21-102665-Permit FinalCity of F:Fax:
Way
Couununity Dment Dept.
33325 e S
Federal W98003
Ph:(253) 835-260253)835-2609
Project Name: WANJIRU
Project Address: 2731 SW 323RD ST
Building - Single Family
Permit #:21-102665-00-SF
Inspection Request Line: (253) 835-3050
Parcel Number: 873180 0870
Project Description: BLUEBEAM - Construct ramp, interior room partitions, window installation and replacement,
grab bar installation, sink installation.
Owner
Applicant
Contractor
Lender
JAMES WANJIRU
GEORGE NGANGACSL DESIGNS
OWNER IS CONTRACTOR
OWNER IS LENDER
29423 19TH PL S
30641 11TH AVE S
FEDERAL WAY WA 98003
FEDERAL WAY 98003
Census Category: 434 - Residential alt/add - no change in number of units
Includes:
# 1
#2
#3
#4
Occupancy Class:
R-3
Construction Type:
Type V - B
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
New / Additional Sq. Feet - 1 st Floor .....................
0
New / Additional Sq. Feet - 3rd Floor .....................
0
Occupancy #1 -Construction Type .........................
Type V - B
New / Additional Sq. Feet - Garage........................
0
Plumbing Work Valuation? .....................................
1000
Number of Stories ...................................................
I
Is this an Online or O.T.C. application? ..................
No
New / Additional Sq. Feet - Total ...........................
0
Comprehensive Plan Designation........................... SF - High -Density
Residential
Total Valuation: 25,000.00
Sinks
New / Additional Sq. Feet - 2nd Floor ....................
0
New / Additional Sq. Feet - Basement ....................
0
New / Additional Sq. Feet - Deck ...........................
0
Mechanical to be Included? .....................................
No
Mechanical Work Valuation? ..................................
0
New / Additional Sq. Feet - Other ...........................
0
Plumbing to be Included? ........................................
Yes
Occupancy #1 - Use................ ......„
........................
Residence (I or 2
family)
Zoning Designation ................ ,
RS 7.2
Plumbing Fixtures
PERMIT EXPIRES Wednesday, 12 January, 2022
Permit Issued on Friday, July 16, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
W L
rity of Federal Way
Owner or agent: Date:
F"'I
Al��
CITY 01. THIS CARD IS To REMAIN oN-SI
TE
Federal Way Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 2110266500
Address: 2731 SW 323RD ST
Project: JAMES WANJIRU
Scheduled inspections may be failed if this card is not on -site. DO NOT1,{3SI: i-EA
lls Cllil FEDERAions L TWA � WA 98023-2522
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with Your inspector if
you are unsure about any of the inspections or theInspection sequence. On -going inspections are logged on the back of this card.sequential order as possible
0 SWM Precon Site Mtg (4400)
Approved 0 Initial Erosion Control (4365) El To be done PRIOR to breaking ground FDotillgS,lSetback (4110)
By Date B Approved to place concrete
Ey Date By Date
EApproved
undation Wall (4115) 5❑ Drainage/Downspout (4040) Plumbing Groundwork (4190)
to place concreteApproved to backfillDate B Approved to cover
y Date B
y Date
EEDsjab/Concrete Floor (4255) 8❑ Underfloor Framing (4285) Floor Sheathing (4105)
ved to place concreteApproved to sheath floor Approved to install flooring
Date
By
By Date
10 Shear Walls (4245) �� Date Roof Sheathing (4220) 12
Approved to install siding Rough Plumbing (4230)
Shear
to install roofing
By Date Approved
By Date
By Date
EIM'13flre/Draft Stops (4095) 14 Interim Erasiolt Control 4370Approved ( ) Prior to schr{ruling ai�ramhik iuspccliort.
Approved Electrical, Plumbing & hIcchailBough-iuDate By and rlre/Dratt Stap irispcctions rulrsl he sigrrr1l-
Date ofrand approved. WC 109.3,4
15 Framing (4120) 1ti
Approved to insulate Insulation (4150) 17 Gypsum Wallboard Nailing (4130)
Approved to install wallboard
By Date B Approved to install mud & tape
y Date B
y ❑ Date
18 Final Erosion Control (4375) 19 Final -Plumbing (4075) 20
Approved ❑ Final - Building (4050)
Approved
By Date By Approved
Date By Date
❑ Rough Electrical ❑
Approved Final Electrical
Approved ❑ Right of Way
By Date B Approved
y Date B
y Date