Loading...
20-101603_. o rr T City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name Project Address Project Description ADDAI INVESTMENT GROUP LLC 2014 SW 306TH LN Building - Single Family Permit #:20-101603-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 122103 9154 BLUEBEAM - Construction of a 2255 square foot 2-story single family residence on existing foundation with an 80 square foot covered entry and a 600 square foot attached garage. Includes plumbing and mechanical. ***3 Bedrooms; $415,000 Estimated Selling Price*** Owner Applicant Contractor Lender ADDAI INVESTMENT GROUP LLC ADDAI INVESTMENT GROUP FORTNEY HOMES LLC OWNER IS LENDER 2014 SW 306TH LN LLC PO BOX 25 FEDERAL WAY WA 98023 2014 SW 306TH LN KIRKLAND WA 98083 FEDERAL WAY WA 98023 Census Category: 101 - New Single Family House Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 0.00 Additional Permit Information New / Additional Sq. Feet - I st Floor ..................... 1145 New / Additional Sq. Feet - 2nd Floor..................... 1110 New / Additional Sq. Feet - 3rd Floor ..................... 0 Occupancy # 1 - Area (Sq. Feet).............................. 0 New / Additional Sq. Feet - Basement .................... 0 Basic Plan?........................................................... No Occupancy # 1 -Construction Type ......................... Type V - B New / Additional Sq. Feet - Deck ........................... 0 New / Additional Sq. Feet - Garage ........................ 600 Mechanical to be Included?..................................... Yes Plumbing Work Valuation? ..................................... 2500 Mechanical Work Valuation?.................................. 4500 Number of Stories .................. ................................. 0 New / Additional Sq. Feet - Other:......:....... ...:........ 80 Plumbing to be Included? ........................................ Yes New / Additional Sq. Feet - Total........................... 2935 Will Certificate of Occupancy be Issued? ............... Yes Occupancy #1 - Use................................................ Residence (1 or 2 family) Comprehensive Plan Designation........ ................... SF - High -Density Zoning Designation................................................. RS 9.6 Residential Total Valuation: 303,932.20 Mechanical Fixtures Air Conditioners - Stand Alonf 1 Ducting 1 Furnaces l Gas Piping 1 Gas Pipe Outlets 4 Hot Water Tanks I Plumbing Fixtures Bathtubs 2 Dishwashers 1 Lavatories 4 Sinks 2 Water Closets 4 Hose Bibbs 2 CONDITIONS: No framing inspection until an approved fire sprinkler system is permitted, installed and inspected. A separate hermit is required for the automatic fire sprinkler system. T't '-, l 'a THIS CARD IS TO REMAIN ON -SITE Cl" or Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 101603 00 Address: 2014 SW 306TH LN Project: ADDAI INVESTMENT GROUP LLC FEDERAL WAY WA 98023-3428 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 SWM Precon Site Mtg (4400) Site Assessment (Erosion) (4365) Q Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By Date ® Foundation Wall (4115) 0 Drainage/Downspout (4040) © Plumbing Groundwork (4190) Approved to place concrete Approved to backfill Approved to cover By Date By Date By Date Slab/Concrete Floor (4255) 0 Underfloor Framing (4285) Q Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date Q Shear Walls (4245) Q Roof Sheathing (4220) 12 Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved By Date By Date By Date 13 Mechanical Rough -in (4165) 14 Gas Piping (4125) 0 Fire/Draft Stops (4095) Approved Approved to release test Approved By Date By Date By Date Interim Erosion Control (4370) ior to scheduling a Framing inspection; 37 Framing (4120) Approved Fand trical, Plumbing & Mechanical Rough -in Approved to insulate ire/Draft Stop inspections must be signed - By Date off and approved. IBC 109.3.4 By Date 0 Insulation (4150) 19 Gypsum Wallboard Nailing (4130) 20 Final Erosion Control (4375) Approved to install wallboard Approved to install mud & tape Approved By Date By Date By Date 0 Final - Mechanical (4065) 22 Final - Plumbing (4075) Final - Building (4050) Approved Approved Approved By Date By Date By Date Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date