21-102564-Permit FinalCity of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: HARSCH OFFICES
Project Address: 1414 S 324TH ST
Building - Commercial
Permit #:21-102564-00-CO
Inspection Request Line: (253) 835-3050
Parcel Number: 150050 0080
Project Description: BLUEBEAM - TI for remainder space from B217 build out (several years ago), to provide for
management offices for owner in 1590 sf, provide 2 handicap restrooms, 2 private offices (1
separate entry) and a break area and open office. A new front entry door will be provided in
the storefront. Plumbing and Mechanical by separate permit.
Owner
Applicant
Contractor
Lender
HARSCH INVESTMENT
VICKI SOMPPIWORKPLACE
BOWMAN CREEK
OWNER IS LENDER
PROPERTIES LLC
ARCHITECTURE
CONTRACTING LLC
1121 SW SALMON ST
3025 112TH AVE NE UNIT 110
PO BOX 2234
PORTLAND OR 97205
BELLEVUE WA 98004
TACOMA WA 98401-2214
Census Category: 437 - Commercial alt / add / conversion
Includes:
#1
#2
#3
#4
Occupancy Class:
B
Construction Type:
Type V - B
Occupancy Load:
11.00
Floor Area (sq. ft.)
1,590.00
Additional Permit Information
Occupancy #1 - Area (Sq. Feet) ..............................
1590
Occupancy #1 - Construction Type.........................
Type V - B
Mechanical to be Included? .....................................
No
Plumbing Work Valuation?.....................................
0
Mechanical Work Valuation? ..................................
0
Number of Stories......................,............................
I
Is this an Online or O.T.C. application? ..................
No
Permit for Building Shell Only? ................... .......... .
No
Plumbing to be Included?... .....................................
No
Occupancy #1 - Use..................... ..........................
.
Professional
Services/Offices
Comprehensive Plan Designation ...........................
City Center Frame
Zoning Designation.................. .......................
CC-F
Total Valuation: 80,000.00
No Fixtures Associated With This Permit!!
CONDITIONS:
Fire conditions:
A separate permit is required for the modification of the sprinkler and fire alarm
PERMIT EXPIRES Tuesday, 12 April, 2022
' Permit Issued on Thursday, October 14, 2021
1 hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washih� n LndINtyof Federal Way.
Owner or agent: Date:
CITY OF VA�
Federal 'Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 21 102564 00 Address: 1414 S 324TH ST Unit B-217
Project: HARSCH INVESTMENT PROPERTI FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is
not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule
inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you
are unsure about any of the inspections or the
inspection sequence. On -going inspections are logged on the back of this card.
Initial Erosion Control (4365)
®
Footings/Setback (4110) ® Re -steel (4215)
To be done PRIOR to breaking ground
Approved to place concrete Approved to place concrete or grout
Date
By
Date By Date
��By
L_ 1
Slab/Concrete Floor (4255)
0
Underfloor Framing (4285) Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor Approved to install flooring
By
Date
By
Date By Date
I l
Fire/Draft Stops (4095)
®
rior to scheduling a Framing inspection;
Interim Erosion Control (4370)[Electrical,
Approved
Approved Plumbing & Mechanical Rough -in
Fire/Draft Stop inspections must be signed -
By
Date
By
Date off and approved. IBC 109.3.4
®
Framing (4120)
10
Insulation (4150) 11 Gypsum Wallboard Nailing (4130)
Approved to insulate
Approved to install wallboard Approved to install mud & tape
By
Date
By
Date By Date
12
Suspended Ceiling Grid (4265)
13
Final - S K F & R (4060)
1A
Final - Planning
Approved to drop tile
Approved
Approved
By
Date
By
Date
By
Date
15 Final Erosion Control (4375) 9I; Final - Building (4050)
Approved Approved
By Date By A-0 Date 7
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date