Loading...
22-101581Electrical City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PROTTAS Project Address: 30503 7TH AVE SW Permit #:22-101581-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 178880 0160 Project Description: BLUEBEAM - 4.00kWDC Rooftop Photovoltaic Solar Installation; Main Service Panel Upgrade Owner Applicant Contractor JOSHUA PROTTAS JESUS FAMILIALUMIO LUMIO HX INC 30503 7TH AVE SW 2500 MOTTMAN RD SW SUITE 100 LUMI0H1784K4 (5/24/24) FEDERAL WAY WA 98023 TUMWATER WA 98501 2500 MOTTMAN RD SW SUITE 100 TUMWATER WA 98512 Additional Permit Information Is this an Online or O.T.C. application? ................. No Alt. Serv./Feeder: 0 to 200 aml MWh*ml Mures CONDITIONS: Fire conditions: Upon completion of installation, the following photographs shall be emailed to review@southkingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location of shutoff switch with signage. Email the photographs at least 2 business days before requesting electrical final. Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a response back from SKFR once the permit has been approved by SKFR so you can schedule your electrical final inspection. PERMIT EXPIRES Saturday, 22 April, 2023 Permit Issued on Monday, October 24, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washy IC15ity of Federal Way. Owner or agent: Date: _�k CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 101581 00 Address: 30503 7TH AVE SW Project: JOSHUA PROTTAS FEDERAL WAY WA 98023-3922 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q UFER Ground (4295) z❑ Ditch cover (4030) s❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) © Service (4235) Approved Approved Approved By Date By Date By Date Q Feeders/Sub-panels (4045) ® Rough Electrical (4225) ❑9 Final - S K F & R (4060) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) 9 o Ceiling Cover (4020) Approved By Date Approved By Date/'09 -`" G_ Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date I By Date By Date