22-103593Mechanical
City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Permit #:22-103593-00-ME
Inspection Request Line: (253) 835-3050
Project Name: ANYTIME FITNESS
Project Address: 1614 SW DASH POINT RD Parcel Number: 189880 0010
Project Description: BLUEBEAM - Replace a failing rooftop packaged HVAC unit
Owner
DASH POINT VILLAGE LLC
1201 PACIFIC AVE SUITE 1400
TACOMA WA 98402
Applicant
BRETT ROEBUCKAIR SYSTEMS
ENGINEERING INC
3602 S PINE ST
TACOMA WA 98409
Contractor
AIR SYSTEMS ENGINEERING INC
(GENERAL)
AIRSYE*229KN (2/1/24)
3602 S PINE ST
TACOMA WA 98409
Additional Permit Information
Mechanical Work Valuation? ............................ 25961 Is this an Online or O.T.C. application?.................. No
Mechanical Fixtures
Air Conditioners - Stand Alon( 1 ^Compressors / Heat Pumps 1 Roof Top Units 1
PERMIT EXPIRES Sunday,19 February, 2023
Permit Issued on Tuesday, August 23, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and th it e i rdance with the laws, rules and regulations of the State of
Fting d the City of Federal Way.
Owner or agent: % Date:
THIS CARD IS TO REMAIN ON -SITE -�
CITY OF Federal11a Construction Inspection Record
y INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22103593 00 Address: 1614 SW DASH POINT RD
Project: DASH POINT VILLAGE LLC FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
1 Mechanical Rough -in (4165) Q Gas Piping (4125) ® Final - Mechanical (4065)
Approved Approved to release test /� Approved
By Date By Date By AeX Date/,'���
EJ
Rough Electrical
❑ Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
13%. Date
By
Date