Loading...
21-103092City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: VILLA CAPRI BLDG D Project Address: 2511 S 286TH PL Building - Multi Family Permit #:21-103092-00-MF Inspection Request Line: (253) 835-3050 Parcel Number: 552900 0200 Project Description: BLUEBEAM - Install a box (2x10 fire treated lumber with a size approx 48" x 19") below the 1-Hour rated ceiling to house an ERV in the main living area. The ERV is contained in the mechanical permit. The box could not be inspected from the mechanical permit. 26 Units. 1 per unit. Owner Applicant Con tr Lender MSC GP 2 LLC CRAIG CHRISTENSENRESICON RESICON ENERAL) 1200 S 336TH ST LLC I. ST FEDERAL WAY WA 98003 3914 CENTER ST 98409 rMA TACOMA WA 98409 d' r Census Category: 434 - Residential algadd - no chan nlber of units Includes: #1 " 42 #3 #4 Occupancy Class: Construction Type: Occupancy Load: # Floor Area Additional Permit Information Mechanical to be Included? .................... .... No Number of Stories................................................... I Is this an Online or O.T,C p 'cat ............... No Permit for Building Shell Only?.............................. No Plumbing to be Included..11 No Total Valuation: 2,600.00NJ No Fixtures ted With This Permit It CONDITIONS: Fire inspection is not required. PERMIT EXPIRES Sunday, 13 February, 2022 Permit Issued on Tuesday, August 17, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will rda hIF e,With the laws, rules and regulations of the State of Was " d tof Federal Way. C Owner or agent: Date: CITY OF 401�& Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQU TS: (253) 835-3050 PERMIT #: 21 103092 00 Address: 2511 S 286TH PL Bldg D Project: MSC GP 2 LLC FEDERAL WAY WA Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 1❑ Initial Erosion Control (4365) ® Footings/Setback (4110) Foundation Wall (4115) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete By Date By Date By Date El Drainage/Downspout (4040) Re -steel (4215) ® Slab/Concrete Floor (4255) Approved to backfill Approved to place concrete or grout Approved to place concrete By Date By Date By Date ® Underfloor Framing (4285) ® Floor Sheathing (4105) ® Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date i� Roof Sheathing (4220) 11 Fire/Draft Stops (4095) 9 z Interim Erosion Control (4370) Approved to install roofing Approved Approved By Date By Date By Date EElectrical, rior to scheduling a Framing inspection; 13 Framing (4120) 14 Insulation (4150) Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 By Date By Date 5 Gypsum Wallboard Nailing (4130) 7S Suspended Ceiling Grid (4265) EE Final - S K F & R (4060) Approved to install mud & tape Approved to drop tile Approved By Date By Date By Date i Il Final - Planning Final Erosion Control (4375) xt] Final - Building (4050) Approved Approved Approved By Date By Date By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date