmental Documents: Critical Areas Report prepared by EnviroVector, September 27, 2021; Geotechnical Engineering Study prepared by Earth Solutions NW, LLC., November 13, 2018; Preliminary Technical Information Report prepared by Core Design Inc., July 6, 2021; SEPA Checklist, prepared by Core Design Inc., dated July 9, 2021. Required Studies: Technical Information Report; Critical Areas Report; and Geotechnical Report. Development Regulations Used for Project Mitigation: Federal Way Revised Code (FWRC) Title 14, “Environmental Policy”; Title 16, “Surface Water Management”; Title 18, “Subdivisions”; and Title 19, “Zoning and Development Code.” Consistency with Applicable Plans and Regulations: The project will be reviewed for consistency with all applicable policies and regulations, including but not limited to: Federal Way Comprehensive Plan; King County Surface Water Design Manual; Public Works Development Standards; Lakehaven Water and Sewer System Design and Construction Standards; South King Fire and Rescue Administrative Policies; and Federal Way Public Schools Safe Access Policies. Public Comment: Any person may submit written comments regarding the application to the Department of Community Development. Any person has the right to submit written comments to the Hearing Examiner and appear at the public hearing of the Hearing Examiner to give comments verbally. A notice of public hearing will be issued approximately 15 days prior to the hearing date. Availability of File: The official project file, existing environmental documents and required studies are available for public review at the following website: ***** (please insert link, thanks!) Staff Contact: Associate Planner Natalie Kamieniecki, 253-835-2638, or natalie.kamieniecki@cityoffederalway.com 21-100244-SU Doc ID 81110 Printed in the Federal Way Mirror October 22, 2021.