Loading...
22-104930City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name Project Address Project Description CHAPIN 32731 6TH AVE SW FILE gas furnace and ac replacement / new tstat Electrical Permit #:22-104930-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 926491 0800 Owner Applicant Contractor RONALD J CHAPIN TAYLER MANNINGPACIFIC HEATING & PACIFIC HEATING & COOLING 32731 6TH AVE SW COOLING (ELECTRICAL) FEDERAL WAY WA 98023-5624 8607 DURANGO ST SW PACIFHC799DR (4/12/23) LAKEWOOD WA 98499 12811 PACIFIC 1-1WY S LAKEWOOD WA 98023 Additional Permit Information Is this an On]ine or O.T.C. application? .................. Yes Electrical Fixtures - Circuits - Residential 2 Thermostat 1 PERMIT EXPIRES Tuesday, 25 April, 2023 Permit Issued on Thursday, October 27, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of I ton and the City of Federal Way. Owner or agent: 1 C7 Date: THIS CARD IS TO REMAIN ON -SITE Cary Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 104930 00 Address: 32731 6TH AVE SW Project: LOURDES E CHAPIN FEDERAL WAY WA 98023-5624 Scheduled inspections maybe failed if this card is not on -site. DO NOT LOSE 'I'llIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 UFER Ground (4295) 0 Ditch cover (4030) Q Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ID Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date Q Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ® Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date it' Final - Electrical (4055) By Approved Date 40 ' f ❑ Rough Electrical ❑ Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date