21-102651-PERMIT FINALCity of Federal Way
Community Development Dept,
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) B35-2607 Fax: (253) 835-2609
Project Name: SAFEWAY
Project Address: 1207 S 320TH ST
Building - Commercial
Permit #:21-102651-00-CO
Inspection Request Line: (253) 835-3050
Parcel Number: 150050 0020
Project Description: BLUEBEAM - Change Out Refrigerated Cases, Replace Flooring, Painting & Decor
Installation. Plumbing and Mechanical by separate permit.
Owner
Applicant
Contractor
Lender
MERLONE GEIER PARTNERS
DAVID NYLANDERIN STORE
IN STORE SERVICES INC
TENANT IS LENDER
457 SW 148TH ST SUITE 202
SERVICES INC
625 S LANDER ST
BURIEN WA 98166
625 S LANDER ST
SEATTLE WA 98134
SEATTLE WA 98134
Census Category: 437 - Commercial alt / add / conversion
Includes:
# 1
#2
#3
#4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
0.00
Additional Permit Information
Mechanical to be Included? .....................................
No
Mechanical Work Valuation? ..................................
0
Is this an Online or O.T.C. application? ..................
No
Plumbing to be Included? ........................................
No
Zoning Designation... ..................,
CC-F
Total Valuation: 500,000.00
Plumbing Work Valuation? ..................................... 0
Number of Stories ................................................... I
Permit for Building Shell Only? .............................. No
Comprehensive Plan Designation ........................... City Center Frame
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Monday, 24 January, 2022
Permit Issued on Wednesday, July 28, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
W nd ty of Federal Way.
tire
Owner or agent: Date:
' & THIS CARD IS TO REMAIN ON -SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 21 102651 00 Address: 1207 S 320TH ST
Project: MERLONE GEIER PARTNERS FEDERAL WAY WA 98003-5339
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card,
Q
Footings/Setback (4110)
Re -steel (4215)
Q
Slab/Concrete Floor (4255)
Approved to place concrete
Approved to place concrete or grout
Approved to place concrete
By
Date
By
Date
By
Date
®
Underfloor Framing (4285)
®
Floor Sheathing (4105)
Fire/Draft Stops (4095)
Approved to sheath floor
Approved to instal I flooring
Approved
By
Date
By
Date
By
Date
Prior to scheduling a Framing inspection; LI Framing (4120) ® Insulation (4150)
Electrical, Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard
and Fire/Draft Stop inspections must be signed -
off and approved. IBC 109.3.4 By Date By Date
t11
Gypsum Wallboard Nailing (4130)
10
Suspended Ceiling Grid (4265)
11
Final - S K F & R (4060)
Approved to install mud & tape
Approved to drop tile
Approved
By
Date
By
Date
By
Date
12 Final - Building (4050)
Approved
By ArJ Date l/ ZL
❑
Rough Electrical
®
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date