Loading...
22-103054- r. Building - Single Family City of Federal Way �� Permit #:22-103054-00-SF Community Development Dept. L ..i 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BELMOR MHP SPACE 334 Project Address: 2101 S 324TH ST Parcel Number: 162104 9037 Project Description: BLUEBEAM - Installation of a new manufactured home in a park Owner Applicant Contractor Lender METRO NORTHWEST LP TOM FULKERSONAMERICAN AMERICAN HOME CENTER 2101 S 324TH ST HOME CENTER 406 S 108TH ST FEDERAL WAY WA 98003 406 S 108TH ST S TACOMA WA 98444 TACOMA WA 98444 Census Category: 112 - New Manufactured/Factory-Built Home, IN PARK Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Is this an Online or O.T.C. application? ................. No Total Valuation: 4,331,60 No Fixtures Associated With This Permit it PERMIT EXPIRES Monday, 23 January, 2023 Permit Issued on Wednesday, July 27, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: AS, ciTr of Federal Way 1/_I Project: THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 22 103054 00 METRO NORTHWEST LP Address: 2101 S 324TH ST Space 334 FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TEAS GIRD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Blocking/Tie Downs (4015) 0 Skirting/Final (4250) Approved ^7 Approved By 6 Date G� BY bate ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date