Loading...
20-100380 InspectionTHIS CARD IS TO REMAIN ON -SITE CITY OF 1�.- Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 100380 00 Address: 113 SW 292ND ST Project: SHASHI PRASAD FEDERAL WAY WA Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ SWM Precon Site Mtg (4400) ❑ Initial Erosion Control (4365) ❑ Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By Date ❑ Foundation Wall (4115) ❑ Drainage/Downspout (4040) El Plumbing Groundwork (4190) Approved to place concrete Approved to backfill Approved to cover By Date By Date By Date ❑ Slab/Concrete Floor (4255) ❑ Underfloor Framing (4285) ❑ Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date ❑ Shear Walls (4245) ❑ Roof Sheathing (4220) ❑ Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved By Date By Date By Date ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Fire/Draft Stops (4095) Approved Approved to release test Approved By Date By Date By Date ❑ Interim Erosion Control (4370) EPrioreduling a Framing inspection; Framing (4120) umbing & Mechanical Rough-inApproved Approved to insulate t Stop inspections must be signedBy Date d approved. IBC 109.3.4 By Date ❑ Insulation (4150) ❑ Gypsum Wallboard Nailing (4130) ❑ Final Erosion Control (4375) Approved to install wallboard Approved to install mud & tape Approved By Date By Date By Date ❑ Final - Mechanical (4065) ❑ Final - Plumbing (4075) ❑ Final - Building (4050) Approved Approved Approved By Date By Date By Date ❑ Rough Electrical ❑ Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date