Exhibit R - NOA Summit at Steel Lake Preliminary Plat 10-22-2121-100244-SU Doc ID 81110
NOTICE OF LAND USE APPLICATION
Summit at Steel Lake Preliminary Plat
Project Name: Summit at Steel Lake Preliminary Plat
Project Description: Applicant proposes to subdivide
an approximately 5.94-acre parcel into 24 single-family
residential lots and associated improvements, including
street improvements, storm drainage facilities, utility
improvements, and landscaping. Property is zoned RS
7.2.
Applicant Contact: Evan Mann; Copper Ridge, LLC.;
PO Box 73790; Puyallup, WA 98373
Project Location: Unaddressed north and east
intersection of South 304th Street and 11th Avenue South,
Federal Way, WA 98003; Parcel 052104-9033
Application Received: July 22, 2021
Notice of Application: October 22, 2021
Determined Complete: October 18, 2021
Other Permits and Determinations Included with this Application: Preliminary Plat Application File No 21-
102770-SU; State Environmental Policy Act Threshold Determination File No 21-102841-SE; and Transportation
Concurrency File No 21-102842-CN.
Environmental Documents: Critical Areas Report prepared by EnviroVector, September 27, 2021; Geotechnical
Engineering Study prepared by Earth Solutions NW, LLC., November 13, 2018; Preliminary Technical Information
Report prepared by Core Design Inc., July 6, 2021; SEPA Checklist, prepared by Core Design Inc., dated July 9,
2021.
Required Studies: Technical Information Report; Critical Areas Report; and Geotechnical Report.
Development Regulations Used for Project Mitigation: Federal Way Revised Code (FWRC) Title 14, “Environmental
Policy”; Title 16, “Surface Water Management”; Title 18, “Subdivisions”; and Title 19, “Zoning and Development Code.”
Consistency with Applicable Plans and Regulations: The project will be reviewed for consistency with all
applicable policies and regulations, including but not limited to: Federal Way Comprehensive Plan; King County
Surface Water Design Manual; Public Works Development Standards; Lakehaven Water and Sewer System Design and
Construction Standards; South King Fire and Rescue Administrative Policies; and Federal Way Public Schools Safe
Access Policies.
Public Comment: Any person may submit written comments regarding the application to the Department of
Community Development. Any person has the right to submit written comments to the Hearing Examiner and appear at
the public hearing of the Hearing Examiner to give comments verbally. A notice of public hearing will be issued
approximately 15 days prior to the hearing date.
Availability of File: The official project file, existing environmental documents and required studies are available
for public review at the following website: ***** (please insert link, thanks!)
Staff Contact: Associate Planner Natalie Kamieniecki, 253-835-2638, or natalie.kamieniecki@cityoffederalway.com
21-100244-SU Doc ID 81110
Printed in the Federal Way Mirror October 22, 2021.