22-103237City of Federal Way
Community Development Dept
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: CHEGE
Project Address: 30433 21ST AVE SW
Electrical
Permit #:22-103237-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 005100 0120
Project Description: BLUEBEAM - 16.00kWDC Rooftop Photovoltaic Solar Installation, Main Service Panel
QK Upgrade
Owner
Applicant
Contractor
JAMES NGANGA
SMART ENERGY TODAY
SMART ENERGY TODAY INC
30433 21ST AVE SW
2500 MOTTMAN RD SW SUITE 100
SMARTET869RJ (12/18/22)
FEDERAL WAY WA 98023
TUMWATER WA 98501
2500 MOTTMAN RD SW SUITE 100
TUMWATER WA 98501
Additional Permit Information
Is this an Online or O.T.C. application?....: _......... No
i Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 aml 1
CONDITIONS:
Fire conditions:
Upon completion of installation, the following photographs shall be emailed to review@southkingfire.org
- Finished installation showing 36" access from the ground and 18" clearance at roof peak.
- Location of shutoff switch with signage.
Email the nhoto2ranhs at least 2 business days before
ing electrical final.
PERMIT EXPIRES Wednesday, 29 March, 2023
Permit Issued on Friday, September 30, 2022
hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
/PZL -
4%,
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 103237 00 Address: 30433 21ST AVE SW
Project: MELVIS CHEGE FEDERAL WAY WA 98023-2306
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Q UFER Ground (4295)
0 Ditch cover (4030)
El Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By Date
By Date
By Date
Q Pool Bonding (4195)
Temporary Power (4275)
® Service (4235)
Approved
Approved
Approved
By Date
By Date
By Date
Q Feeders/Sub-panels (4045)
® Rough Electrical (4225)
® Final - S K F & R (4060)
Approved
Approved
Approved
By Date
By Date
By Date
o Ceiling Cover (4020) t Final - Electrical (4055)
Approved Approved
By Date By
❑
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
I By
Date
By
Date