Loading...
21-104730City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: STARBUCKS Project Address: 1301 S 320TH ST Building - Commercial Permit #:21-104730-00-CO Inspection Request Line: (253) 835-3050 Project Description: BLUEBEAM - Reconstruction of existing trash'tnclo�u 4 � Parcel Number: 150050 0040 Owner Applicant ontractor Lender MERLONE GEIER PARTNERS NATHAN ARNOLDFASTERCONSTRUCTIDN INC TENANT IS LENDER 457 SW 148TH ST SUITE 202 PERMITS 824 19TH ST W SUITE 440-C BURIEN WA 98166 2000 SW 1ST AVE QJITE420 TACOMA WA 98466 PORTLA DR 97201till. Census Category: 437 - Commercial alt / add nversion Includes: #2 43 #4 Occupancy Class: IV — Construction Type: Occupancy L F lqft Area ( q." s Additional Permit Information Mechanical to On,ded?................................... No r Plumbing Work Valuation?....................... Mechanical Work Valuation? ....................... Number of Stories...................................... Is this an Online or O.T.C. application?.. es Permit for Building Shell Only? ................ Plumbing to be Included? ....................... ............ No Total Valuation: 5,000.00 No Fixtures Associated With This Permit 11 PERMIT EXPIRES Monday, 27 June, 2022 Permit Issued on Wednesday, December 29, 2021 0 1 No I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: CITY cW Federal Way PERMIT #: 21 104730 00 THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS- (253) 835-3050 Address: 1301 S 320TH ST Project: MERLONE GEIER PARTNERS FEDERAL WAY WA 98003-5340 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Initial Erosion Control (4365) Footings/Setback (4110) Q Foundation Wall (4115) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete By Date By Date By Date ® Drainage/Downspout (4040) 0 Re -steel (4215) © Slab/Concrete Floor (4255) Approved to backfill Approved to place concrete or grout Approved to place concrete By Date By Date By Date 71 Underfloor Framing (4285) ® Floor Sheathing (4105) ® Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date 1.0 Roof Sheathing (4220) 11 Fire/Draft Stops (4095) 1 z Interim Erosion Control (4370) Approved to install roofing Approved Approved By Date By Date By Date Prior to scheduling a Framing inspection; 13 Framing (4120) 14 Insulation (4150) 1 Electrical, Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard and Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 1 By Date By Date 15 Gypsum Wallboard Nailing (4130) 75 Suspended Ceiling Grid (4265) 4T Final - S K F & R (4060) Approved to install mud & tape Approved to drop tile Approved By Date By Date By Date 18 Final Erosion Control (4375) 1& Final - Building (4050) Approved Approved By Date By Date Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date