Loading...
22-100211-Permit FinalCity of Federal Way Conununity Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MAMA STORTINI'S Project Address: 1911 S 320TH ST Building - Commercial Permit #:22-100211-00-CO Inspection Request Line: (253) 835-3050 Project Description: BLUEBEAM - Construction of covered outdoor patio seating. Owner MERLONE GEIER PARTNERS 457 SW 148TH ST SUITE 202 BURIEN WA 98166 Applicant ROGER STILSONMAMA STORTIN'S RESTAURANT 1911 S 320TH ST FEDERAL WAY WA 98003 Contractor B M D C SERVICES 900 N NORTHLAKE WAY SUITE SEATTLE WA 98103 Census Category: 437 - Commercial alt / add / conversion Parcel Number: 762240 0013 Lender TENANT IS LENDER Includes: # 1 #2 #3 #4 Occupancy Class: A-3 Construction T e: Type V - B Occupancy Load: 27.00 Floor Area (sq. ft.) 405.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 0 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Basement .................... 0 New / Additional Sq. Feet - Deck ........................... 405 Mechanical to be Included2.................................... No Mechanical Work Valuation? .................................. 0 New / Additional Sq. Feet - Other ........................... 0 Permit for Building Shell Only? .............................. No New / Additional Sq. Feet - Total ........................... 405 Comprehensive Plan Designation ........................... City Center Core Total Valuation: 105,000.00 Fire conditions: See red line on I 3 New / Additional Sq. Feet - 2nd Floor .................... 0 Occupancy #1 -Area (Sq. Feet) .............................. 405 Occupancy #1 - Construction Type ......................... Type V - B New / Additional Sq. Feet - Garage ........................ 0 Plumbing Work Valuation? ..................................... 0 Number of Stories ................................................... I Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ........................................ No Occupancy #1 - Use ................................................ Restaurant Zoning Designation ................................................. CC-C No Fixtures Associated With ThIs Permit I CONDITIONS: PERMIT EXPIRES Saturday, 3 September, 2022 Permit Issued on Monday, March 7, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of WaW hiJpna dPe City of Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON -SITE -CITY OFA�k Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 100211 00 Address: 1911 S 320TH ST Project: MERLONE GEIER PARTNERS FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Footings/Setback (4110) Q Foundation Wall (4115) L _I Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date By Date By Date Re -steel (4215) 5❑ Slab/Concrete Floor (4255) L°J Underfloor Framing (4285) Approved to place concrete or. grout Approved to place concrete Approved to sheath floor By Date -$ By Date rf L2 By Date 7 Floor Sheathing (4105) ® Shear Walls (4245) Q Roof Sheathing (4220) Approved to install flooring Approved to install siding Approved to install roofing By Date By Date By Date 10 Fire/Draft Stops (4095) LElectrical, scheduling a Framing inspection; ® Framing (4120) Approved Plumbing & Mechanical Rough -in Approved to insulate raft Stop inspections must be signedBy Date and approved. IBC 109.3.4 By Date 12 Insulation (4150) 13 Gypsum Wallboard Nailing (4130) 14 Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date 15 Final - S K F & R (4060) 1B Final - Planning 17 Final - Public Works (4080) Approved Approved Approved By Date By Date By Date 113 Final - Building (4050) Approved [By Date ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date