Loading...
21-103089City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: VILLA CAPRI BLDG B Project Address: 28615 25TH PL S Building - Multi Family Permit #:21-103089-00-MF Inspection Request Line: (253) 835-3050 Parcel Number: 552900 0200 Project Description: BLUEBEAM - Install a box (2x10 fire treated lumber with a size approx 48" x 19") below the 1-Hour rated ceiling to house an ERV in the main living area. The ERV is contained in the mechanical permit. The box could not be inspected from the mechanical permit. 16 Units. 1 per unit. Owner Applicant Contractor Lender MSC GP 2 LLC CRAIG CHRISTENSENRESICON RESICON LLC (GENERAL) 1200 S 336TH ST LLC 3914 CENTER ST FEDERAL WAY WA 98003 3914 CENTER ST TACOMA WA 98409 TACOMA WA 98409 Census Category: 434 - Residential dt- o change in number of units Includes: #1 2 V. #4 Occupancy Class: I;Ay Construction Type.- Occupancy Load: Floor Area (sq. ft.) Additional Perm NNIorrnation Mechanical to be Included? ....... ...... No Number of Stories................................................... 'X Is this an Online or O.T.C. applirat ?No Permit for Building Shell Only? .............................. No Plumbing to be Included? ........................................ No4W Total Valuation: .00� ►� No Fixtuv ated With This Permit I CONDITIONS: Fire inspection is not required. PERMIT EXPIRES Sunday,13 February, 2022 Permit Issued on Tuesday, August 17, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of WashiFrl:EfFederal Way. Owner or agent: Date: CITY OF _ V' Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 103089 00 Project: MSC GP 2 LLC Address: 28615 25TH PL S Bldg B FEDERAL WAY WA Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El Initial Erosion Control (4365) 2❑ Footings/Setback (4110) 3❑ Foundation Wall (4115) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete By Date By Date By Date Drainage/Downspout (4040) ❑ Re -steel (4215) ® Slab/Concrete Floor (4255) Approved to backfill Approved to place concrete or grout Approved to place concrete By Date By Date By Date 0 Underfloor Framing (4285) ® Floor Sheathing (4105) ® Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date 10 Roof Sheathing (4220) Approved to install roofing By Date 11 Fire/Draft Stops (4095) Approved By Date By Interim Erosion Control (4370) Approved Date 9 5 Gypsum Wallboard Nailing (4130) 1 B Suspended Ceiling Grid (4265) iT Final - S K F & R (4060) Approved to install mud & tape Approved to drop tile Approved By Date By Date By Date 18 Final - Planning 1'i Final Erosion Control (4375) 2fl Final - Building (4050) Approved Approved "? Approved By Date By Date By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date