22-100211-Permit FinalCity of Federal Way
Conununity Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: MAMA STORTINI'S
Project Address: 1911 S 320TH ST
Building - Commercial
Permit #:22-100211-00-CO
Inspection Request Line: (253) 835-3050
Project Description: BLUEBEAM - Construction of covered outdoor patio seating.
Owner
MERLONE GEIER PARTNERS
457 SW 148TH ST SUITE 202
BURIEN WA 98166
Applicant
ROGER STILSONMAMA
STORTIN'S RESTAURANT
1911 S 320TH ST
FEDERAL WAY WA 98003
Contractor
B M D C SERVICES
900 N NORTHLAKE WAY SUITE
SEATTLE WA 98103
Census Category: 437 - Commercial alt / add / conversion
Parcel Number: 762240 0013
Lender
TENANT IS LENDER
Includes:
# 1
#2
#3
#4
Occupancy Class:
A-3
Construction T e:
Type V - B
Occupancy Load:
27.00
Floor Area (sq. ft.)
405.00
Additional Permit Information
New / Additional Sq. Feet - 1st Floor .....................
0
New / Additional Sq. Feet - 3rd Floor .....................
0
New / Additional Sq. Feet - Basement ....................
0
New / Additional Sq. Feet - Deck ...........................
405
Mechanical to be Included2....................................
No
Mechanical Work Valuation? ..................................
0
New / Additional Sq. Feet - Other ...........................
0
Permit for Building Shell Only? ..............................
No
New / Additional Sq. Feet - Total ...........................
405
Comprehensive Plan Designation ...........................
City Center Core
Total Valuation: 105,000.00
Fire conditions:
See red line on I
3
New / Additional Sq. Feet - 2nd Floor ....................
0
Occupancy #1 -Area (Sq. Feet) ..............................
405
Occupancy #1 - Construction Type .........................
Type V - B
New / Additional Sq. Feet - Garage ........................
0
Plumbing Work Valuation? .....................................
0
Number of Stories ...................................................
I
Is this an Online or O.T.C. application? ..................
No
Plumbing to be Included? ........................................
No
Occupancy #1 - Use ................................................
Restaurant
Zoning Designation .................................................
CC-C
No Fixtures Associated With ThIs Permit I
CONDITIONS:
PERMIT EXPIRES Saturday, 3 September, 2022
Permit Issued on Monday, March 7, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
WaW hiJpna dPe City of Federal Way.
Owner or agent: Date:
THIS CARD IS TO REMAIN ON -SITE
-CITY OFA�k Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 100211 00 Address: 1911 S 320TH ST
Project: MERLONE GEIER PARTNERS FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0
Footings/Setback (4110)
Q
Foundation Wall (4115)
L _I
Drainage/Downspout (4040)
Approved to place concrete
Approved to place concrete
Approved to backfill
By
Date
By
Date
By
Date
Re -steel (4215)
5❑
Slab/Concrete Floor (4255)
L°J
Underfloor Framing (4285)
Approved to place concrete or. grout
Approved to place concrete
Approved to sheath floor
By
Date -$
By
Date rf L2
By
Date
7
Floor Sheathing (4105)
®
Shear Walls (4245)
Q
Roof Sheathing (4220)
Approved to install flooring
Approved to install siding
Approved to install roofing
By
Date
By
Date
By
Date
10 Fire/Draft Stops (4095) LElectrical,
scheduling a Framing inspection; ® Framing (4120)
Approved Plumbing & Mechanical Rough -in Approved to insulate
raft Stop inspections must be signedBy Date and approved. IBC 109.3.4 By Date
12
Insulation (4150)
13
Gypsum Wallboard Nailing (4130)
14
Suspended Ceiling Grid (4265)
Approved to install wallboard
Approved to install mud & tape
Approved to drop tile
By
Date
By
Date
By
Date
15
Final - S K F & R (4060)
1B
Final - Planning
17
Final - Public Works (4080)
Approved
Approved
Approved
By
Date
By
Date
By
Date
113 Final - Building (4050)
Approved
[By Date
❑
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By