Loading...
21-104730-CO–Site PlanL c� N U I LU iy I c� cB W N IL CO O a (D 06 0 N m W m 0 0 4 co co ti g U) ca 0 C� 06 0 N co c>a (B N N H m O� O 0 N z O 1-- (D z U) U N 0 n U) U a� U U O v� U N U L U) O O N 0 U 0 U) O O 04 N N M CM 6i 7— N 0 N N N O� 1ST FLOOR - SITE PLAN Scale: 1 " = 10'-0" KEYED NOTES # 1. NEW LANDSCAPE AREA. 2. ACCESSIBLE PATH OF TRAVEL. 3. NEW 6" CONCRETE CURB. 4. EXISTING CANOPY (ABOVE). 5. EXISTING GAS METER LOCATION. 6. EXISTING ELECTRICAL CABINET AND METER LOCATION 7. EXISTING ELECTRICAL TRANSFORMER. 8. EXISTING SITE LIGHT POLE WITH LED LUMINAIRE. 9. NEW WHEEL STOPS. 10. MODIFIED TRASH ENCLOSURE. 11. RELOCATED DT CLEARANCE BAR ON NEW CONCRETE FOOTING. GC TO VIF CONCRETE FOOTING DOES NOT INTERFERE WITH MANHOLE. 12. PRE -MENU BOARD. 13. ORDER CANOPY, SCREEN, CONTROL BOX. 14. 5 PANEL MENU BOARD.. 15. INSTALL DETECTOR LOOP AT DT ORDER POINT AND DT WINDOW BY. 16. DT LANE GRAPHIC;TO BE THERMOGRAPHIC. 17. NON -ILLUMINATED BOLLARD. 18. PARKING STRIPING. 19. CUSTOM ONE SIDE DIRECTIONAL SIGN. ARROW AND LOGO FACING THE DRIVE THRU. TO BE INSTALLED ON EXISTING CONCRETE FOOTING. 20. STRIPING. 21. EXISTING MANHOLE COVER. 22. EXISTING STORM DRAIN. 23. NEW HANDICAP PARKING. 24. EXITING DT WAYFINDING GRAPHIC DIRECTIONAL DOUBLE ARROW. 25. EXISTING DT WAYFINDING GRAPHIC EXIT ARROW. 26. EXISTING EXIT/THANKYOU DIRECTIONAL SIGN. 27. EXISTING MONUMENT SIGN. GENERAL NOTES A. REFER TO EXTERIOR ELEVATIONS ON SHEET A201 FOR BUILDING SIGNAGE LOCATION AND DESIGN ID. REFER TO ELECTRICAL PLANS FOR ELECTRICAL REQUIREMENTS. B. LANDSCAPING TO BE PROVIDED PER ZONING CODE AND SUSTAINABILITY REQUIREMENTS. C. DRIVE-THRU EQUIPMENT INCLUDING VEHICLE DETECTION LOOP, WIRELESS COMMUNICATION AND MONITORS SHALL BE COORDINATED BY STARBUCKS CONSTRUCTION MANAGER. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL REQUIREMENTS. D. LANDLORD TO PROVIDE 6" (150MM) THICK CONCRETE PAVING THE LENGTH OF THE DRIVE-THRU LANE, EXTENT TO INCLUDE DRIVE-THRU ENTRY POINT THROUGH WINDOW STANDING PAD. E. GENERAL CONTRACTOR TO APPLY CONCRETE SEALER TO ALL EXTERIOR CONCRETE PATIO AND WALKWAY SURFACES. F. GENERAL CONTRACTOR TO VERIFY ALL EXISTING ELEVATIONS AND BUILDING CONDITIONS IN FIELD PRIOR TO START OF CONSTRUCTION. G. PROVIDE DETECTABLE WARNING (IF APPLCABLE PER LOCAL CODE) AT TRANSITION FROM SIDEWALK TO DRIVE AISLE. H. ACCESSIBLE PARKING SPACES AND ACCESS AISLES SHALL HAVE SURFACE SLOPE NOT TO EXCEED 2% IN ALL DIRECTIONS. I. REFER TO ELECTRICAL DRAWINGS FOR SITE RELATED ELECTRICAL SLOPE. J. SCRAPE AND REPAINT ALL EXISTING PAINTED SITE FEATURES, INCLUDING, BUT NOT LIMITED TO CURBS, BOLLARDS, RAILINGS AND SITE LIGHTING BASES. K. SEE SHEET A002 FOR ARCHITECTURAL SITE DETAILS. LEGEND NEW LANDSCAPE AREA NEW CONCRETE WALKWAY NEW 6" (150MM) CONCRETE CURB CONCRETE DRIVE THRU LANE ----- ACCCESSIBLE PATH OF TRAVEL 0 10, 20' 40' Scale: 1" = 20'-0" r N Q N r N z O W w F_ W 0 F_ LL1 a. 0 m J a z LL STARBVCKS® 2401 UTAH AVENUE SOUTH SEATTLE, WASHINGTON 98134 (206) 318-1575 THESE DRAWINGS AND THE PROJECT MANUAL ARE CONFIDENTIAL AND SHALL REMAIN THE SOLE PROPERTY OF STARBUCKS CORPORATION, WHICH IS THE OWNER OF THE COPYRIGHT IN THIS WORK. THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN PART), SHARED WITH THIRD PARTIES OR USED IN ANY MANNER ON OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT WITHOUT THE PRIOR WRITTEN CONSENT OF STARBUCKS CORPORATION. THESE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO EXPRESS DESIGN INTENT FOR A PROTOTYPICAL STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE AT ANYTIME) AND DO NOT REFLECT ACTUAL SITE CONDITIONS. NEITHER PARTY SHALL HAVE ANY OBLIGATION NOR LIABILITY TO THE OTHER (EXCEPT STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY EXECUTED BY BOTH PARTIES. STARBUCKS TEMPLATE VERSION 2020-04-20 ARCHITECT OF RECORD SOOSOCIATES Soos & Associates, Inc. 105 Schelter Road Lincolnshire, IL 60069 p: 847 821 7667 RECEIVED 12/15/2021 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT 11883 REGIS RED ECT MELANIE S. SOQS STATE OF WASHINGTON VJ LU / O Q 00 O Q 06 Q J w Q LU = Q o OCV0 CV) � � J z Q Q O � CN O W � U)W 0 LU 0 LU T- 0 (� 0 w 0 w z STORE #: 52952 PROJECT #: 76634-009 ISSUE DATE: 09/10/2021 DESIGN MANAGER: RYAN WONG PRODUCTION DESIGNER: SOOS CHECKED BY: SODS Revision Schedule ev Date By Description 8/26/21 CODE COMMENTS 9/10/21 DESIGN CHANGES SHEET TITLE: ARCHITECTURAL SITE PLAN SCALE: AS SHOWN SHEET NUMBER: A001