Loading...
21-102387City of Federal Way Community Development Dept. FILE 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: DACONES Project Address: 807 SW 349TH WAY Project Description: Remove/replace gas water heater Mechanical Permit #:21-102387-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 132174 0590 Owner Applicant Contractor GLENN B DACONES JASON HANLEYBROWNFAST WATER FAST WATER HEATER CO (GENERAL) 807 SW 349TH WAY HEATER COMPANY FASTW WH948BC (1/4/22) FEDERAL WAY WA 98023-8445 11715 NORTH CREEK PKWY S SUITE C-106 1715 NORTH CREEK PKWY S SUITE C-10 BOTHELL WA 98011 BOTHELL WA 98011 Additional Permit Information Mechanical Work Valuation? .................................. 1768 Is this an Online or O.T.C. application?.................. Yes Hot Water Tanks Mechanical Fixtures PERMIT EXPIRES Sunday, 12 December, 2021 Permit Issued on Tuesday, June 15, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washt n a e~ i i Federal Way. Owner or agent: in Date: A�� CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 102387 00 Address: 807 SW 349TH WAY Project: BERNADETTE DACONES FEDERAL WAY WA 98023-8445 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El Mechanical Rough -in (4165) Gas Piping (4125) ® Final - Mechanical (4065) Approved Approved to release test 1 dr ^ Tft2VJa Approved By Date By Date By Date 7 /ya) Rough Electrical Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date