Loading...
94-101023e {G MASTF�" `�A1oTD USEAPPLICATION l'PLrCATI®leT y::-j: , .RTMENT OF COMMUNITY DEVELOPMENT 33530 let Way South ♦ Federal Way, WA 98003 APPLICATION NO. j .Z� Date 5E pqq jr, Agent Name of Applicant �wller The Quadrant Corporation Federal Way National Little League Address P.O. Box 130, Bellevue, WA 98009 phone 455-2900 Signature QiJADRANT' FWNLL: Fed Way National Little League Owner Name/Address 2602 SW 332nd Place, Federal Way, WA 98023 phone 661-9194 (if different than applicant) First Ave. South, north of SW Campus Drive and First Ave. South Property Location Kroll NE 19-21-04 1�00 � W Zone Legal Description See attached _ Project Description See At Parcel Number(s) 192104-9004-07 MASTFRi.A Type of Permit Required: SEPA Notice Sign Checklist Mailed Board X Site Plan Review R Land Surface Modification R R Boundary Line Adjustment Binding Site Plan R R R cc Short Subdivision * * " } LU Subdivision R R R m Shoreline R R * w Variance R R R > a c. Conditional Use R R R w Use - Process I R R * A L Y Use - Process 11 R R R ; X Use - Process III R R Quasi -Judicial Rezone R R R Variance R* R R i3 Comp. Plan/Rezone R R Annexation R R Lot Line Elimination *Pre -Application Meeting R = Required * = Optional by City } k Ld t /- i' FIR ) AMERICAN TITLE (206) 728- )36 Page 2 TRW REDI PROPERTY PROFILE 04/21/94 Parcel Number : 192104-9004-07 ----------------------------------- ALL PARCELS INCLUDED WITH LAST SALE ----------------------------------- Parcel Number UseCode Total Value %Land !kImp. Total Ac. 192104-9003 901 $407,500 100.0 0.0 25.270 192104-9004 901 $354,100 100.0 0.0 21.360 202104-9008 901 $1,000 100.0 0.0 0.207 415920-0710 001 $237,400 0.0 0.0 0.000 4 $1,000,000 46.837 ------------- SALES HISTORY ------------- Buyer Name Date Sale Price Type Deed Excise# M Auditor No. OT FED WAY LITTLE LEAGU 871012 QUIT CLM 0968623 Y 871012-0694 QUADRANT CORP -------------------------------- CURRENT OWNERS FINANCING HISTORY -------------------------------- Auditor No. Type Transactn Loan Amt 1 Loan Amt 2 Down Paymnt °s Int 871012-0694 PURCHASE- ----------------- LEGAL DESCRIPTION ----------------- Plat Name: Vol/Page: Legal: 192104 4 PORS OF S 1/2 OF NE 1/4 & NE 1/4 OF SE 1/4 19-21-04 TGW POR OF S 1/2 OF SW 1/4 OF NW 1/4 20-21-4 DAF - BEG MOST SLY COR TR R-11 CAMPUS VIEW ADD 3 & NWLY MGN OF 1ST WAY S & TPOB TH ALG ANARC CRV TO LET RAD 850 FT C/A OF 29-26-59 AN ARC DIST OF 422.06 FTTAP OF REV CR V RAD OF 30 FT C/A OF 85-18-25 AN ARC DIST OF 44.67 FT TH N 81-45-00 W A DIST OF 1364 FT TAP ON NLY MGN OF SW CAMPUS DRTH N 08-15 E A DIS TOF 485 FT TH S 84-07-21 E A DIST OF 313.99 FT TH N 60-11-00 E A DIS T OF 350 FT TH S 74-55-42 E A DIST OF 609.45 FT TH S 48-36-26 E 400 FT TO POB- AKA LOT D KC-LLA 8702017 APPROVED8-8-87 TGW POR LYING SLY OF A LN DAF - BEG AT NW COR OF SE 1/4 OF NE 1/4 OF SD SEC TH S 01-08 -26 W 783.83 FT TH S 84-07-21 E 211.87 FT TH N 60-11-00 E 520.04 FT TH S 74-55-42 E 431.56 FT TO WLY MGN CAMPUS VIEW ADD DIV 3 & TERM OF SD LN AKA LOT A OF LLA 8809011 APPROVED 10-18-88 Information provided is deemed reliable, but is not guaranteed Copyright 1994 TRW-REDI Property Data Statement of Design Intent The First Avenue Basin Detention Pond will be constructed to provide stormwater detention for approximately 85 acres upstream of the pond and compensatory detention for an additional 27 acres downstream that will discharge undetained. An existing pond which detains flows for the entire basin (102 acres plus Panther Lake discharges) will be eliminated with the construction of a new commercial development. The new pond has been designed such that discharge is restricted to less than or equal to the current condition with the existing pond in place. The new pond will provide detention up to and including the 100-year runoff event. The project will perform in conjunction with the Panther Lake Flood Control Facility. During storms larger than the 50-year runoff event, the pond will overflow to the Panther Lake Ballfield Reservoir. This pond is in the process of being approved by Washington Department of Ecology Dam Safety Section. Page 1 c:\quacirant\pernrit.wpw April 11, 1994 f - .....ter •r tire• i ' ! BALLFIELD COMPLEX r �I I k DRAWNG NO. G1 G2 G3 G4 G5 G6 G7 G8 G9 G10 G11 �• 11-E L SHALL TO CC 1-W 2. CONTC BEEN METHC GROUT MINUS MAPPU FOR C SURFA 3. THE o MANAC MATTE MEMORANDUM Date: January 14, 1994 From: Andy Lukas 441 To: File, 14-7420-02 Subject: Analysis of Quadrant Pond Discharge Based on Panther Lake Original Conditions Scenario The new Quadrant pond discharge was determined for original conditions as defined by the Panther Lake Surface Water Study These conditions consist of the following: 1. 1987 Land Use 2. Naturally tributary drainage area 3. 1987 lake conditions Extended to the areas downstream of the Panther Lake discharge, this would also consist of the 127 acre area (as defined by the DOWL engineering report) at the 1987 land use condition and the pond at the northwest corner of 1st Avenue S and SW Campus Drive. This pond currently accepts undetained flows from the 127-acre tributary area and discharges from Panther Lake. Upon completion of the Panther Lake Flood Control Facility construction, it will also receive flows from the ballfield complex outfall. Two schematic figures are attached to this memo: one for original conditions and one for future conditions. First the 50-year and 100-year storms were used to determine the size of the new Quadrant pond. For these conditions, the new pond peak discharge goal was chosen to be equal to or less than the future condition peak discharge with the existing pond still in place. This assumes that development the Western Securities site would require removing the existing pond. I determined these goals to be 6.7 cfs and 2.8 cfs for the 50-year and the 100-year events, respectively. The reason for the 100-year goal being smaller than the 50-year is due to the new discharge created by the addition of the ballfield storage area, which does not discharge in the 50-year event. Choosing the discharge goals in this manner preserves the original detention provided at the discharge under SW Campus Drive. Tables 1 and 2 present the discharges from all areas in the 50- and 100-year events under original and future conditions, respectively. The figures attached to this memo show a schematic of the tributary basin. RECEIVED BY COMMUNITY DEVELOPMENT DEPARTMENT \quadrant\goalmem.wpw MAY 2 6 1994 Original Condition Analysis Page 2 Table 1. Original Condition Discharge Facility or area 50-year discharge, 100-year discharge, cfs cfs Panther Lake 9.3 10.9 Ballfield' 0.0 0.0 Inflow lz + Inflow 23 12.3 16.0 Existing pond 17.7 21.3 'The ballfield actually discharges less than 0.1 cfs in these events. 2Inflow 1 will be undetained after new pond is constructed. 3Inflow 2 will be detained by the new pond. Table 2. Future Condition Discharges Facility or area 50-year discharge, cfs Panther Lake 18.6 Ballfield 0.0' Inflow 1 (undetained) 4.5 Lake + Ballfield + Inflow 1 23.1 Inflow 2 (new pond inflow) 11.7 Total inflow to existing 34.9 pond Existing pond discharge' 29.8 New pond discharge goal' 6.7 Actual new pond discharge 1.4 Reduction in peak 88V 100-year discharge, cfs 19.0 6.3 5.7 31.0 15.0 36.0 33.7 3.1 2.7 82% 'The ballfield actually discharges less than 0.1 cfs in this events. 2Assumes Western Securities site was developed without removing existing pond. 'Goal = Total inflow to existing pond - Existing pond discharge. "Reduction = (Inflow 2 - New pond discharge) _ Inflow 2 x 100%. A 2-acre (top area) pond is required to achieve this discharge goal of 3.1 cfs in the 100-year event is detailed in the attached spreadsheet printout. I then tested the pond for discharge in the 2-, 10-, and 25-year events. This required determining appropriate 2-, 10-, and 25-year events. I developed statistics for the annual maximum discharges from the existing pond to determine what would be the appropriate storms on a regional basis. Attached are spreadsheet prints and a discharge frequency \quadrant\goalmem.wpw original Condition Analysis Page 3 curve that were used to decide on the storms. The results of the small storm analysis are presented in Tables 3, 4, and 5. Charts showing the timing of the storm responses are also attached. Some explanation of the 25-year event discharge from Panther Lake is required. All runoff events were determined from peak discharges from the existing pond. In the case of the 25-year event, this peak occurred during an event in which the lake level was rather low, and consequently the discharge from the lake during this event was somewhat lower than otherwise expected. The peak discharge from the existing pond is mainly due to the inflows received from areas other than Panther Lake. Table 3. 2-Year Storm Analysis Results Storm Date 12/25/1957 Area original Condition peak discharge, cfs Panther Lake 2.1 Inflow 1 (undetained in future) 1.1 Inflow 2 (flows to new pond in 10.3 future) Existing pond 14.0 New pond n/a Total discharged under SW Campus 14.0 Drivel Future Condition peak discharge, cfs 9.2 4.4 11.2 n/a 0.7 14.2 'This peak is less than sum of peaks in future condition due to the specific timing of each peak. See attached spreadsheet for detail. \quadrant\goalmem.wpw original Condition Analysis Table 4. 10-Year Storm Analysis Results Storm Date 2/28/1972 Page 4 Area Original condition Future condition peak discharge, peak discharge, cfs cfs Panther Lake 6.9 17.4 Inflow 1 (undetained in future) 2.0 5.5 Inflow 2 (flows to new pond in 13.5 14.8 future) Existing pond 19.8 n/a New pond n/a 1.2 Total discharged under SW Campus 19.8 24.1 Drivel 'This peak is less than sum of peaks in future condition due to the specific timing of each peak. See attached spreadsheet for detail. Table 5. 25-Year Storm Analysis Results Storm Date 11/5/1986 Area original Future Condition Condition peak discharge, peak discharge, cfs cfs Panther Lake 1.9 16.1 Inflow 1 (undetained in future) 2.0 8.4 Inflow 2 (flows to new pond in 20.4 23.1 future) Existing pond 26.2 n/a New pond n/a 1.2 Total discharged under SW Campus 26.2 25.7 Drive' 'This peak is less than sum of peaks in future condition due to the specific timing of each peak. See attached spreadsheet for detail. This analysis shows that the 2-year discharge under SW Campus Drive, with the new pond configuration, under future conditions is nearly the same as that for the original conditions. Furthermore, the 25-year future condition discharge is less than \quadrant\goalmem.wpw Original Condition Analysis Page 5 that for original conditions. The 10-year discharge is approximately 22 percent higher in the future than in the original condition; however, this is due to the major increase in peak discharge from Panther Lake caused by land use changes and addition of the two sub -drainage basins (WH15 and WH16). This amounts to a 10.5 cfs increase (or 200 percent) in peak discharge. The new pond actually reduced its inflow peak by 92 percent. Therefore, it would be very difficult to achieve this 10-year original condition peak discharge due to the effect of the lake. Conclusions. The pond, as configured, will provide the same level of flood protection as that achieved by the Panther Lake Flood Control Facility. Also, it preserves the 2- and 25-year original condition peak discharges with developed conditions. The original condition discharge during the 10-year storm is not met under future conditions, but this is due to the large increase in Panther Lake's discharge. This configuration allows for the Western Securities Site to be developed without additional on -site detention. Attachments cc: Bob Gatz, Project Manager Steve Merrill, Project Advisor \quadrant\goalmem.wpw QFIGUREAS Original Condition 1987 Land Use, WH 15 and WH 16 disconnected from lake Inflow )us Drive This figure is schematic in nature. Page 1 QFIGURE.XLS Future Condition Future build -out land use, all connections in place Lake Inflow 2 C)ew Quadrant pond Discharge under 5W Gampus Drive This figure is schematic in nature. Page 2 100YFU02.INP RUN GLOBAL *** DEVELOPED CONDITION OF PANTHER LAKE AND WESTERN SECURITIES TRIBUTARY AREAS *** INSTALLED QUADRANT OFFSITE POND TO DETAIN ITS TRIB AREA AND PROVIDE COMPENSATORY *** DETENTION FOR OTHER AREAS. *** POND UTILIZES MAXIMUM AMOUNT OF EASEMENT FROM LITTLE LEAGUE AT TOP *** SHOOTING FOR ORIGINAL CONDITION 100-YEAR PEAK DISCH,RGE GOAL OF 2.8 CFS *** REVISED CHOSEN POND CONFIGURATION FOR HYDRAULIC CONCERNS -- PROMOTE SPILL TO BALLFIELDS *** RECONFIGURED SPILLWAY AFTER DAM SAFETY ANALYSIS -- CHECK FREEBOARD IN 100-YEAR PANTHER LAKE PRODUCTION FILE FUTURE LU START 1951/02/01 00:00 END 1951/02/15 24:00 RUN INTERP OUTPUT LEVEL 0 RESUME 0 RUN 1 TSSFL 15 WDMSFL 16 END GLOBAL FILES <FILE> <UN#>++x<---- FILE NAME ------------------------------------------------- > WDM 21 \HSPF9\QUADRANT.WDM MESSU 22 100YFU02.LIS 31 100YFU02.DAT INFO 23 \hspfl0\HSPINF.DA ERROR 24 \hspfl0\HSPERR.DA WARN 25 \hspfl0\HSPWRN.DA END FILES OPN SEQUENCE INGRP INDELT 1:00 PERLND 12 PERLND 16 PERLND 18 PERLND 22 PERLND 26 PERLND 28 PERLND 32 PERLND 42 IMPLND 12 PERLND 52 COPY 1 RCHRES 1 RCHRES 2 RCHRES 3 RCHRES 4 RCHRES 6 RCHRES 10 RCHRES 20 PLTGEN 1 END INGRP END OPN SEQUENCE PERLND GEN-INFO <PLS > Name NBLKS 12 TF/MILD 16 TF/MODERATE 18 TF/STEEP 22 TG/MILD 26 TG/MODERATE 28 TG/STEEP 32 OF/MILD 42 OG/MILD 52 WETLANDS END GEN-INFO ACTIVITY <PLS > *********+*** Active # - # ATMP SNOW PWAT SED 12 52 0 0 1 0 END ACTIVITY PRINT -INFO <PLS > *+++x*xx+xxx+xxxxx*x* # - # ATMP SNOW PWAT SED 12 52 0 0 6 0 END PRINT -INFO PWAT-PARM1 1 1 1 1 1 1 1 1 1 Unit -systems User t-series in out 1 i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Printer Engl Metr 6 0 6 0 6 0 6 0 6 0 6 0 6 0 6 0 6 0 sections ++++++++++++*++++++++++*+++++ PST PWG PQAL MSTL PEST NITR PHOS TRAC 0 0 0 0 0 0 0 0 *** Print -flags *******+xx***x*********** PIVL PYR PST PWG PQAL MSTL PEST NITR PHOS TRAC ********* 0 0 0 0 0 0 0 0 1 9 <PLS > xx+x*++xx*+x*x++x Flags **xx**xxxx+*x*x*w*** # - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE *** 12 52 0 0 0 0 0 0 0 0 0 END PWAT-PARM1 PWAT-PARM2 <PLS > *** # - # ***FOREST 12 0.75 16 0.75 18 0.75 22 0.05 26 0.05 28 0.05 32 0.75 42 0.05 52 0.75 END PWAT-PARM2 PWAT-PARM3 <PLS >*** # - #*** PETMAX 12 16 18 22 26 28 32 42 52 END PWAT-PARM3 PWAT-PARM4 <PLS > # - # CEPSC 12 0.2000 16 0.2000 18 0.2000 22 0.1000 26 0.1000 28 0.1000 32 0.2000 42 0.1000 52 0.1000 END PWAT-PARM4 PWAT-STATEI <PLS > PWATER stat # - #*** CEPS 12 0.065 16 0.065 18 0.065 22 0.000 26 0.000 28 0.000 32 0.065 42 0.000 52 0.000 END PWAT-STATEI END PERLND IMPLND GEN-INFO <ILS > Name e LZSN INFILT LSUR SLSUR KVARY AGWRC 4.5000 0.0800 400.00 0.0500 0.5000 0.9960 4.5000 0.0800 400.00 0.1000 0.5000 0.9960 4.5000 0.0800 200.00 0.2000 0.5000 0.9960 4.5000 0.0300 400.00 0.0500 0.5000 0.9960 4.5000 0.0300 400.00 0.1000 0.5000 0.9960 4.5000 0.0300 200.00 0.2000 0.5000 0.9960 5.0000 2.0000 400.00 0.0500 0.3000 0.9960 5.0000 0.8000 400.00 0.0500 0.3000 0.9960 4.0000 2.0000 100.00 0.0010 0.5000 0.9960 PETMIN INFEXP INFILD DEEPFR BASETP AGWETP 2.0000 2.0000 1.00 0. 0. 2.0000 2.0000 1.00 0. 0. 1.5000 2.0000 1.00 0. 0. 2.0000 2.0000 1.00 0. 0. 2.0000 2.0000 1.00 0. 0. 1.5000 2.0000 1.00 0. 0. 2.0000 2.0000 1.00 0. 0. 2.0000 2.0000 1.00 0. 0. 10.000 2.0000 1.00 0. 0.7 «*x UZSN NSUR INTFW IRC LZETP*** 1.0000 0.3500 3.000 0.7000 0.7000 0.5000 0.3500 6.000 0.5000 0.7000 0.3000 0.3500 7.000 0.3000 0.7000 0.5000 0.2500 3.000 0.7000 0.2500 0.2500 0.2500 6.000 0.5000 0.2500 0.1500 0.2500 7.000 0.3000 0.2500 0.5000 0.3500 0.000 0.7000 0.7000 0.5000 0.2500 0.000 0.7000 0.2500 3.0000 0.5000 1.000 0.7000 0.8000 variables*** SURS UZS IFWS LZS AGWS GWVS 0.000 2.091 0.052 7.591 0.000 0.000 0.000 1.056 0.004 7.560 0.000 0.000 0.000 0.642 0.000 7.631 0.000 0.000 0.000 1.088 0.081 7.090 0.000 0.000 0.000 0.531 0.006 6.968 0.000 0.000 0.000 0.306 0.000 6.975 0.000 0.000 0.000 0.558 0.000 8.974 0.000 0.000 0.000 0.964 0.000 9.273 0.000 0.000 0.000 5.632 0.028 7.096 0.000 0.000 Unit -systems Printer *** User t-series Engl Metr *** in out "** 12 IMPERVIOUS 1 1 1 6 0 END GEN-INFO ACTIVITY <ILS > ************* Active # - # ATMP SNOW IWAT SLD 12 0 0 1 0 END ACTIVITY PRINT -INFO <ILS > ******** Print -flags # - # ATMP SNOW IWAT SLD 12 0 0 6 0 END PRINT -INFO IWAT-PARM1 <ILS > Flags # - # CSNO RTOP VRS VNN 12 0 0 0 0 END IWAT-PARMl IWAT-PARM2 <ILS > # - # LSUR SLSUR 12 500.00 0.0100 END IWAT-PARM2 IWAT-PARM3 <ILS > Sections **** IWG IQAL «xx 0 0 ******** PIVL PYR IWG IQAL ********* 0 0 1 9 *** RTLI *** 0 NSUR RETSC 0.1000 0.1000 xxx User t-series Engl Metr *** in out "** 12 IMPERVIOUS 1 1 1 6 0 END GEN-INFO ACTIVITY <ILS > ************* Active # - # ATMP SNOW IWAT SLD 12 0 0 1 0 END ACTIVITY PRINT -INFO <ILS > ******** Print -flags # - # ATMP SNOW IWAT SLD 12 0 0 6 0 END PRINT -INFO IWAT-PARM1 <ILS > Flags # - # CSNO RTOP VRS VNN 12 0 0 0 0 END IWAT-PARMl IWAT-PARM2 <ILS > # - # LSUR SLSUR 12 500.00 0.0100 END IWAT-PARM2 IWAT-PARM3 <ILS > Sections **** IWG IQAL «xx 0 0 ******** PIVL PYR IWG IQAL ********* 0 0 1 9 *** RTLI *** 0 NSUR RETSC 0.1000 0.1000 xxx # - # PETMAX PETMIN 12 END IWAT-PARM3 IWAT-STATEI <ILS > IWATER state variables # - # RETS SURS 12 1.0000E-3 1.0000E-3 END IWAT-STATEI END IMPLND EXT SOURCES *** NOTE: The only RCHRES that precip and PET are applied to are lakes. <-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vvls> <-Grp> <-Member-> <Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # WDM 10 PREC ENGL 1.19 PERLND 12 52 EXTNL PREC WDM 10 PREC ENGL 1.19 IMPLND 12 EXTNL PREC WDM 10 PREC ENGL 1.19 RCHRES 5 20 EXTNL PREC WDM 20 EVAP ENGL .75 PERLND 12 52 EXTNL PETINP WDM 20 EVAP ENGL .75 IMPLND 12 EXTNL PETINP WDM 20 EVAP ENGL .75 RCHRES 5 20 EXTNL POTEV WDM 600 FLOW ENGL RCHRES 20 EXTNL IVOL WDM 600 FLOW ENGL 12.1 PLTGEN 1 INPUT MEAN 1 END EXT SOURCES NETWORK *** NOTE: MFACTOR= 53.33 X SEGMENT AREA (SQ.MILES) TO CONVERT INCHES TO AC -FT. *** SUB -BASIN WH15 *** <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** N # <Name> # #<-factor->strg <Name> # # <Name> # # m*** < ae> *** CHANNEL NETWORK LINKAGES *** *** AGWO AND IFWO ASSUMED LOST TO ADVANCE OUTWASH (DEEP FR SET TO 1) *** LAYER IN WH12, WH13, WH14 (PANTHER LK TRIBUTARY). *** SUB -BASIN WH16 RUNOFF FROM LAND SEGMENTS *** SUB -BASIN WH16 RUNOFF FROM LAND SEGMENTS PERLND 22 PWATER SURO 1.583E RCHRES 4 EXTNL IVOL PERLND 26 PWATER SURO 1.4688 RCHRES 4 EXTNL IVOL PERLND 28 PWATER SURO 1.8375 RCHRES 4 EXTNL IVOL PERLND 42 PWATER SURD 0.7088 RCHRES 4 EXTNL IVOL IMPLND 12 IWATER SURO 2.4263 RCHRES 4 EXTNL IVOL *** SUB -BASIN WH15 RUNOFF FROM LAND SEGMENTS PERLND 12 PWATER SURO 0.9417 RCHRES 1 EXTNL IVOL PERLND 22 PWATER SURO 20.0214 RCHRES 1 EXTNL IVOL PERLND 26 PWATER SURO 4.2393 RCHRES 1 EXTNL IVOL IMPLND 12 IWATER SURO 14.4185 RCHRES 1 EXTNL IVOL *** SUB -BASIN WH14 RUNOFF FROM LAND SEGMENTS PERLND 12 PWATER SURO 0.8167 RCHRES 2 EXTNL IVOL PERLND 16 PWATER SURO 0.1333 RCHRES 2 EXTNL IVOL PERLND 18 PWATER SURO 0.9583 RCHRES 2 EXTNL IVOL pERLND 22 PWATER SURO 7.3295 RCHRES 2 EXTNL IVOL PERLND 26 PWATER SURD 3.4017 RCHRES 2 EXTNL IVOL PERLNO 28 PWATER SURO 2.3596 RCHRES 2 EXTNL IVOL PERLND 32 PWATER SURO 0.1417 RCHRES 2 EXTNL IVOL PERLND 42 PWATER SURO 7.1153 RCHRES 2 EXTNL IVOL pERLND 52 PWATER SURO 1.0083 RCHRES 2 EXTNL IVOL IMPLND 12 IWATER SURO 14.1356 RCHRES 2 EXTNL IVOL *** PANTHER LAKE TRIBUTARY AREA PERLND 22 PWATER SURO 1.7060 RCHRES 6 EXTNL IVOL PERLND 26 PWATER SURO 1.2205 RCHRES 6 EXTNL IVOL PERLND 28 PWATER SURO 0.4623 RCHRES 6 EXTNL IVOL PERLND 42 PWATER SURO 2.0875 RCHRES 6 EXTNL IVOL IMPLND 12 IWATER SURO 1.9654 RCHRES 6 EXTNL IVOL *** SUB -BASIN WH12 RUNOFF FROM LAND SEGMENTS PERLND 12 PWATER SURO 0.3500 RCHRES 3 EXTNL IVOL PERLND 16 PWATER SURO 0.4167 RCHRES 3 EXTNL IVOL PERLND 22 PWATER SURO 7.1447 RCHRES 3 EXTNL IVOL PERLND 26 PWATER SURO 1.0411 RCHRES 3 EXTNL IVOL PERLN❑ 28 PWATER SURF] 1.2345 RCHRES 3 EXTNL IVOL PERLND 42 PWATER SURO 1.6223 RCHRES 3 EXTNL IVOL IMPLND **a 12 IWATER SURO 7.9242 RCHRES 3 EXTNL IVOL *** EXISTING POND INFLOWS *** TRIB TO NEW NORTH POND PERLND 18 PWATER SURO 0.6250 COPY 1 INPUT MEAN 1 PERLND 22 PWATER SURO 0.2667 COPY 1 INPUT MEAN 1 PERLND 26 PWATER SURO 2.9713 COPY 1 INPUT MEAN 1 IMPLND 12 IWATER SURO 3.2203 COPY 1 INPUT MEAN 1 *** VAULT 1 SUB -BASIN 2 PERLND 22 PWATER SURO 0.0264 COPY 1 INPUT MEAN PERLND 26 PWATER SURO 0.5250 COPY 1 INPUT MEAN 2 PERLND 28 PWATER SURO 0.0249 COPY 1 INPUT MEAN 2 PERLND 42 PWATER SURO 0.0368 COPY 1 INPUT MEAN 2 IMPLND 12 IWATER SURO 0.5570 COPY 1 INPUT MEAN 2 *** VAULT 2 SUB -BASIN PERLND 42 PWATER SURO 0.1138 COPY 1 INPUT MEAN 2 IMPLND 12 IWATER SURO 0.6446 COPY 1 INPUT MEAN 2 *** ROOFTOP SUB -BASIN IMPLND 12 IWATER SURD 0.2000 COPY 1 INPUT MEAN 2 *+. ++. RCHRES 1 HYDR ROVOL 1 RCHRES 2 EXTNL IVOL RCHRES 2 HYDR ROVOL 1 RCHRES 6 EXTNL IVOL RCHRES 3 HYDR ROVOL 1 RCHRES 6 EXTNL IVOL RCHRES 4 HYDR ROVOL 1 RCHRES 6 EXTNL IVOL ***RCHRES 6 HYDR OVOL 3 RCHRES 20 EXTNL IVOL RCHRES 10 HYDR OVOL 2 RCHRES 20 EXTNL IVOL COPY 1 OUTPUT MEAN 1 RCHRES 10 EXTNL IVOL RCHRES 6 HYDR O 1 PLTGEN 1 INPUT POINT 1 ***RCHRES 6 HYDR 0 3 PLTGEN 1 INPUT POINT 2 RCHRES 6 HYDR STAGE 1 PLTGEN 1 INPUT POINT 2 RCHRES 20 HYDR 0 1 PLTGEN 1 INPUT POINT 3 RCHRES 20 HYDR STAGE 1 PLTGEN 1 INPUT POINT 4 RCHRES 10 HYDR STAGE 1 PLTGEN 1 INPUT POINT 5 RCHRES 10 HYDR 0 1 PLTGEN 1 INPUT POINT 6 RCHRES 10 HYDR 0 2 PLTGEN 1 INPUT POINT 7 COPY 1 OUTPUT MEAN 1 12.1 PLTGEN 1 INPUT MEAN 2 COPY 1 OUTPUT MEAN 2 12.1 PLTGEN 1 INPUT MEAN 3 END NETWORK RCHRES GEN-INFO RCHRES Name Nexits Unit Systems Printer # - #<------------------ >< --- > User T-series Engl Metr LKFG in out 1 WH15 - CLOSED BASIN 1 1 1 1 6 0 0 2 WH14 1 1 1 1 6 0 0 3 WH12 1 1 1 1 6 0 0 4 WH16 1 1 1 1 6 0 0 5 EXISTING POND 2 1 1 1 6 0 1 6 WH13 - PANTHER LK#2 3 1 1 1 6 0 1 10 QUADRANT POND 2 1 1 1 6 0 1 20 SECONDARY STORE LLC 2 1 1 1 6 0 1 END GEN-INFO ACTIVITY RCHRES *****+*++**+++a Active Sections # - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG 1 20 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT -INFO RCHRES *t.*..*+...+.++ Printout Flags +a..++*.+++++**+** PIVL PYR # - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB ********* 1 20 6 0 0 0 0 0 0 0 0 0 1 9 END PRINT -INFO HYDR-PARM1 RCHRES Flags for each HYDR Section # - # VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for FG FG FG FG possible exit ***-possible exit possible **+ *++ each exit 1 4 0 0 0 0 4 0 0 0 0 0 0 0 0 0 2 2 2 2 2 5 0 1 0 0 4 5 0 0 0 0 0 0 0 0 2 2 2 2 2 6 0 1 0 0 4 5 6 0 0 0 0 0 0 0 2 2 2 2 2 10 20 0 1 0 0 4 5 0 0 0 0 0 0 0 0 2 2 2 2 2 END HYDR-PARM1 HYDR-PARM2 RCHRES # - # FTABNO LEN DELTH STCOR KS DB50 *** .+* 1 2 1.042 0.0 2 2 1.042 0.0 3 3 1.421 0.0 4 4 0.152 0.0 5 5 0.133 218.0 0.5 6 6 0.133 238.6 0.5 10 10 0.1 245.5 0.5 20 20 0.133 253.0 0.5 END HYDR-PARM2 HYDR-INIT RCHRES Initial conditions for each HYDR section +++ # - # *** VOL Initial value of COLIND Initial value of OUTDGT *** ac-ft for each possible exit for each possible exit <------><-------- > <--- ><--- ><--- x--- >< --- > •*+ <---><---><--- ><--- ><---> 1 0.0 4.0 2 0.0 3 0.0 4 0.0 5 0.0 6 56.0 10 0.0 20 0.12 END HYDR-INIT END RCHRES FTABLES FTABLE Rows Cols 4 4 Depth (ft) 0.0 0.5 3.0 8.0 END FTABLE FTABLE Rows Cols 4 4 Depth (ft) 0.0 0.5 3.0 6.0 END FTABLE FTABLE Rows Co1S 3 4 Depth (ft) 0.0 0.5 3.0 END FTABLE FTABLE ROWS COLS 8 5 DEPTH (FT) 0. 2. 4. 6. B. 10. 12. 12.2 END FTABLE FTABLE ROWS COLS 16 6 DEPTH (FT) 0.0 7.4 8.8 9.4 11.4 13.4 14.4 14.9 16.4 17.4 18.8 19.3 19.8 20.3 20.8 21.5 END FTABLE FTABLE ROWS COLS 11 5 DEPTH 4.0 4.0 4.0 4.0 5.0 4.0 5.0 6.0 4.0 5.0 4.0 5.0 2 (WH14) Area Volume Outflowl (acres) (acre-ft) (cfs) 0.0 0.0 0.0 0.57 0.27 2.0 13.1 17.3 50.0 14.0 84.3 650.0 2 3 (WH12) Area Volume outflowl (acres; (acre-ft) (cfs) 0.0 0.0 0.0 0.51 0.26 1.00 0.86 2.07 55.0 1.21 5.17 230. 3 4 (WH16) Area Volume outflowl (acres) (acre-ft) (cfs) 0.0 0.0 0.0 0.51 0.26 1.00 0.86 2.07 55.0 4 5 EXISTING POND AT 1ST AVENUE SOUTH AND 336TH ST (CAMPUS DRIVE) AREA (ACRES) 0. 0.19 0.55 0.67 0.76 0.9 1.9 2.9 5 6 (WH13) VOLUME (ACRE -FT) 0. 0.19 0.93 2.14 3.57 5.23 8.04 8.52 OUTFLOWI (CFS) 0. 10. 30. 38. 44. 64. 90. 92.6 OUTFLOW2 (CFS) 0. 0. 0. 0. 0. 0. 0. 90.67 PANTHER LAKE #2 OVERFLOW TO BALLFIELD AREA VOLUME OUTFLOWI OUTFLOW2 OUTFLOW3 (ACRES) (ACRE -FT) (CPS) (CFS) (CFS) 0.0 0.0 0.0 0.0 0.0 10.6 38.5 0.0 0.23 0.0 15.8 55.1 0.0 0.35 0.0 15.9 63.2 2.0 0.41 0.0 18.1 95.3 9.0 0.66 0.0 20.4 133.7 13.2 0.89 0.0 22.2 155.1 15.0 1.02 0.0 22.3 165.5 16.0 1.09 0.0 23.6 199.5 17.2 1.30 0.0 24.9 223.8 17.8 1.45 0.0 25.0 258.8 18.6 1.75 0.0 25.1 270.3 18.9 1.85 44.0 25.1 282.9 19.0 1.96 130. 25.1 295.5 19.2 2.00 249. 25.1 308.0 19.6 2.07 399. 25.1 325.6 19.9 2.15 660. 6 10 NEW QUADRANT OFFSITE POND *** PIPED SPILLED *** AREA VOLUME OUTLET TO BALLFIELD*** .*. .** (FT) (ACRES) (AC -FT) DISCH DISCH (CFS) (CFS) *** .000 .000 .0000 .0000 .0000 2.22 1.14 2.37 0.64 .0000 4.44 1.29 5.07 0.90 .0000 6.66 1.44 8.10 1.10 .0000 8.88 1.61 11.48 1.27 .0000 11.1 1.78 15.24 1.42 .0000 11.2 1.79 15.42 1.54 0.31 11.5 1.81 15.96 2.30 2.48 12.0 1.85 16.87 4.07 8.38 12.5 1.89 17.B1 6.02 16.25 13.0 1.93 18.77 7.83 75.21 END FTABLE 10 FTABLE 20 ROWS COLS SECONDARY STORAGE AT LITTLE LEAGUE COMPLEX *** 5 5 DEPTH AREA VOLUME OUTFLOWI OUTFLOW2 +** (FT) (ACRES) (ACRE -FT) (CFS) (CFS) **+ 0.0 0.0 0.0 0.0 0.0 0.5 18.6 9.3 4.8 0.0 3.0 18.6 56.0 5.1 0.0 3.4 18.6 63.4 5.4 0.0 3.6 18.6 67.1 6.5 0.0 END FTABLE 20 END FTABLES PLTGEN PLOTINFO # - # FILE NPT NMN LABL PYR PIVL *** 1 31 7 3 0 9 24 END PLOTINFO GEN-LABELS # - #<-------------- TITLE ------------------ > +++ <------- YLABL-----> 1 PANTHER LAKE STAGE AND DISCHARGE 100 YR DAILY MAXIMUM END GEN-LABELS SCALING <-RANGE><--YMIN--><--YMAX--><--IVLIN-><-THRESH-> *** # # RRR 1 0. 1500. 20. END SCALING CURV-DATA <-RANGE> < ----- LABEL ---- ><LIN><INT><COL> <TR> *** 1 LAKE DISCHARGE MAX END CURV-DATA CURV-DATA <-RANGE> < ----- LABEL ---- ><LIN><INT><COL> <TR> *** # # krtR 1 LAKE STAGE MAX END CURV-DATA CURV-DATA <-RANGE> < ----- LABEL ---- ><LIN><INT><COL>:<TR> *** 1 BALLFIELD DISCH MAX END CURV-DATA CURV-DATA <-RANGE> < ----- LABEL ---- ><LIN><INT><COL> <TR> *** 1 BALLFIELD STAGE MAX END CURV-DATA CURV-DATA <-RANGE> < ----- LABEL ---- ><LIN><INT><COL> <TR> *** # # +RR 1 POND STAGE MAX END CURV-DATA CURV-DATA <-RANGE> < ----- LABEL ---- xLIN><INT><COL> <TR> *** 1 POND DISCHARGE MAX END CURV-DATA CURV-DATA <-RANGE> < ----- LABEL ---- x LIN><INT><COL> <TR> *** 1 POND OVERFLOW MAX END CURV-DATA CURV-DATA <-RANGE> <----- LABEL ---- ><LIN><INT><COL> <TR> *** 1 LAKE OVERFLOW MAX END CURV-DATA CURV-DATA <-RANGE> <----- LABEL ---- ><LIN><INT><COL> <TR> '*• # # r+r 1 POND INFLOWS MAX END CURV-DATA CURV-DATA <-RANGES < ----- LABEL ---- ><LIN><INT><COL> <TR> *** 1 UNDETAINED RUNOF MAX END CURV-DATA END PLTGEN COPY TIMESERIES COPY-OPN *** # - # NPT NMN*** 1 0 2 END TIMESERIES END COPY END RUN N l'l l'l N O O O O O O W WW WWWW O AOON...INOrrbNl•1Pm0 ONl.1b b.-1Pm N.-lrNlOmP 01.10 NOmNNrONbmNmr OOb!ln10NNblPbbbl.l •NP •N�in .-.� ~N.1H .lN l.1NN O o 0 0 0 0 0 0 .yN .�NIMN 1.1 00 0000 W WW WWWW o NONNlo No.. nlwol.+b o PlnmNNlr.-.N n�o ..or o In viPNNmlrPNrOPmb �mrlN.-InNN •Pn��mr NN nr O O O N W O O O O O O O O O O P O 0 0 0 0 O O O O O O O O O O b 0 0 0 0 0 O O O O O O O O O P P O 0 0 0 0 rY O O O O O O O O N O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O W O O O O O O O O O N m 0 0 0 0 0 O O O O O O O O O P! 0 0 0 0 0 000000000.-1000000 O O O O O O O O O • N 0 0 0 0 0 O O O O O O O O O O O O O O O O.-1 PPmbNbONNI.IPNlN O Nb 01•lm (VrmNPr.-IbNN ObPOlr.lmONll.l 1.1 .y 01.1 O7 1: b l•1!M1 In rl rl r1 •-1 rl 0 0 0 0 0 0 0 0~ O 00lON•�mb'l l•lNlM1NP! N lNlnrnrvPrrvb.�mlw rrl . . . . . . . . . . . . . . . . NrmmrrM1m�NNN�NN� N fVNNNNNNNNNNNNNN ❑­M�- n m -- b b r b! N N N m O P P b N O M1 � � OOOOOOOO Ol1N.-1 b.yb0 1.l lnm n1l111 f.11.11.1bbbNN!! lO N N N N N N N N N N N N N N F o m` l.�Tr o .•�ic xc sx xxK.xC .xCx ex .+•�•+•+•+•+-�-� p0777 0 •pE�Tx���7C 7C�F o0000000 W N00 p1NNNN 4.Y � NbNNNrr PI.�nNNNPNm e Gib 1•tOrPbl•fM1Pl.lbmlP!•+m � � y P�M1 M1I.IN Nl.1N N.-1,l NPl.lb .-1 C 7 'Y � y ti rN000lNnllNOPPm b M1mbl.lH.-ll.wNbNN!!! .a ;� p0 C q p g O v 0 0 0 p O p O O O O O O O O O p L dL� 4 fLJ F [p7 O N i p0000pppvOT$ plpmmbrll•1NOm l.-lr .•.+ fir a M1! PbmN ll.lN M1A1N b.rr b l.1 l� y � mPPPmmONmr M1b lln .+ �•A.. G �L� !! NNNNNNNNN ..lYlS Cy Y 7 >° m W � c .-�iaaaoppppppo 6 r. rl� �� m NPPONV•-1N•-lOmNnlNOr Ow W �OOO Fl l-1 F Nlbl•10 nIPmNbNbNl.1Nb d q.d �E OOpw.] N NN mI•lN lPbrPmNPPNN m C Op • Nyl l•1PrPrmmmmmrbNN `.iXON+O U N 4 o f•� G 'G • n m m r ! n P .-1 .y .-1 .-1 .y .... .� 6 C i jY .ry W OEYo '+i. a.Fe ms�R'� N.-lNnlNb rmPO.-lNnlN d M Ili Dl Ql A O Y � W ❑ n a W� P la 3 C Y .-. .-1 ...+.+ .]lU.-I U.+C 3+ ��. .7 ..7S Vf+s l�2 �. M .-INNNNNNNNNNNNNNN W w y .Gw u.W V m � A sN❑00.. .[ el \ .w .+.. .+.+.�.r .-1 .r .r .-1 4. Y 0 Y V x•.Yj y;W W j.jpppplp YFS G Y NNNNNYINNNNNNNNN d 6 A O Y q App YSS Y s�s �'OyS 6py y6p � 86y. � p CHOPOND2.XLS PROJECT: 74201 RECOMMENDED CONFIGURATION - ORIG. COND. NAME: QUADRANT -WESTERN SECURITIES SPREADSHEET USED TO SIZE THE POND BASED ON MAXIMUM DISCHARGE CRITERIA USES REVISED TARGET RELEASE RATES TO ACCOMMODATE ELIMINATION OF BOTH VAULTS THIS OPTION ELIMINATES DAM SAFETY PERMIT FOR POND: HOWEVER, D.S. REVISION REQUIRED FOR DAM Q50 max = 2.8 cis 1Q100 max = 2.8 cfs CREATED INPUT FILES FOR THIS CONFIGURATION ARE 50YFUTO.INP AND 100YFUTO.INP NEED TO RAISE POND 80rTOM SO MAX INS > MAX J11ALLFIELD WS A Initial 43560 sq. ft. = 1.00 acres L to W ratio 2 ft/ft L 295.16 ft W 147.58 ft S 3fH:ftV 3 Bottom elevation 245.6 ft Rows = 10 Columns = 5 R x C = 50 ok FTABLE Cumulative Total Spillway Orifice Weir Stage Depth Area Volume Discharge discharge I Discharge Discharge ff ft acres acre-ft cfs cfs cfs cfs 245.50 0.00 1.001 0.00 0.00 0.00 0.00 0.00 247.72 2.22 1.14 2.37 0.64 0.00 0.64 0.00 249.94 4.44 1.29 5.07 0.90 0.00 0.90 0.00 252.16 6.66 1.44 8.10 1.10 0.00 1.10 0.00 254.38 8.88 1.61 11.48 1.27 0.00 1.27 0.00 256.60 11.10 1.78 15.24 1.42 0.00 1.421 0.00 256.70 11.20 1.79 15.42 1.54 0.52 1.43 0.11 257.00 11.50 1.81 15.96 2.30 4.14 1.45 0.85 257.50 12.00 1.85 16.87 4.07 13.96 1.48 2.59 258.00 12.50 1.89 17.81 6.02 27.08 1.51 4.51 258.50 13.001 1,931 18.771 7.83 42.82 1.541 6.29 259.101 13.601 1.981 19.941 9.541 64.631 7.96 Discharge assumptions: Orifice: Dlameter = 4 in Dis coeff = 0.61 Invert = 245.5 ft Sharp -crested weir: Diameter = 21 In Las%ofC= 20% Length = 1.10 ft (calculated per page 2.2.7-2 of bng County Manual) Invert = 256.6 ft P= 11.1 ft Spillway to the Ballflelds Bottom width = 5 ft Flow length = 20 ft Dlscharge coefficient: 3.27 (Henderson, Open Channel Flow, p. 181) Bottom elevation = 256.6 ft 1 /31 /94 1:54 PM Page 1 ORIGPONDAS ExMing Pond at NW Comer of SW Campus Drlvo and 1st Ave. S Original (1987) Condbion Discharge StatMics N - 42 years Rank Return per ears Year Pond discharge cis Log discharge cfs 1 70.33 19901 28.03 1.45 2 26.38 19501 26.70 1.43 3 16.23 19871 26.20 1.42 4 11.72 1982! 23.12 1.36 5 9.17 1972 19.84 1,30 6 7.54 1986 18.42 1.27 7 6.39 1975 18.38 1.26 8 5.55 1968 18.14 1,26 4 4.91 19511 17.69 1.25 10 4.40 1980 17.11 123 11 3.981 1967 16.35 1.21 12 3.64 1957 16.23 1.21 13 3.35 1960 16.12 121 14 3.10 19781 15.88 1.20 15 2.89 19791 15.64 1.19 16 2.71 1956 15.03 1.18 17 2.54 1955 14.47 1.16 18 2.40 1981 14.30 1.16 19 2.271 19491 14.14 1.15 20 2.151 19581 13.97 1.15 211 2.05! 19741 13.92 1.14 221 1.951 1983 13.60 1.13 231 1.871 19711 13.55 1.13 24 1.79 19541 13.54 1.13 25 1.721 19a4l 13.42 1.13 26 1.651 19631 13.35 1.13 27 1.59 19641 13.24 1.12 281 1.53 19611 12.70 1.10 291 1.48 19661 12.64 1.10 30 1.43 19761 12.25 1.09 31 1.38 1969 12.17 1.09 32 1.34 1965 11.87 1.07 33 1.29 1970 11.82 1,07 34 1.26 1959 11.81 1.07 35 1.22 1952 1125 1.05 361 1.19 1989 11.23 1.05 371 1.15 1977 11,12 1.05 38 1.12 1962 11.11 1.05 39 1.09 1953 10.96 1.04 40 1.07 19731 10.91 1.04 41 1.04 19861 10.171 1.01 42 1.01 19881 8.611 0.93 L -Pearson Type III Statistics Dischame keg mean ] .161 log std. dev. 1 0.115 skew 0.785 P IReturn period y2grs 1-P K Discharge, cfs LP3 fat 0.991 1,01 0.01 -1.752 9.13 0.9 1.11 0.1 -1.167 10.65 0.8 1.25 0.2 -0.854 11.56 0.5 2.00 0.5 -0.129 14.00 0.2 5.00 0.81 0,779 17.79 0.1 10.00 0.9 1.333 20.59 0.05 20.00 0.95 1.834 23.50 0.04 25.00 0.96 1.988 24.47 0.02 50.00 0.98 2.447 27.63 0.01 100.00 0.99 2.887 31.03 K calculated with Wllson+lllferty Transformation Bobee polynomial equation approbmation coefficients for K. K - oO+a l •skew + a2'skewA2 + a3'skewA3 + cWskewM. P 1-P a0 al a2 I a3 a4 0.99 0.01 -2.3259 0.7149 0.0926 -0.0774 0,0096 0.9 0.1 -1.2784 0.0825 0.0826 -0.0142 0.0001 0.8 0.2 -0.8410 -0.0508 0.0336 0.0078 -0.0019 0.5 0.5 -0.0010 -0.1683 -0.0137 0.0095 -0.0006 0.2 0.8 0.8414 -0.0469 -0.0383 0.0009 0.0005 0.1 0.9 1.2814 0.1077 -0,0475 -0.0018 0.0006 0.05 0.95 1.6447 0.2849 -0.0494 -0.0042 0.0008 0.02 0.98 2.0535 0.5381 -0.0426 -0.0078 0.00101 0.01 0.99 2.3250 0.7387 -0.0323 -0.011l 0.00121 N t L J x 6 z O a (.9 C O rn O E X F\- Ca C - LL CV)C d c C Q 13 8 co 8 p 8 N 8 p $ to 8 O 8 L 8 O s;:0'a61cy0sia I• I• i m CD v a ORIGLTRM.XLS Existing Pond Diischar a at Orl final Condition Q 987) Print Interval = 2; Interval than e = 60 Total number of events = 33 Source file contains 2 hour data. Date 24 hour se ration of events fo pcOlal duration series statist! Pk disch Total rf Duration Pk intens. Date cfs in hrs I in/hr 1 /9/90 28.02 5.85 182 0.79 3/3 50 26.70 3.56 106 0.63 11 /5/86 26.20 1.27 40 0.95 25-Year 10/6/81 23.12 4.91 146 0.67 2/28f721 19.84 4.15 88 0.51 10-Year 1/18/861 18.42 4.12 120 0.49 12/26/741 18.38 2.56 54 0.46 8/23/681 18.14 2.06 98 0.52 12/8/711 17.71 3.54 280 0.49 2/9/511 17.69 6.23 140 0.47 12/14/791 11/24/861 17.11 16.62 8.56 6.29 240 176 0.47 0.47 1/19/671 16.35 3.01 116 0.43 12/9/561 16.23 3.28 124 0.52 11/20/591 16.12 6.08 158 0.47 3/5/721 16.10 3.10 56 0.36 8/15/501 15.99 1.46 56 0.54 9/17/781 15.88 0.71 38 0.50 11/13/661 15.81 3.84 180 0.59 9/8/791 15.64 0.84 54 0.54 3/17/50 15.09 3.63 200 0.47 12/20/551 15.03 4.17 124 0.40 9/22/781 14.60 2.79 102 0.60 2/7/551 14.47 2.91 92 0.46 2/16/721 14.47 1.89 152 0.56 11/21/801 14.30 1.60 48 '- 0.58 2/16/491 14.14 2.21 118 0.49 12/25/571 13.97 3.03 270 0.30 2-Year 11/28/731 13.92 1.26 156 0.38 1 /31 /87 13.75 4.89 272 0.40 10/28/82 13.60 1.53 42 0.61 12/6/70 13.551 4.081 204 0.42 12/ 19/53 13.541 1.611 1001 0.47 Page 1 L N J x O N O N E O U S O O O O O O O S ,O V C� O 06 O 'i N O SRO -MOIA LO N N r ,o N LO 10 N r z O z 0 W c I I z E 0 z 0 L c O m CD a V. + 3 � O Z LL a + c 6 o c 0y U 'O O � 0 `/ 0 C n C 70 C C O J C 75 O v_Vi J a c.a p 3 m3 �5 c z � a Oz I 8 O CV O - 10.00 14 __ I y "0;00 8 O O 8 06 16 N sp Moll LO N L N04 U) N U') -O LO N U) 10 LO �l N I• a) CD a O 6 O O tNO, Cml. O VO � 2P O^ Ooo C4U 4 ? cioC CO44 5 N Q OR m u7 ccn0FR CV NCV N� Ce7 V Q1Ci-CC �C �m �ci G �ti�oto U a TsC, NR �nnuninPo;2Ncniq�ien�Q.S i:22`d'5i 2 Ao-2:�SAo$ civX' o 444444444Q4^-g44RqIQ444Q4c00o� 2i Q O C�V_ t7 Cq CN7 P P t0 f7 O O N Q, n m G N n P pppp yy77 pp.. 0 0 m Q Q N Q 0 0 4 CO CO C`N ^ N C 0 N cn Q cl 4 vi o ei Q N d£ S H p Q O O S n n (p h t7 07 P P) V -0 c pp P N W t� ppp P N O P N N P S ^ t7 « o C O C 0 0 0 O O C O^ �- o 0 W 0^ O G O C C C^ O �l7 ^ ^ C7 fV .-. U CL H$ S$ P N N N O$ S n O P V P N P Cl! p ^ C7 H O N + o C 0 0 0^ ^ C C O Q Q OO N^ N o 0 0 0 O n^^ O O C Pi (V „ U m O O P 00 N f9 t'1 O N P CC?.6 H CCN Q O n V O N N C U 0 0 0 0 o N CO N N G 'C 'G N Q Q O 0 l7 N N CV CV C7 CV N� W a) In ^ (V U6 S$ H H pp mm C? fh M S S op tt�� O Q pp N N mm O ��pp Q m 0 �n 8 cq %cn ,�t77 [C�� m pp 0 0 n HY N N S N O C 0 0 0 C C O O C 0^ o O Q O O O C O C O O C b V O C o o^ U mm V Op op tN7. pp op c CC..�� do 0 o 0 0 0 o 0 0 0 C7 N o N .= O N o 0 0 0 0 0 N Q N^ o O C N F U G Z i�.3 �i1;.Im_Rj�a�$�i�oN,o P60o TO0,C-4 NNo u70 C7 mn n0 Nm NN NN^ �[l nn O V NP O U V J + $ H p S S ((Vy n O; ao0p �tpp ��y7 C� ee�ry pp Op CCv� C 00000 O O cc O C C'i N O CV ^ O CV C O 0000 N h C2 0 0 0 C7 S O S S O O O O O $ H C7 NO t7 O N O H O O O O N O G CIS cqi S H$ S O m n n O S H 0 0 pp P M rrpp `O pp P S n N S 04 m N Q O n F o 0 o o 0 0 0 o 0 0 0 0 N C o^^ o- 0 0 O c G O N 0 0 O CV *� C7 PJ C9 N C7 C7 P P CO CI V Q O P Q Q n n N P N C N F o o 0 0 ^ 0 0 O C7 C7 ^ N Q t7 N ^ 0-0-0 Pi O C4? n• Q t+i N Q U a C`mN7 t7mN �tmNi. ChmNi nmN0, nmN nm P.0J m ppC0'7 NPN Z m m mI P 0. mUO C m N NN NCCPm�.� NP N N 7Da H0NnN go0$^1n $0Nn �Nnn, �io �oi c,d �cN �N.NNz vnNNio^Q o$Nn� c8 08Nn 0$Nn 0$^�0 0$a0omNn 0mN.. a�nNi 0o a�NnNi .�^Pfd`L uYm NQN �N$ n O ( N NN NNmP^N NN^N N N NNNNnN NN N N t L U J x O Nl 0 Vi 0 N a E a U 3 NN d 10 C 3 _O LL 0 d O w O C O N .` FgL O U 8 8 8 8 8 8 N 0 L6 O � O sp `Moll N n N N n �O N N CV n N N N 0 N N n N Z O P 0 Z 0 W LL m CD d a t 0 L U Co J x b N O CV N n n M t a• N A Cf> J .------ C .� _- -- - -- --- -- -- _ - - - -- -- a.-ft O - N a E CN U 0 _ _ - - - - - - - - -= N ` 10 04 3 ;oo;lI L- Z -- n a m C s d m 3 a N H O c : p 4 =) L c J M o_ - �7y LV a a s O N `' } 33 z Oz 5c � ; lV C 04 a I I N op S O S i S S S pp S O S � N .p Ni N O 06 O V CV O S;o 'MOij N d a 888$88888eF4C',F4 �o ddro d�iF�nagnf� o 0 0 F3$888$S$$8888888H$8888$8�'�?5 3 a � Nddddddddpdd dd dddddddddddv+ricviNdam�nei^�m+:+ri 6 u GO SO $FJSPOGO��OOOO 'C, Ft�Tn�fD� FJ��N O C7.9 d g q 0 0 4 o d 4 0 g q q q R R q 4 4 4 4 4 4 4 4 R 4 4 4 R R 4 n G 2-0 0 0 0 0 p F5 O p p O G ryry S 9 p S 0 m pp 0 0 m WW O O m m O O mm m O O m m O O m pppp O O V S^ n N H P O O 444494444l44944qR444444q^tD���oaC6LoC pmo n SSSOOHHSH8HS8H$8$S888S$SoNN��Q OnvPi NPPao + O d O O C O d d C C C C C O C O C C 0 0 0 0 C7 C N O (V ^^ - 0 d 0 0 0 O C 0 D ^ U 8SSSH888HHS$HgBggS$8$$SS`�, (nVS�NOcSO$HO�vHO O + O O O O O O O O O O O O C C 0 0 G O 0 0 0 d 0 0 h n t7 G N^ (V d O d 0� 0^ lop U 88$$8$8HH$SHHSHHHSSFJn�nu]��3^w U O O o a d d 0 d O O d O o d d d (> o o e� cD �6 -dN^ 0:h Pl (`I O^ C. O 0 U 888F388g8888$88888888�F3 888mQd8 c OO O O m G d 0 Cddd m U ?Gj 8800doo00o0000888888Lo5_a,00 g F C d G O d 0 0 0 0 0 0 0 0 0 C G O 0 0 0 N N N d^ �- 0 0 0 0 N 0 0 0 O U x oo 8d 8d H8 pF � d d8d T UN 71111, G Z U p S OOOOOSH p p pp p p pp SOS S p SSS HHH p S$� � FJ�� Pa V 8n ,ciN Oom om 119 � J U + S$SO0000SSSH$OSH$pS8$$$OQV p pp OO pp p p OO p pO pp NN yu�� ��ji p V�^-'Ya1 tN9mOS$OQ�O O O d o 0 0 d O O d O o d d o o d d O d d d d d o N N O^,^ d d d 0 (YYN 0 0 0 U HHHS8888$8888888$8888888u`�mNo=22:8888ca 2 hob O C O O G O O O O C O O d O d O G O 0 0 d d O O C� 0 0 0 OO O O C O O CV d O C U c 88808H88H$8888H8HHSH8888mClN�V�OOH$OS�OS ��yy mm � G d O O d O O C C G C O O d O d O 0 0 d 0 0 0 d V� N 0^ OO OO OO OO OO OO OO OO g U O U d m FV p R O P^ P P P_ P P P m m m m m W m m m W p p pp r� h S V P m P t7 M n H SO 0 g m m Q) m m aj m cp m m m m m m m m m m cd to m m m m P R P _m W m m m m m m OP P m FV N N N N N N x O` 0 a "t 8888888888F388F388888g88888F3F3888F38888a�� t d d d d d d d d d o d d d d d d o o d d d d d d d d d d d d d d d d d^ ^ o x 6 Z � + p m U m `� m m pa m m m j �^ o,van on W ao112 v am�M�nmPO —V��4h0 NNNf7.- I-o" 0 0 0 0 0 0^ 6 0 0 0 0 0 0 0 0 0 0 0^ 0 0 0 0 0 0 0 21 1 ce) O X b CV O s 0 N a E O U 3 VN b. N V C N O U. 8 } N O C O N .` F E O V i i � C I i / / l - I / / O O O O O O 8 O N O L6 O L6 O CN sp `Mold 10 co U �O co 10 co LO 10 co e7 10 co 10 co O co O ,o co co O ,o co 10 N O 10 co N O 10 co N N O �O co O CV O Z O 0 Z 0 w C21- U- m CD a O N N O L L O O slo `MOIA ,o co \ ,o co \ 10 co cn ,o co ,o co \ O m O CD a 10 co \ co N_ O -O co 0 N \ O 10 00 Iq CV \ O -O \ N N \ O -O ao \ O CV \ O QFIGURE.XLS Study Tributaries Subbasin Q100 (cfs) Area (ac) A+C 15 84.5 D*+E* 2.6 14.0 F* 3.1 11.5 Total 1 20.71 110.0 Total Discharge Under SW Campus Drive Facility Q100 (cfs) Detention volume (ac-ft) Panther Lake 19 283 Ballfield 6.3 66 Quadrant pond (A+C) 2.7 16 Vault 1 * (E*+D*) 2.6 undetained Vault 2* (Part of F*) 2.4 undetained Rooftop* (Part of F*) 0.7 undetained Total 33.71 365 *Denotes undetained area. Note: Available capacity under SW Campus Drive is 92 cfs provided by 30" and 36" culverts. Undetained Flows from Areas E,F,&D i Inflows from Areas A and C New Quadrant pond Discharge under SW Campus Drive Page 1 % Lo- iELU I N QUAORANi \ 41 s i 21 DRAWNG NO. G1 G2 G3 C-4 G5 G6 G7 GO 09 G1 0 G11 THE I SHAL -"!0. a& 2. CONT JEEN MAPP FOR c SLRFo & 7HE C MAPtAi MATTE FIRST iiiVIERICAN TITLE (206) 728-7236 FARM PACKAGE Page 1 Prepared for: THE QUADRANT CORPORATION, RANDY HAMBLIN 04/21/94 ----------------------------------------------------------------------------------- Prcl: 132170-0030-09 Use: 101-SNGL FAM SgFt: 4,380 Date: 93/11/01 Name: STOCK WESLEY G QSTR: SE-19-21-04 LdSz: 20,793 Sale: CPROP Tel#: Zoning: RS72 Styl: 2.0 Bd: 4 Deed:Q Typ:REN Site: 470 SW 345TH PL FEDERAL WAY, WA 98023 Bths: F2 T H1 Loan: $319,200 Mail: 470 SW 345TH PL Assessd: 403,900 Tax: 6106.80 AFN:940128-1639 City: FEDERAL WAY WA 98023 %Imp: 83.0 Yr: 1991 Un: 1 Mkt: F2 WF/V: Plat: CAMPUS HIGHLANDS 1 Lot:3 Block: -------------------------------------------------------------------------------- Prcl: 132170-0040-07 Use: 101-SNGL FAM SgFt: 3,330 Date: 91/06/14 Name: LIU TEI SHAN+FENG-CHEN QSTR: SE-19-21-04 LdSz: 21,437 Sale: $311,000 Tel#: Zoning: RS72 Styl: 2.0 Bd: 4 Deed:W Typ:MTG Site: 460 SW 345TH PL FEDERAL WAY, WA 98023 Bths: F1 T1 H1 Loan: $190,000 Mail: 460 SW 345TH PL Assessd: 296,000 Tax: 4495.56 AFN:910618-1499 City: FEDERAL WAY WA 98023 oImp: 76.8 Yr: 1990 Un: 1 Mkt: F2 WF/V: Plat: CAMPUS HIGHLANDS 1 Lot:4 Block: ---------_---_---------------------------------------------------_-- Prcl: 132170-0050-04 - Use: 101-SNGL FAM SqFt: 3,470 Date: 92/10/30 Name: OH SANG PYO+JUNG SOON QSTR: SE-19-21-04 LdSz: 20,389 Sale: $275,000 Tel#: (206)927-0601 Zoning: RS72 Styl: 2.0 Bd: 3 Deed:W Typ:MTG Site: 450 SW 345TH PL FEDERAL WAY, WA 98023 Bths: F2 T1 H Loan: $220,000 Mail: 450 SW 345TH PL Assessd: 331,900 Tax: 5031.65 AFN:921030-3558 City: FEDERAL WAY WA 98023 oImp: 79.3 Yr: 1990 Un: 1 Mkt: F2 WF/V: Plat: CAMPUS HIGHLANDS 1 Lot:5 Block: Prc1:�132170-0060-02 -Use: 101-SNGL FAM SgFt: 3,640 Date: 91/02/14 Name: SCOTT TIMOTHY W+M DIAN QSTR: SE-19-21-04 LdSz: 20,002 Sale: $350,000 Tel#: (206)927-0205 Zoning: RS72 Styl: 2.0 Bd: 3 Deed:W Typ:MTG Site: 440 SW 350TH FEDERAL WAY, WA 98023 Bths: F2 T H1 Loan: $250,000 Mail: 440 SW 345TH PL Assessd: 354,900 Tax: 5375.10 AFN:910219-1085 City: FEDERAL WAY WA 98023 oImp: 80.6 Yr: 1990 Un: 1 Mkt: F2 WF/V: Plat: CAMPUS HIGHLANDS 1 Lot:6 Block: ---- Prcl: ----------------------------------------------------------------- 132170-0070-00 Use: 901-VAC-RES SgFt: Date: 89/10/09 Name: BARBIE LUMBER INC QSTR: SE-19-21-04 LdSz: 20,071 Sale: $65,000 Tel#: Zoning: RS72 Styl: Bd: Deed:W Typ: Site: FEDERAL WAY, WA 98023 Bths: F T H Loan: Mail: 1622 65TH AVE E Assessd: 68,600 Tax: 1025.64 AFN: City: FIFE WA 98009 %Imp: Yr: Un: Mkt: F2 WF/V: Plat: CAMPUS HIGHLANDS 1 Lot:7 Block: ------------------------------ Prcl: 132170-0080-08 -------------_-__-------------- Use: 101-SNGL FAM SqFt: 3,680 __- Date: 91/10/08 Name: RO PO CHUAN+CHIU YU QSTR: SE-19-21-04 LdSz: 19,408 Sale: $385,000 Tel#: (206)927-0782 Zoning: RS72 Styl: 2.0 Bd: 4 Deed:W Typ:MTG Site: 420 SW 345TH PL FEDERAL WAY, WA 98023 Bths: F2 T H2 Loan: $203,150 Mail: 420 SW 345TH PL SW Assessd: 370,400 Tax: 5606.56 AFN:930701-0095 City: FEDERAL WAY WA 98023 oImp: 81.4 Yr: 1990 Un: 1 Mkt: F2 WF/V: Plat: CAMPUS HIGHLANDS 1 Lot:8 Block: ------------------- Prcl: ---- 132202-0500-02 -------------------___ Use: 104-FOURPLEX SgFt: -------------_----_-- 3,600 Date: 90/08/30 Name: YUEN ROBERT K H+SHERLI QSTR: NE-19-21-04 LdSz: 12,823 Sale: $168,000 Tel#: Zoning: RM2400 Styl: Bd: Deed:W Typ:REN Site: 34031 1ST PL S FEDERAL WAY, WA 98003 Bths: F T H Loan: $134,400 Mail: 815 WAIKA PLACE Assessd: 170,000 Tax: 2645.71 AFN:900913-1081 City: HONOLULU HI 96825 oImp: 76.4 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: -------------------------------------------------------------------------------- CAMPUS VIEW 3 Lot:50 Block: Information provided is deemed reliable, but is not guaranteed Copyright 1994 TRW REDI Property Data FIRST tiMERICAN TITLE (206) 728-7236 FARM PACKAGE Page 2 Prepared for: THE QUADRANT CORPORATION, RANDY HAMBLIN 04/21/94 Prcl: 132202-0510-00 Use: 104-FOURPLEX SgFt: -3,904 Date: 86/09/30 Name: STRINGFELLOW RICHARD E QSTR: NE-19-21-04 LdSz: 9,925 Sale: Tel#: (206)226-7312 Zoning: RM2400 Styl: Bd: Deed:Q Typ: Site: 34033 1ST PL S FEDERAL WAY, WA 98003 Bths: F T H Loan: Mail: 15428 SE 167TH PL Assessd: 175,000 Tax: 2770.10 AFN: City: RENTON WA 98058 oImp: 77.1 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:51 Block: ----------- Prcl: ------------------------------------------------------- 132202-0520-08 Use: 104-FOURPLEX SqFt: 3,904 �-- Date: 90/08/22 Name: LEUNG IVAN C F+DAISY D QSTR: NE-19-21-04 LdSz: 10,359 Sale: $171,250 Tel#: Zoning: RM2400 Styl: Bd: Deed:W Typ:REN Site: 34035 1ST PL S FEDERAL WAY, WA 98003 Bths: F T H Loan: $137,000 Mail: 816 SW 34TH CT Assessd: 175,000 Tax: 2699.96 AFN:900831-1067 City: FEDERAL WAY WA 98023 %Imp: 77.1 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:52 Block: -------------------------------------------------------------------------------- Prcl: 132202-0530-06 Use: 104-FOURPLEX SgFt: 2,766 Date: 83/03/29 Name: SCHILZ PETER M QSTR: NE-19-21-04 LdSz: 11,583 Sale: Tel#: (206)242-9041 Zoning: RM2400 Styl: Bd: Deed:W Typ: Site: 28 S 341ST PL FEDERAL WAY, WA 98003 Bths: F T H Loan: Mail: 1605 SW MILLER CREEK R Assessd: 153,700 Tax: 2392.10 AFN: City: SEATTLE WA 98166 %Imp: 73.9 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:53 Block: --------------------------_----------------- Prcl: 132202-0540-04 _----- Use: 104-FOURPLEX SgFt: ------ 3,600 Date: 79/05/25 Name: B & G INVESTMENTS QSTR: NE-19-21-04 LdSz: 12,339 Sale: $163,850 Tel#: Zoning: RM2400 Styl: Bd: Deed:C Typ: Site: 26 S 341ST PL FEDERAL WAY, WA 98003 Bths: F T H Loan: Mail: 514 SW 331ST ST Assessd: 170,000 Tax: 2761.44 AFN: City: FEDERAL WAY WA 98023 %Imp: 76.4 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:54 Block: -------------- Prcl: --------------------------------------------------- 132202-0550-01 Use: 104-FOURPLEX SgFt: 3,904 ------ Date: 92/07/10 Name: SMITH FAMILY TRUST QSTR: NE-19-21-04 LdSz: 13,991 Sale: TRUST Tel#: Zoning: RM2400 Styl: Bd: Deed:D Typ: Site: 24 S 341ST PL FEDERAL WAY, WA 98003 Bths: F T H Loan: Mail: 318 DIABLO RD STE 260 Assessd: 175,000 Tax: 2727.17 AFN: City: DANVILLE CA 94526 oImp: 77.1 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:55 Block: ---------------- Prcl: -------------- 132202-0560-09 ---------------__---------------------- Use: 104-FOURPLEX SgFt: 3,904 Date: 93/12/15 Name: FENNESSEY DAVID B & MA QSTR: NE-19-21-04 LdSz: 13,395 Sale: $180,000 Tel#: Zoning: RM2400 Styl: Bd: Deed:W Typ:MTG Site: 22 S 341ST PL FEDERAL WAY, WA 98003 Bths: F T H Loan: $126,000 Mail: 2166 MAINE AV Assessd: 175,000 Tax: 2727.17 AFN:931229-1643 City: LONG BEACH CA 90806 %Imp: 77.1 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:56 Block: Prcl: - 132202-0570-07 - Use:104-FOURPLEX SgFt: --2,784 Date: 91/01/22 Name: TARNOVE ARTHUR & PAULA QSTR: NE-19-21-04 LdSz: 11,404 Sale: $137,000 Tel#: (206)432-0341 Zoning: RM2400 Styl: Bd: Deed:W Typ:REN Site: 20 S 341ST PL FEDERAL WAY, WA 98003 Bths: F T H Loan: $109,600 Mail: 25347 232ND AVE SE Assessd: 145,000 Tax: 2258.78 AFN:910129-1329 City: MAPLE VALLEY WA 98038 %Imp: 72.4 Yr: 1979 Un: 1 Mkt: F2 WF/V: Plat: -------------------------------------------------------------------------------- CAMPUS VIEW 3 Lot:57 Block: Information provided is deemed reliable, but is not guaranteed Copyright 1994 TRW REDI Property Data 11 FIRST AMERICAN TITLE (206) 728-7236 FARM PACKAGE Page 3 Prepared for: THE QUADRANT CORPORATION, RANDY HAMBLIN 04/21/94 ---------------------------------------------_------ Prcl: 132202-0580-05 Use: 104-FOURPLEX ---------- SgFt: 2,766 -------- Date: 90/07/12 Name: RAKHRA GURBACHAN S+GUR QSTR: NE-19-21-04 LdSz: 12,915 Sale: $153,000 Tel#• Zoning: RM2400 Styl: Bd: Deed:W Typ:REN Site: 23 S 342ND PL FEDERAL WAY, WA 98003 Bths: F T H Loan: $114,700 Mail: 7848 17TH AVE Assessd: 153,700 Tax: 2405.71 AFN:900724-0938 City: BURNABY BC 0 oImp: 73.9 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:58 Block: -----------------------------------------------__- Prcl: 132202-0590-03 Use: 104-FOURPLEX --------------------- SgFt: 3,600 Date: 90/10/15 Name: DOLOR JOSE DELFIN+MAGD QSTR: NE-19-21-04 LdSz: 15,167 Sale: $157,900 Tel#: Zoning: RM2400 Styl: Bd: Deed:W Typ:MTG Site: 21 S 341ST ST FEDERAL WAY, WA 98003 Bths: F T H Loan: $126,300 Mail: 21 S 341ST ST Assessd: 170,000 Tax: 2679.73 AFN:901023-0780 City: FEDERAL WAY WA 98003 oImp: 76.4 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:59 Block: Prcl: 132202-0600-01 - Use: 104-FOURPLEX SgFt: 3,904 Date: 93/12/01 Name: ROBERTS JAMES H & DEBR QSTR: NE-19-21-04 LdSz: 11,112 Sale: $88,500 Tel#: Zoning: RM2.4P Styl: Bd: Deed:W Typ:REN Site: 27 S 341ST PL FEDERAL WAY, WA 98003 Bths: F T H Loan: $132,750 Mail: 33405 LOTH CT SW Assessd: 175,000 Tax: 2789.90 AFN:931216-2831 City: FEDERAL WAY WA 98023 %Imp: 77.1 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:60 Block: --------- ------------------------------------ Prcl: 132202-0630-05 ------------------------ Use: 104-FOURPLEX SgFt: 3,056 Date: 83/03/30 Name: WILLIMAS RICHARD & NAC QSTR: NE-19-21-04 LdSz: 10,879 Sale: Tel#: (206)885-1367 Zoning: RM2.4P Styl: Bd: Deed:6 Typ: Site: 32 S 342ND PL FEDERAL WAY, WA 98003 Bths: F T H Loan: Mail: 5318 156TH DR NE . Assessd: 153,700 Tax: 2392.10 AFN: City: REDMOND WA 98052 oImp: 73.9 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:63 Block: ------------------------------------------------------------------------------ Prcl: 132202-0640-03 Use: 104-FOURPLEX SgFt: 2,766 Date: 93/05/10 Name: CALUGAY RUBEN & ANITA QSTR: NE-19-21-04 LdSz: 9,675 Sale: GIFT - Tel#• Zoning: RM2.4P Styl: Bd: Deed:Q Typ:FHA Site: 30 S 342ND PL FEDERAL WAY, WA 98003 Bths: F T H Loan: $115,200 Mail: 1317 S 239TH PL Assessd: 153,700 Tax: 2378.49 AFN:931217-1226 City: DES MOINES WA 98198 oImp: 73.9 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:64 Block: - --------------------------------- Prcl: 132202-0650-00 ------------------------------------------- Use: 104-FOURPLEX SqFt: 2,784 Date: 79/05/25 Name: RIVERA ROSTOM D QSTR: NE-19-21-04 LdSz: 10,085 Sale: $129,650 Tel#• Zoning: RM2400 Styl: Bd: Deed:C Typ: Site: 25 S 342ND PL FEDERAL WAY, WA 98003 Bths: F T H Loan: Mail: 28407 SE 464TH Assessd: 145,000 Tax: 2248.57 AFN: City: ENUMCLAW WA 98022 oImp: 72.4 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:65 Block: _--_--_-------------------------------------- Prcl: 132202-0660-08 Use: 104-FOURPLEX ---------------------------- SgFt: 1,800 Date: 79/05/25 Name: LO HARRY QSTR: NE-19-21-04 LdSz: 13,780 Sale: $163,850 Tel#: (206)746-8421 Zoning: RM2.4P Styl: Bd: Deed:C Typ: Site: 27 S 342ND PL FEDERAL WAY, WA 98003 Bths: F T H Loan: Mail: 910 145TH PL NE Assessd: 170,000 Tax: 2655.92 F2 AFN: WF/V: City: BELLEVUE WA 98007 oImp: 76.4 Yr: 1979 Un: 4 Mkt: Plat: -------------------------------------------------------------------------------- CAMPUS VIEW 3 Lot:66 Block: Information provided is deemed reliable, but is not guaranteed Copyright 1994 TRW REDI Property Data FIRST AMERICAN TITLE (206) 728-7236 FARM PACKAGE Page 4 Prepared for: THE QUADRANT CORPORATION, RANDY HAMBLIN 04/21/94 Prcl: - 132202-0670-06 - Use: 104-FOURPLEX SgFt: 3,904 Date: 93/12/14 Name: KOLLGAARD JEFFREY R & QSTR: NE-19-21-04 LdSz: 12,599 Sale: NMCHG Tel#• Zoning: RM2.4P Styl: Bd: Deed:Q Typ:MTG Site: 29 S 342ND PL FEDERAL WAY, WA 98003 Bths: F T H Loan: $120,000 Mail: 4013 S 262ND Assessd: 175,000 Tax: 2720.37 AFN:931216-1839 City: KENT WA 98032 %Imp: 77.1 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:67 Block: ------------------_----------------------------------------------------_- Prcl: 132202-0680-04 Use: 104-FOURPLEX SqFt: 3,600 Date: 90/03/09 Name: CHUGOKU MOKUZAI CO LTD QSTR: NE-19-21-04 LdSz: 11,989 Sale: $175,000 Tel#: Zoning: RM2.4P Styl: Bd: Deed:W Typ: Site: 31 S 342ND PL FEDERAL WAY, WA 98003 Bths: F T H Loan: Mail: 31-D S 342ND PL Assessd: 170,000 Tax: 2642.31 AFN: City: FEDERAL WAY WA 98003 %Imp: 76.4 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:68 Block: ------------ -------------------------------------- Prcl: 132202-0690-02 --------------------- Use: 104-FOURPLEX SgFt: 3,904 Date: 90/08/22 Name: CALMON LO QSTR: NE-19-21-04 LdSz: 13,114 Sale: $157,250 Tel#: Zoning: RM Styl: Bd: Deed:W Typ:REN Site: 33 S 342ND PL FEDERAL WAY, WA 98003 Bths: F T H Loan: $78,600 Mail: 1136 KAHULAI ST Assessd: 175,000 Tax: 2723.77 AFN:900831-1087 City: HONOLULU HI 96825 oImp: 77.1 Yr: 1979 Un: 4 Mkt: F2 WF/V: Plat: CAMPUS VIEW 3 Lot:69 ---_-------- Block: ------------------------------ Prcl: 192104-9003-08 ----------------------- Use: 952-REFUGES SgFt: ---- Date: 91/01/02 Name: CITY OF FEDERAL WAY QSTR: NE-19-21-04 LdSz: 78.00 Sale: GOVMT Tel#• Zoning: RS35.0 Styl: Bd: Deed:WY Typ: Site: 650 SW CAMPUS DR FEDERAL WAY, WA 98003 Bths: F T H Loan: Mail: 33530 1ST WAY SO Assessd: 1.5744 Tax: 75.46 AFN: City: FEDERAL WAY WA 98003 %Imp: Yr: 1990 Un: Mkt: F2 WF/V: Legal: 192104 3 POR OF NE 1/4 OF SD SEC LY ------------------------------- Prcl: 202104-9058-09 --------------------------------------------------- Use: 932-VAC-IND SgFt: Date: 91/04/11 Name: CITY OF FEDERAL WAY QSTR: NW-20-21-04 LdSz: 4.90 Sale: $4.315M Tel#• Zoning: OP Styl: Bd: Deed:WY Typ: Site: 3500 1ST WY S FEDERAL WAY, WA 98003 Bths: F T H Loan: Mail: 33530 1ST WAY S Assessd: 660,100 Tax: 1.25 AFN: City: FEDERAL WAY WA 98003 %Imp: Yr: Un: Mkt: F2 WF/V: Legal: 202104 58 POR OF SW 1/4 OF NW 1/4 LY SELY Prcl: 202104-9110-05 - Use:426-SCHLS-PB SgFt: 44,851 Date: Name: FEDERAL WAY PUBLIC SCH QSTR: SW-20-21-04 LdSz: 8.00 Sale: Tel#: Zoning: OP Styl: Bd: Deed: Typ: Site: 34424 1ST AV S FEDERAL WAY, WA 98003 Bths: F T H Loan: Mail: 31405 18TH AVE S Assessd: 2.4463 Tax: 1.25 AFN: City: FEDERAL WAY WA 98003 %Imp: 50.5 Yr: 1966 Un: Mkt: F2 WF/V: Legal: 202104 110 NW 1/4 OF NW 1/4 OF SW 1/4 LESS ---------------------------------- Prcl: 415920-0710-08 ---------------------------------------- Use: 924-VAC-COML SgFt: Date: 87/10/12 Name: QUADRANT CORP QSTR: SE-19-21-04 LdSz: 14.01 Sale: Tel#: Zoning: BC Styl: Bd: Deed:QY Typ: Site: Bths: F T H Loan: Mail: PO BOX 130 Assessd: 2.1359 Tax: 31896.15 AFN: City: BELLEVUE WA 98009 %Imp: Yr: Un: Mkt: F2 WF/V: Plat: -------------------------------------------------------------------------------- LAKEWOOD KING COUNTY ADD Lot:POR Block:l & Information provided is deemed reliable, but is not guaranteed Copyright 1994 TRW REDI Property Data DEPARTMENT OF COMMUNITY DEVELOPMENT Memorandum June 1, 1994 TO: Ron Garrow, Senior Development Engineer Chris Ingham, Assistant to the Fire Marshal K.C. Ellis, Lead Plans Examiner Rick Gilmore, Supervisor of Technical Services FR: Greg Few' ,' Senior Environmental Planner RE: Application No. SPR94-0010, UPR94-0003, SEP94-0017; First Avenue Basin Detention Facility Attached applications and plans for the proposed First Avenue basin detention facility. The site is located in the vicinity of the northwest corner of 1st Avenue South and South 348th Street, adjacent to the little league baseball fields. Please review the application and provide written comments at our CDRC meeting scheduled for June 16. If you have any questions, please give me a call at 661-4108. King County Core and Special Requirements Core Reciuirements Core Requirement #1: Dischar a at the Natural Location. The detention facility will discharge to the existing ditch which is on the commercial property at the northwest corner of 1st Avenue S and SW Campus Drive. This ditch carries flow from Panther Lake Flood Control Facility, SW Campus Drive, 1st Avenue South, and various residential and commercial properties in the 1st Avenue South Drainage Basin. Core Requirement #2: Off --Site Analysis. This detention facility was designed such that future flows from the 1st Avenue Detention Basin would not be greater than those experienced under the current land use conditions. This goal is achieved up to the 100-year runoff event. The Level 1 downstream analysis revealed the downstream hydraulic restriction (that conveyance element with the least amount of capacity) to be the pair of culverts under SW Campus Drive immediately east of the intersection with 1st Avenue S. These culverts currently convey all flows from the 1st Avenue Drainage Basin, and they will continue to do so after completion of this project. Current estimated flows from the drainage basin (34 cfs in the 100-year runoff event) are estimated to be much less than the capacity of these pipes (92 cfs). As the detention facility was designed such that future flows are less than or equal to the existing discharge during the design events, this capacity will not be exceeded in the future condition. Core Re uirement #3: Runoff Control. This project was designed to limit the future condition discharge from the 1st Avenue Basin to less than the existing in runoff events up to and including the 100-year event. Please see the attached design memorandum. Core Re uirement 44: Conveyance System, The majority of the conveyance system to this detention facility is currently in place. Pipes from the storm sewers in 1st Avenue S and SW Campus Drive will be added as shown in the construction plans. The capacity of these new pipes are no less than those pipes immediately upstream, and no additional inflow occurs between the connection to the existing system and the detention facility. The pipe discharge structure for the pond is designed to pass the flows indicated in the attached design memorandum. A spillway has been designed to pass flows to the Panther Lake Ballfield Reservoir in runoff events larger than the 50-year. The design event for the spillway is the 100-year, but the spillway was also evaluated for the dam safety design storm. Core Requirement #S: Erosion/Sedimentation Control Plan. Erosion and Sedimentation Control will be covered by Specifications Section 02260 (Erosion Control --Waterway and Wetland Protection) and Sheet G10 of the construction plans (plans attached). Core Requirement #6: Maintenance and Operation. Operations and maintenance will be c:kluadrant\permit.wpw Page f April 11, 1994 covered by the construction specifications which will be included with the application for a construction permit from the City. Core Re uirement #7: Bonds and Liability. This project will conform to City requirements regarding bonds and liability at the construction permitting phase. Special Requirements Social Re uirement #1: Critical Drainage Areas. This special requirement does not apply to this project. Special Re uirement #2: Compliance with Master Plan. The site is within the West Campus Master Drainage Plan and conforms to that document. Special Requirement #3 Conditions Requiring a Master Plan. This special requirement does not apply to this project. Special Rgauirement #4: Adopted Basin or Community Plan. The site is not within a community plan area. It is within the Hylebos Creek Basin Plan, and this project, with the Panther Lake Flood Control Facility, is consistent with the goals of the plan. Special R uirement #5: S vial Water Qualily Controls. This special requirement does not apply to this project. Special Requirement #b: Coalescing Plate Oil/Water Separators. This project creates no additional impervious areas which would require treatment by an oil/water separator. Special Requirement #7: Close Depression. This special requirement does not apply to this project. Special Requirement #8: Use of Lakes. Wetlands, or Closed Depressions for Runoff Control. This special requirement does not apply to this project. Special Requirement #9: Delineation of 100-Year Floodplain. This site does not adjoin or contain a natural stream, lake, or closed depression. Special Requirement #10: Flood Protection for TYM 1 and 2 Streams. This site does not adjoin nor contain a Type 1 or 2 stream. S cial Re uirement #11: Geotechnical Analysis and ReDort Hong -West & Associates prepared a geotechnical report on the construction area. The purpose of the report was to fulfill requirements of the WDOE Dam Safety Permit. All identified issues regarding c.\quadr-t\permit.wpw PagexZ- April 11, 1994 groundwater migration through the dam, settling of the dam, seismic considerations, and risk of failure were addressed by the report and the construction drawings and specifications.. Special Requirement #12: Soils Analysis and Repoli Hong -West & Associates prepared a geotechnical report on the construction area. This report also investigated the native soils. All identified issues regarding constructability were addressed by the report and the construction drawings and specifications. c:\quadra-nI\permit.wpW Page,":�7 April 11, 1994 GEOTECHNICAL INVESTIGATION FIRST AVENUE BASIN DETENTION FACILITY FEDERAL WAY, WASHINGTON HWA Project No. 94003 February 3, 1994 Revised April 12, 1994 Prepared for BROWN AND CALDWELL CONSULTANTS UT, flONGWEST &ASSOCIATE S, INC. COW -L HWA Project No. 94003 February 3, 1994 Revised April 12, 1994 Brown and Caldwell Consultants 100 West Harrison Street Seattle, Washington 98119-4186 Attention: Mr. Bill Persich Subject- Geotechnical Investigation First Avenue Basin Detention Facility Federal Way, Washington Dear Mr. Persich: ulira' I +IONGVEST & ASSOCIATES, INC. Geotechnical Engineering Hydrogeology Geoenvironmental Services Testing & Inspection In accordance with your request, Hong West & Associates, Inc. has completed a geotechnical investigation for the proposed First Avenue Basin Detention Facility located in Federal Way, Washington. Results of the investigation are presented in the accompanying report. We appreciate the opportunity to provide geotechnical services on this project and look forward to providing further services during design review and construction. Should you have any questions regarding this report, or if we may be of further service, please do not hesitate to call. Sincerely, HONG WEST & ASSOCIATES, IN t"LA44ll . H 44 _4 Scott L. Hardman, P.E. Senior Geotechnical Engineer DLS:SLH (94003.doc) 28285 � ,NAL EXPIRES `v 19730 - 64th Ave. W. Lynnwood, WA 98036-5904 Tel. 206-774-0106 Fax. 206-775-7506 1A TABLE OF CONTENTS Pale 1.0 INTRODUCTION.........................................................................1 1.1 EXECUTIVE SUMMARY .......................... • ....1 1.2 SCOPE OF SERVICES AND AUTHORIZATION......................... .1 2.0 PROJECT SITE CONDITIONS........................................................2 f 3.0 EXPLORATION PROGRAM........................................................... 2 1 J 3.1 FIELD INVESTIGATION....................................................... 3 3.2 LABORATORY TESTING ...................................................... 3 4.0 SITE STRATIGRAPHY ................... 4.1 GENERAL GEOLOGY OF THE PROJECT AREA .................. 4.1.1 Fill (Qf, , Qfd)........................................................... 4 4.1.2 Lacustrine Sediments..................................................4 4.1.3 Recessional Outwash (Qvr) 4.1.4 Glacial Drift (Qd)......................................................4 4.2 SUBSURFACE CONDITIONS.................................................4 4.2.1 Proposed Dam Location..............................................5 4.2.2 Potential Borrow Area ................................................ 5 5.0 CONCLUSIONS AND RECOMMENDATIONS .................................... 6 5.1 -PROPOSED DAM...............................................................6 5.1.1 Foundation Preparation ................................................ 6 5.1.2 Recommended Configuration ......................................... 6 5.1.3 Drainage Control.......................................................6 5.2 DETENTION POND............................................................ 7 5.2.1 Design Considerations................................................7 5.3 SLOPE STABILITY ANALYSES ............................................. 7 5.4 MATERIAL AND COMPACTION REQUIREMENTS ................... 8 5.4.1 Gradation Requirements .............................................. 8 5.4.2 Compaction Standards................................................9 5.5 SITE DRAINAGE................................................................9 6.0 LIMITATIONS............................................................................10 7.0 BIBLIOGRAPHY ..... •..................................................................10 LIST OF FIGURES Figure 1. Site and Geologic Map Figure 2. Geologic Section A -A'; Proposed Dam Figure 3. Generalized Cross Section - Proposed Dam LIST OF APPENDICES Appendix A. Logs of Exploratory Borings Appendix B. Laboratory Test Results Appendix C. Previous Test Pit and Boring Logs Appendix D. Previous Laboratory Test Results 1.0 INTRODUCTION Hong West & Associates, Inc. (HWA) has completed a geotechnical investigation for the First Avenue Basin Detention Facility in Federal Way, Washington. The proposed dam will tie into the recently completed Panther Lake Ball Field Dam, and will serve as a detention structure for controlling storm water. The purpose of this geotechnical investigation is to provide design -level analysis for the proposed detention facility, located east of the Ball Field Dam. Based on subsurface data obtained for the Ball Field Dam, and borings completed for this study of the proposed detention facility dam location, it is our opinion that the proposed improvements can be constructed as planned, provided the geotechnical recommendations of this report are incorporated in design and construction. 1.1 EXECUTIVE SUMMARY Geotechnical investigations and analyses were conducted by HWA, in support of the design efforts for the proposed facility. The major conclusions and recommendations resulting from the geotechnical investigation are summarized below: The proposed dam configuration is considered stable, under static, steady seepage and rapid drawdown conditions. 2. Toe drains are recommended for the portions of the dam 4 feet or higher, along the segment which is not common to the Ball Field Dam. 3. Approximately 8 to 13 feet of loose fill soils were encountered along the alignment of the proposed dam. The loose fill beneath the proposed dam should be removed and recompacted prior to embankment fill placement. 4. A gabion spillway may be used along a portion of the existing Ball Field Dam to accommodate excess water from the detention pond. Details of the subsurface investigation and laboratory testing performed, results, conclusions, recommendations, and limitations of this report are discussed in subsequent sections. The executive summary presented above should be considered only in the context of the entire report. 1.2 SCOPE OF SERVICES AND AUTHORIZATION The scope of services for the present study was outlined in an agreement for professional services between Brown and Caldwell Consultants (B&C) and HWA, dated November 1, 1993. The proposed scope of services was as follows: HWA Project No. 94003 February 3, 1994 Revised April 12, 1994 Reviewing the previously gathered soils data pertinent to the project area. 1 Drill two borings to average depths of 40 feet at the proposed dam location to determine the groundwater conditions, soil characteristics, and foundation characteristics. 3. Perform laboratory testing of selected soil samples to determine the engineering properties of the soil at the proposed dam location. 4. Provide design recommendations as to suitability of the existing soil to serve as foundation material for the dam; results of slope stability and seepage analyses; and determination of appropriate cross sections for the dam, including allowable side slopes, slope protection, toe drain design, fill material and compacted fill placement requirements. 5. Satisfactorily respond to WDOE Dam Safety comments. 2.0 PROJECT SITE CONDITIONS The project site is located northeast of S.W. Campus Drive, in the city of Federal Way, Washington, as shown on the Site and Geologic Map, Figure 1. An earthen dam has recently been constructed by the City of Federal Way along the south and east sides of Panther Lake. A second dam to the south encompasses several ball fields. A former King County gravel pit exists south of the lake. The areas immediately north and east of the lake are undeveloped; residential developments exist beyond. Panther Lake Dam borders the lake on the south and east. Height of the berm varies from approximately 2 to 10 feet. Two outlets extend beneath the berm, one continues underground beneath the ball fields and the other attaches into the recently constructed infiltration galleries. A gabion spillway has been constructed on the Panther Lake Dam, to accommodate high flow conditions. Downstream from the main dam is the Ball Field Dam, serving to control storm water in the event the main dam is over -topped. 3.0 EXPLORATION PROGRAM The field exploration program and laboratory testing of soils for physical properties performed during this study are described below. 94003.DOC 2 HONG WEST & ASSOCIATES, INC. HWA Project No. 94003 February 3, 1994 Revised A�ril 12 1994 3.1 FIELD INVESTIGATION On January-11, 1994, HWA personnel monitored subsurface investigation and soil sampling at the project site. Two exploratory borings (designated SB-12 and SB-13) were conducted at the approximate locations indicated on Figure 1. The borings were logged in the field by 14WA geologists. Representative samples were obtained, placed in air tight containers and returned to the HWA laboratory for further testing. Field exploration methods are described and logs of the borings re contained in Appendix A. Additional test pits and borings were conducted during a previous phase of study (HWA report dated June 30, 1993). The approximate locations of the previous explorations are also shown on Figure 1. The logs of these exploratory test pits are included in Appendix C. 3.2 LABORATORY TESTING Selected soil samples were tested for physical properties, including moisture content and grain size distribution. Results of the moisture content testing are shown on the appropriate boring logs. The grain size distribution curves are included in Appendix B. Additional laboratory testing conducted during the previous geotechnical investigation are included in Appendix D of this report. 4.0 SITE STRATIGRAPHY 4.1 GENERAL GEOLOGY OF THE PROJECT AREA The project area, as mapped by Waldron (1961), is underlain by proglacial stratified drift consisting of undifferentiated recessional outwash sediments. This unit is underlain by ground moraine deposits consisting mainly of dense to very dense glacial drift. A more detailed surficial geology of the site, as mapped by HWA personnel during the previous investigation, is indicated on Figure 1. Three major surficial soil units were noted during the January 11, 1994 and May 6 and 8, 1993 field investigations. These consist of fill, recessional outwash, and glacial drift. One subsurface unit, lacustrine sediments, was encountered at depth in two of the borings, SB- 10 and SB-11. A more detailed description of general geologic units encountered at the site is presented below. 94003.DOC 3 HONG WEST & ASSOCIATES, INC. HWA Project No. 94003 February 3, 1994 Revised April 12 1994 4.1.1 Fill (Qf, Qfd) Fill or disturbed soils are present along S.W. Campus Drive and adjacent to the Ball Field Dam. Based on our observations, the fill material appears to be derived from the former King County gravel pit. The fill consists of loose, silty sand and poorly graded sand with varying amounts of gravel and deleterious matter. The maximum depth of fill encountered was 8 to 13 feet in borings SB-10, SB-11, SB-12, and SB-13. The exploratory test pits revealed no fill material greater than about 1 foot thick overlying the glacial deposits. 4.1.2 Lacustrine Sediments Stratified silts and fine sands were found in borings SB-10 and SB-11 on the south side of the lake, underlying the recent soils. These stiff or medium dense, fine textured soils are thinly bedded to laminated. Borings SB-10 and SB-11, conducted during the May 6, 1993 field investigation, encountered lacustrine deposits at depths around 20 feet, which extended to the full depths of the borings. 4.1.3 Recessional Outwash (Qvr) Recessional sediments released and transported by the waning glacier were deposited throughout the study site. The material is predominantly a stratified sand and fine to cobble size gravel of glaciofluvial (glacial stream) origin. These soils are exposed in the northern and western portions of the site, and appear to have been mined from the area now occupied by the baseball fields and parking area. Recessional outwash was encountered in all exploratory borings and in TP-22 and TP-23, at varying depths directly below the fill/topsoil. 4.1.4 Glacial Drift (Qd) Glacial "drift", as the term is used here, is a near till -like material found at depth in all five exploratory test pits (May 6, 1993). The drift consists of a dense to very dense mix of sand, gravel, and silt. It may show some faint bedding, but is typically massive. The high density is due to the materials having been over -ridden by glacial ice. The drift observed during this investigation did not exhibit the low permeability qualities usually associated with Vashon Till. 4.2 SUBSURFACE CONDITIONS Subsurface conditions at the site are discussed below, in two sections: Section 4.2.1 discusses the proposed dam location, and Section 4.2.2, the potential borrow source area east of the ball fields. 94003.DOC 4 HONG WEST & ASSOCIATES, INC. HWA Project No. 94003 February 3, 1994 Revised April 12, 1994 4.2.1 Proposed. Dam Location Subsurface conditions at the proposed dam are interpreted based on exploratory borings SB-10, SB-11, SB-12, and SB-13. A generalized soil profile along the proposed dam alignment is shown on Geologic Section A -A', Figure 2. The upper 5 to 13 feet of material encountered in the borings are interpreted as undocumented fill soils, consisting of very loose to loose, silty sand and poorly graded gravel. Below the fill soils was a layer of medium dense sand and gravel. This unit is interpreted as recessional outwash, and extends to depths of approximately 20 to 25 feet in SB-10 and SB-11, and to approximately 41.5 feet in SB-12 and SB-13. Lake deposit (lacustrine) sediments were encountered below the recessional outwash in borings SB-10, SB-11, and SB-13. The lacustrine deposit predominantly consists of silty sand and sandy silt. It extends to the maximum depth of exploration at approximately 42 feet. Ground water was encountered in all four borings; the approximate depths to ground water in each of the borings at the time of drilling are summarized below: Boring Depth to groundwater at Time of Drilling (ft.) SB-10 20 SB-11 20.5 SB-12 40 SB-13 ` 30 Groundwater levels should be anticipated to fluctuate in response to rainfall rates, seasonal and other factors. 4.2.2 Potential Borrow Area Two test pits (TP-22 and TP-23) were excavated in the area directly east of the existing ball fields. Based on the test pit explorations, it appears that the area is blanketed with a 3- to 4-inch layer of organic material, over loose brown, silty sand with gravel (fill/topsoil mix) to a depth of approximately 2 feet. Below this layer, soils graded to brown and gray, gravelly sand and sand with silt. This unit is interpreted as recessional outwash, and it extends to a depth of 3 %2 to 5 feet in the test pits. The lowermost unit encountered in the test pits is interpreted as glacial drift. It consists of very dense, gray, silty sand and sand with silt. 94003.DOC 5 HONG WEST & ASSOCIATES, INC. HWA Project No. 94003 February 3, 1994 Revised April 12. 1994 5.0 CONCLUSIONS AND RECOMMENDATIONS Based on the results of the geotechnical investigation described herein, the following conclusions and geotechnical recommendations are presented for the proposed improvements. 5.1 PROPOSED DAM The First Avenue Basin Detention Facility Dam is planned southeast of the ball field area, and will tie into the existing Ball Field Dam. The proposed dam, in conjunction with the Ball Field Dam, will serve as a detention pond for containing excess storm water originating from the development. The location of the proposed dam is shown on Figure 1. 5.1.1 Foundation Preparation We encountered loose surficial soils in the borings along the proposed dam alignment. Consequently, we recommend improvement of the foundation soil prior to constructing the dam, to minimize the potential of post -construction settlement and of internal erosion (or "piping") of soils beneath the dam. We anticipated that the -loose surficial soils are on the order of 5 to 13 feet thick. These loose soils should be removed to expose the underlying undisturbed recessional outwash, to a lateral extent as indicated on Figure 3. The results of our laboratory analysis indicates that the material beneath the proposed dam alignment is relatively clean (less than 5 % passing the No. 200 sieve). Consequently, the excavated materials do not meet gradation requirements outlined in Section 5.4.1, and should not be used as embankment fill. The removed soils may be suitable for other uses related to the development. _ 5.1.2 Recommended Configuration The recommended configuration of the lower dam is shown on Figure 3. We recommend a 10-foot wide crest and 3:1 (horizontal: vertical) side slopes on both the upstream and downstream sides. The side slopes may be graded to a flatter inclination for ease of maintenance, or for other considerations. 5.1.3 Drainage Control A toe drain is recommended for portions of the dam greater than 4 feet in height, as summarized on the table below. Approx. Toe Drain Embankment Toe Dimensions Pea Gravel/Pipe Height (ft.) Drain ? (width x depth, ft.) Drain S stem ? 4-9 yes 10x2 yes < 4 no -- -- 94003.DOC 6 HONG WEST & ASSOCIATES, INC. HWA Project No. 94003 February 3, 1994 Revised April 12, 1994 A toe drain will not be required for the portion of the proposed dam which is common to the Panther Lake Ball Field Dam. 5.2 DETENTION POND With the construction of the proposed dam, a detention pond will be formed. The pond will be confined by the Ball Field Dam to the west, the proposed dam to the south, and by the hill rising away from site to the north and east sides. Portions of the material excavated within the detention pond area and from the adjacent northeast slope may be used as embankment fill in the proposed dam. Grain size results from TP-23 confirm that the glacial drift material tested meets the embankment fill specification described in Section 5.4.1. 5.2.1 Design Considerations Cut 51apts_- Based on the soil conditions encountered in the detention pond area, we recommend side slopes not to exceed 2:1 (horizontal: vertical). However, slopes at an inclination of 3:1 would be less susceptible to the effects of erosion and construction traffic. Embankment Material - The glacial drift soil in the detention pond area appears generally acceptable as embankment fill for the proposed dam, based on the grain -size distribution specified in Section 5.4.1. However, due to lateral and vertical variation of on -site materials, we recommend that the excavated material be tested for grain -size distribution prior to and during its use as embankment fill. All excavated material to be used as fill must be free of deleterious matter. Gabions - A gabion spillway is planned to channel excess storm water out of the detention pond and into Ball Field Dam. We suggest using a series of gabions for the proposed spillway, in a similar fashion as was used on the Ball Field and Panther Lake Dams. The gabions, which will lie along the crest and downstream side of the dam, must be founded on dense, compacted fill material. A filter layer should be placed between the gabions and the embankment fill. Due to the large difference in grain size distribution, it is our opinion that use of a graded soil filter is not feasible. We recommend that a filter fabric be used. Based on the grain size distribution of the potential borrow materials determined in the laboratory, we recommend that Polyfelt TS-420, or approved equivalent, be used for this purpose. 5.3 SLOPE STABILITY ANALYSES Slope stability analyses, performed during the previous geotechnical investigation for the Ball Field Dam (HWA report dated June 30, 1993), demonstrates adequate Factors of Safety for the three case outlined below: 94003.DOC 7 HONG WEST & ASSOCIATES, INC. HWA Project No. 94003 February 3, 1994 Revised A ril 12 1994 Case I. Upstream slope stability at full reservoir level Case II. Upstream slope:stability during rapid drawdown Case III. Downstream slope stability at steady state seepage and full reservoir Slope stability analyses was performed using analytical methods proposed by Janbu (1954). Shear strength parameters for the compacted fill materials of the Ball Field Dam were based on laboratory direct shear testing. The soil parameters and general geometry of the Ball Field Dam match closely those of the proposed dam. It is in our opinion, therefore, that the slope stability Factors of Safety of the proposed dam will be similar to or more conservative than the Ball Field Dam. 5.4 MATERIAL AND COMPACTION REQUIREMENTS This section discusses the recommended specifications for embankment fill, drain materials, and the required level of compaction. 5.4.1 Gradation Requirements Embankment Fill Soils - The following gradation requirements are recommended for embankment fill soils: Sieve Size % Passin 3" square 100 1" square 70-100 No. 4 40-80 No. 10 30-70 No. 20 25-60 No. 40 20-50 No. 100 10-30 No. 200 3-20 In general, glacial drift materials observed in test pits excavated along the hillside east of the ball fields meet these gradation requirements, as determined from the sieve analyses performed on selected samples (see Appendix D for test results). Such materials may be used in construction of the proposed dam embankment. As noted previously, gradation of materials used as embankment fill should be verified prior to placement. Drain Materials - Toe drain materials should conform to the following gradation requirement: 94003.130C 8 HONG WEST & ASSOCIATES, INC. HWA Project No. 94003 February 3, 1994 Revised April 12, 1994 Sieve Size % Passin 1" square 100 3/8" square 70-95 No. 4 55-85 No. 40 40-70 No. -20 30-55 No. 40 20-40 No. 100 10-20 N0. 200 0-3 The gradation requirements for the drain materials were determined based on the gradation characteristics of the potential borrow material, as determined by mechanical sieve analysis conducted on the selected samples, and our engineering analysis. 5.4.2 Compaction Standards All embankment fill should be placed in loose, horizontal lifts less than 8 inches in thickness, and compacted to 95 % of maximum dry density, based on Standard Proctor (ASTM D 698). The procedure to achieve proper density of a compacted fill depends on the size and type of compaction equipment, the number of passes, thickness of the layer to be compacted, and certain soil properties. Generally, loosely compacted soils are a result of poor workmanship or of soils being compacted at an improper moisture content. Soils with a high percentage of silt and clay may easily become too wet, or coarse -grained soils may easily become too dry for maximum compaction. Silty or clayey soils with a water content higher than optimum should be dried as necessary. Sprinkling is sometimes required to wet a coarse -grained soil to its optimum water content before compacting. 5.5 SITE DRAINAGE Adequate drainage provisions are imperative and we recommend both short and long term drainage measures be incorporated in project design and construction. Of major concern would be the discharge or ponding of surface water during construction since the native soils are considered moisture sensitive. To minimize the potential for surface water and/or groundwater damage to the subgrade, it is recommended that construction operations be performed in the drier summer months when possible. Surface runoff can be controlled during construction by careful grading practices. Typically, these include the construction of shallow, upgrade perimeter ditches or low earthen berms and the use of temporary sumps to collect runoff and prevent water from damaging exposed subgrades. All collected water should be directed under control to a 94003MOC 9 HONG WEST & ASSOCIATES, INC. HWA Project No. 94003 February 3, 1994 Revised April 12, 1994 positive and permanent discharge system. Permanent control of surface water should be incorporated in the final grading design. 6.0 LIMITATIONS This geotechnical evaluation was planned and conducted in accordance with generally accepted engineering standards practiced presently within this geographic area. Experience has shown that geotechnical investigation's performed by these standards reveal with reasonable regularity soils that are representative of subsurface conditions throughout a site. The analyses and recommendations contained in this report are based on the assumption that soil conditions encountered in subsurface explorations are representative of actual conditions throughout the subject site. However, experience has also proven that subsoils can vary quite radically over small distances. Inconsistent conditions can occur between explorations and not be detected by a geotechnical study. If, during future studies or construction activities on site, subsurface conditions are encountered which are different from those described herein, HWA should be notified for review of the variances and revisions of the conclusions and recommendations presented, where necessary. This report is prepared for the exclusive.use of the owner and the owner's consultants, for specific application on this project in accordance with generally accepted engineering practices. No warranty, expressed or implied, is made. 7.0 BIBLIOGRAPHY Hong West & Associates, Inc., 1992, Preliminary Geotechnical Investigation, Panther Lake Surface Water Study, Federal Way, Washington, July 28, prepared for Brown and Caldwell Consultants. _ Hong West & Associates, Inc., 1993, Geotechnical Investigation, Panther Lake Flood Control Project, Federal Way, Washington, June 30, prepared for Brown and Caldweli Consultants. Janbu, N., 1954, Stability Analysis of Slopes with Dimensionless Parameters, Harvard Soil Mechanics, Series.No. 46. Skemton, A. W., 1986, Standard Penetration Test Procedures And The Effects in Sands of Overburden Pressure, Relative Density, Particle Size, Ageing and Overconsolidation, Geotechnique 36, No. 3, pp. 425-447. Waldron, H. H., 1961, Geology of the Poverty Bay Quadrangle, Washington, U. S. Geological Survey Geologic Quadrangle Map GQ-158. 94003.DOC 10 HONG WEST & ASSOCIATES, INC. VICINITY MAP SW 320th ST. sw ST 5 'T S. NOT TO SCALE MQ: PROJECT ;SITE 3mth S-r 5 e n Qvr el .7-7 . ... ........ .. 41, f, Q d SB. TP-19 TP-18 TP-20 T1 LEGEND 0fd nLL/DISTt)RBED MATERIAL CtW RECESSIONAL OUTWASH Od GLACIAL DRIFT +SB-11 APPROXIMATE EXPLORATORY BORING LOCATION Tp-16 APPROXIMATE EXPLORATORY BACKHOE TEST PIT LOCATION (1993) 1 APPROXIMATE GEOLOGIC CONTACT A A' Li GEOLOGIC SECTION LOCATION REFERENCE BASEMAP PROVIDED BY BROWN AND CALDWELL CONSULTANTS 0 50 100 200 SCALE: 1"=100' zti A SITE FIRST AVENUE BASIN GEOLOGICAND MAP floNG%%%ST DETENTION FACILITY &ASSOCIATES01mc. PROJECT NO.: 94003 FIGURE: 280 270 AA' 280 EXISTING GRADE 270 EL 258.7' TOP OF PROPOSED DAM a EL 258.7' 260 260 SB-12 SB-13 SB-10 250 250 8 FILL FILL 1 5 FILL ? ? 7 ?�?— w 17 ?�? z Z 18 GRAVEL GRAVEL W/SAND 240 z zo 24p W/SAND 38 (RECESSIONAL OUTWASH) aSAND W/GRAVEL > w w 15 / (RECESSIONAL UWASH) \? J w R � 6 i 28 230 _�4 1 _ 19 SAND 230 �? 33 SAND SAND 27 23 may— — 220 SILTY 19 ? ? r 61 _ —? = 220 SAND \ ?� GRAVEL WITH (LACUSTRINE) 18 SILT AND SAND 20 SILTY ? �? SAND 15 - 24 SILTY GRAVEL 210 210 , WITH SAND SILTY SAND 200 J L 200 NOTE THIS GENERALIZED SOIL PROFILE WAS COMPILED FROM AVAILABLE $LGSURFACE INFORMATION IN THE VICINITY. IT IS INTERPRETIVE_ ACTUAL SOIL CONDITIONS BET*eE:N BORINGS MAY VARY FROM THOSE SHOWN. 1991 TOPOGRAPHY BY OTHERS —?—? — INFERRED GEOLOGIC UNIT CONTACT_ s1 STANDARD PENETRATION TEST N-VALUE (BLOWS/FOOT) SB-10 EXPLORATORY BOREHOLE 1 INCH I =AFIRST AVENUE BASIN GEOLOGIC SECTION A -A' SCALE: 1"=100' HORIZONTAL floNrJWES• DETENTION FACILITY PROPOSED DAM 1 "=10' VERTICAL ak ASSOCIATES, INC. PROJECT NO.: 94003 FIGURE: 2 94403-B-002.1 1333 NI NOLLYA313 N N N Q N Q 'cj:< ce I-- o W=W J Q2-5 W ` I Z I Q FLc' z — 0. U o C-) 4! 4J I ItLO d } J (r W cc M I J } r Q W >2 W a- WuJ � W z W u w = 2FS �c YNUW iM 9 JZW� O w� myaj�F 9y N I W�0 �O r Zd� gia� Imo pp o W W == us a <p I zZ i oN m ��ZGZ �WK mm IL� ? C» m�� smm o.l I �� 9�"�¢ BWM ��W<� JF "I IC9D bl0s C< � �Zr 6 U ' N r Z ,� -� po W < �X W I IN FpWrc Mw [❑�a ...�� x�<?W% N L N a CN 1333 NI NOLLVA313 Z O LLJ (V c I Q V 0 U LJJ O Cl Q. LJ O J � aCJ- LLJ w V I Q J m U w Q :5 LL- Z LLI > O Q F- Z V� Olf 0L.i W WI O O APPENDIX A LOGS OF EXPLORATORY BORINGS HONG WEST & ASSOCIATES, INC. APPENDIX A LOGS OF EXPLORATORY BORINGS On January 11, 1994, HWA personnel conducted a program of subsurface investigation and sampling at the project site. Two exploratory borings were drilled at the approximate locations indicated on Figure 1. The borings were drilled using a hollow stem auger and a 140-pound hammer with trip release mechanism for performing Standard Penetration Tests (SPT). Soil samples extracted from the borings were examined, classified, and logged in the field by HWA personnel. Samples were taken with a 2-inch (outside diameter) split spoon sampler, driven 18 inches into relatively undisturbed soils beyond the auger bit by dropping a 140-pound hammer 30 inches per stroke. The number of blows for each 6 inches of penetration was recorded, as shown on the boring logs. The number of blows required to drive the last 12 inches was totaled as the SPT N-value. The N-values are plotted on the boring logs and are used as an index to estimate certain engineering properties of the soils. Additional borings and test pits were conducted during a previous phase of the Panther Lake project (HWA report dated June 30, 1993). Approximate locations of the previous explorations are also shown on Figure 1. The logs of the previous exploratory borings and test pits are included in Appendix C. LEGEND OF TERMS USED ON EXPLORATION SOIL LOGS Soil classifications presented on the exploration soil logs are based on visual field and laboratory observations, using ASTM D 2488. Soil descriptions are presented in the following general order: Density/consistency, color, modifier, MAJOR CONSTITUENT, minor constituent(s), moisture content, soil structure(s), additional remarks. DENSITY/CONSISTENCY Density/consistency of soils encountered in exploratory borings is usually based on the Standard Penetration Test (SPT) N-value or "blowcount", ASTM D 1586. Using this method, the sampler is driven 18 inches with a 140-pound hammer falling 30 inches. The SPT N-value is the number of blows for the last 12 inches of sampler drive. Unconfined Granular Soil SPT Cohesive Soil SPT Compressive Density N-value Consistency N-value Strength (tsf) Very loose 0-4 Very soft 0-2 < 0.25 Loose 4 - 10 Soft 2-4 0.25 - 0.5 Medium dense 10 - 30 Medium stiff 4-8 0.5 - 1.0 Dense 30 - 50 Stiff 8 - 15 1.0 - 2.0 Very dense > 50 Very stiff 15 - 30 2.0 - 4.0 Hard > 30 > 4.0 MOISTURE CONTENT Dry Little perceptible moisture Damp Some perceptible moisture, probably below optimum Moist Probably near optimum moisture content Wet Much perceptible moisture, probably above optimum MINOR CONSTITUENTS Trace Some Modifier (sandy, silty, etc.) Very (plus modifier) Estimated Percentage 0-5 5-12 12-30 30-50 TERMS DESCRIBING SOIL STRUCTURES Bedded Composed of layers thicker than 1 cm, of varying color and/or texture. Calcareous Containing a significant amount of calcium carbonate. Cemented Rock or soil hardened by the precipitation of a mineral cement among the grains of the sediment. Fissured Containing shrinkage cracks, frequently filled with fine sand or silt, usually more or less vertical. Indurated A rock or soil hardened or consolidated by pressure, cementation, or heat. Interbedded Composed of alternating beds of different soil types. Laminated Composed of thin (< 1 cm) layers of varying color and/or texture. Poorly graded Predominantly a single grain size, or having some intermediate sizes missing ("gap" graded). Slickensided Having previously -sheared planes of weakness that are slick and glossy in Well graded appearance. Having a wide range of grain sizes, with substantial amounts of intermediate particle sizes. U00 +IONGWEST &AS SOCIATE S.ING LEGEND OF SYMBOLS USED ON EXPLORATION SOIL LOGS GRAPHIC SYMBOLS FOR SOIL TYPES NON -COHESIVE SOILS (<50% passing No. 200 sieve) well graded gravel and gravel/sand mix poorly graded gravel, gravel/sand mix silty gravel, gravel/sand/silt mix clayey gravel, gravel/sand/clay mix well graded sand, gravelly sand poorly graded sand, little or no fines silty sand, sand/silt mix clayey sand, sand/clay mix COHESIVE SOILS (>50% passing No. 200 sieve) inorganic silt and very fine sand inorganic, low plasticity clay organic, low plasticity clay, silt/clay mix inorganic, elastic silt, silt/sand mix inorganic, high plasticity clay organic, medium to high plasticity clay peat and other highly organic soil SAMPLE TYPE SYMBOLS BOREHOLE SAMPLES ® 2.0" OD Split Spoon (SPT) IShelby Tube 3.0" OD Split Spoon with Brass Rings Grab Sample (cuttings) mCore Run TEST PIT SAMPLES ® Bag (bulk sample) OGrab (small volume) IShelby Tube HAND BORING SAMPLES Non-standard penetration (40 lb. hammer with 12 inch drop) OGrab Sample (post hole) IShelby Tube ROTARY BOREHOLE SAMPLES mContinuous Core Sample Note: The graphic symbols used for the various soil types are based on symbols recommended in the Unified Soil Classification System. Graphic logs are based on subjective field identi- fication of soils, and laboratory data where available. GROUNDWATER MONITORING WELL SYMBOLS ntonite Seal out Backfill ttings Backfill or Caved Hole !zometer Casing oundwater Level (noted during drilling) oundwater Level (measured in piezometer after water level stabilized) :)tted Piezometer Casing ind Backfill ATTERBERG LIMITS PL LL o - Natural Moisture Content PL - Plastic Limit LL - Liquid Limit v Llir +IONGWEST & ASSOCIATES, INC. W 2 F- a W 0 4 HONG WEST & ASSOCIATES, INC. DRILLING COMPANY: Gregory Drilling DRILLING METHOD: CME-75, 8" Hollow Stem Auger SAMPLING METHOD: SPT rn ui U Z W 3 Q t O zz vi W W� O V J J J X H d 3 J Q (A O m CU x 2!O J ( n a z x ai (n DESCRIPTION BORING LOG TOTAL DEPTH: 41.5 Feet SURFACE ELEVATION: 258 Feet MEASURING POINT EL.: Feet Medium dense, dark grayish brown, silty SAND with gravel, moist. Fine to medium grained sand, 2" minus subrounded gravel. Trace to some 8" minus 3/3/3 8 12.1 subrounded cobbles. (Fill) 2/4/4 8 14.9 ----------------------------------- Medium stiff, dark grayish brown SILT with sand and gravel, moist. Fine to medium grained sand. V 3/5/2 7 16.5 minus subangular to subrounded gravel. GP } Dense, olive brown, poorly graded GRAVEL with i.�• sand, moist. Fine to medium sand, 1" minus !►;. subrounded gravel. 11/17/21 38 4.1 ?`u. (Recessional Outwash) .••a-. ------------------------------------ Medium dense, light brownish gray, poorly graded SAND, moist. Fine grained sand. Trace to some 1" 4/8/8 IB 3.8 minus subrounded gravel. E4/9/10 19 4.1 Becomes more fine grained with trace to some 7/12/15 27 10.8 =: silt. I[AVery dense, grayish brown, poorly graded GRAVEL 21/34/27 61 4.7 with silt and sand, moist. Fine to medium grained �- sand, 1.5" minus subrounded gravel. Possible trace to some cobbles. • Moist. Cont. M 1 Pen. Resistance (blows/foot) 0 20 40 60 80 6 NOTE: This loft of subsurface conditions applies only at the specified location and on the date Indicated. PROJECT: First Ave. Basin BORING: SB-12 LOCATION: Panther Lake, Federal Way, WA DATE COMPLETED: January 11, 1994 LOGGED BY: C. Behrens PROJECT NUMBER:94003 PAGE: 1 OF 2 HONG WEST & ASSOCIATES, INC. BORING LOG --(n _ wo (s Z H W -- (n O7 a 0 a ; a W a z M z c U � I J 0 CO in U in a (1S �' J L in ❑ESCRIPTION • Moist. Cont. (%) Pen. Resistance (blows/foot) 0 20 40 60 S 0 111II/43 54 9.8 Very dense, ra ish brown, silt GRAVEL with g y y j sand, wet. Fine grained sand, 1.5" minus subrounded gravel. Possible trace to some cobbles. Borehole terminated at a depth of 41.5 feet, 15 1/11/94. i0 i5 i0 35 _ r0 -. F5 PROJECT: First Ave. Basin LOCATION: Panther Lake, Federal Way, WA DATE COMPLETED: January 11, 1994 LOGGED BY: C. Behrens BORING: SB-12 PROJECT NUMBER: 94003 PAGE: 2 OF 2 HONG WEST & ASSOCIATES, INC. DRILLING COMPANY: Gregory Drilling DRILLING METHOD: CME-75, 8" Hollow Stem Auger SAMPLING METHOD: SPT in - U Z Q t o H U z (n �- N C O N W W CD W U J J J F- O U S Q o M a z i Cn (n DESCRIPTION BORING LOG TOTAL DEPTH: 41.5 Feet SURFACE ELEVATION: 253 Feet MEASURING POINT EL.: Feet Soft/loose, very dark grayish brown, sandy SILT/silty SAND with gravel, moist. Fine grained sand, I" minus subrounded gravel. Grass, roots, 2/5/3 8 25.2 and glass fragments. (Fill) 2/3/2 5 12.8 3/7/10 17 3.1 SP Medium dense, light olive brown, poorly graded SAND with gravel, moist. Fine to medium grained sand, P' minus subrounded gravel: (Recessional Outwash) Becomes olive gray. 4/9/13 22 1.8 N4/5/23 28 2.9 Becomes light olive brown, slightly less gravelly. 9/12/14 28 4.0 5/9/14 23 22.1 4/8/12 18 24.7 Medium dense, dark grayish brown, silty SAND, wet. Very fine to fine grained sand • Moist. Cont. M 1 Pen. Resistance (blows/foot) 0 20 40 80 80 L NOTE: This log of subsurface conditions applies only at the specified location and on the date Indicated. PROJECT: First Ave. Basin BORING: SB-13 LOCATION: Panther Lake, Federal Way, WA DATE COMPLETED: January 11, 1994 LOGGED BY: C. Behrens PROJECT NUMBER: 94003 PAGE: 1 OF 2 HONG WEST & ASSOCIATES, INC. BORING LOG z U Q t O w u C a z bi N w "N O U J = W J W LC O J CL 3 O Q M m o Cn a z s in DESCRIPTION 40 4/4/11 15 22.8 • ' Medium dense, dark grayish brown, silty SAND, wet. Very fine tofine grained sand Borehole terminated at a depth of 41.5 feet, 1/11/94. PROJECT: First Ave. Basin LOCATION: Panther Lake, Federal Way, WA DATE COMPLETED: January 11. 1994 LOGGED BY: C. Behrens • Moist. Cont. M ► Pen. Resistance (blows/foot) 0 20 40 60 80 BORING: SB-13 PROJECT NUMBER: 94003 PAGE: 2 OF 2 APPENDIX B LABORATORY TEST RESULTS HONG WEST & ASSOCIATES, INC. APPENDIX B LABORATORY TEST RESULTS Representative samples obtained from the borings were returned to HWA's laboratory, and selected soil samples were tested to determine physical properties. This test program included in -situ moisture content and grain size analysis. Moisture Content Natural moisture contents were measured using test method ASTM D 2216-80. The results are shown on the appropriate boring logs in Appendix A. Grain Size Analysis _l The grain size distribution of representative soil samples was determined in general accordance 1 with ASTM D 422. Results of these analyses are plotted and included in this appendix. Grain size distribution curves and soil classification in terms of the Unified Soil Classification System (USCS) are shown on the attached figures. I I I- I j HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake — Quadrant Dam ----- --------------------------- Federal Way, Washington ------------------ Project Number: 94003 Date Tested: 1 —19-94 - - --- Remarks: Olive brown, poorly graded --GRAVEL with sand (GP) Or IJ J J Q V) I— Z W U a_ w EL 100 90 80 70 60 50 40 30 20 10 0 Test Hole Number: SB-12 Sample Number: S-4 ------ Depth: 15:0-16.5 feet _ Sample Description: Gravel: 54.1 -------------------- Sand: 42.6 Fines-- --- -- -� 3.3 Sand I Gravel Fine I Medium r- Fine � Crse SIEVE SIZES inn inn 6n en 3n 70 16 10 4 3/8 3/4 1 3/2 2 3 I I I I I I I I I 1 -- - - -- ------ -------- ---- -- I I -- J--L---J- I I I L-I-- --- -- I I --1-'I- I I I 1 I I I I 1 I I I I I I I I I I I I l I I I I I r I I I I -- �--� -- - �- � -� - ---- �-�-I-, I I ice^ 1 I I I I I I 1 I I I 1 I I I I I I r I - ----------- - - - --- ---i--h----1 t -- - - -^ --1-I--t-t-I-- I I I I I I I I I - - - - - - - - - - - - -• - - - - - - - - - - -- 1 I I I I I I I I I I J 1 I I I I I I I I I I I i I 1 I I I I I I I I I I I I 1 __ - - -- ---- -- - - - -- ---- I I I I --1--r----+-r- I I 1 I I 1 I I I I I - -- I I I I ---1--t-t-I-- I I I I I I I I I I I _ _ - _ - _ - - - - - - - - _ _ -- - - - - - _ I I - - - _ _ L _ _ I I I I I I I _ J _ 1 - I I I 1 - - - - I I ^ _ I I I I I I I 1 I I I I I -- �--1 -- I I I 1 V I I 1 - - -- l i I ! I I I I I I I I I __---_ -- ---------- - - - - -- I I - -- -----y-+-r- r I I - - -- I I _ - rt-t-I-- I I I I I 1 I I I I I I 5 2 5 0.001 2 5 2 5 2 5 Z o 0.01 0.1 1 10 GRAIN SIZE — MILLIMETERS J J HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake — Quadrant Dam Federal Way, Washington ----------- Project Number: 94003 Date Tested: 1 —19-94 Remarks: Olive brown,__poorlY graded SAND -••--------- - - ______with,_gravel �SP�_ 100 -- 90— 80 — w 70 - J - J - 60 - V - Z 50 - w - 40 - UJ a- 30 - 20 - 10- 0- Test Hole Number: SB-13 _. . Sample Number: S-3 Depth: 1-0.0-11.5 feet Sample Description: Gravel: 40.8 Sand: 56.9 Fines:------2.3 Clay Silt Sand Gravel Fine I Medium Crse Fine Crse SIEVE SIZES -)nn inn 6n en An 7n 16 10 4 3/8 3/4 1 3/2 2 3 ------ ------------------ I I I I --J--L---J-1-L- I I I 1 I I I I I I I I I I I I I I I I I - - -^ I ! r ! --1��- I I I I I I r- I I I I I I -1-1-�-- I I I I I I I I I -� - - - - - - - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - ` - - - - - - - - - - - - ^ - - - I I I I I - - 1 - - t - - - I I I _ I I I I I I - 1 - t -I- - ---- - - - - - -- " - I I I I I - - -I-- 7- 7 I I I I I I I I I I I 1 I I I I I I - - -- - - - - - I I - - J - - L - - I I I - J - 1 - L- I I I - - - - - - - - - - - - - - - I I I I I I I I I I I • - - - - -- ----------- - - - - -- - - I --, --- I I - I I I I I I -I -I - I -- I I I _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I I _ _ - _ _ t _ .-. I I I I 1 - t r - I I -- - - - I I - - - -I- - I I I I I - t - - -I- - I I I - - - -- - - - - - - - -- - - - - - - - - - - - - I I - - J - - L - - I I I I - ^ L - L - - - - - I I - -- I I I I 1 I I 1 I I I I 1 I I 1 I I I I I I I ---�--- ------- -- -- - - - --- I I --y-- ^--ti-t--I-- ! I I -- -- I I - - I I I 1 I I I I I I I I I I 1 I I I I I i I 2 5 2 5 2 5 z 0.01 0.1 1 10 GRAIN SIZE - MILLIMETERS J APPENDIX C PREVIOUS TEST PIT AND BORING LOOS HONG WEST & ASSOCIATES, INC. APPENDIX C PREVIOUS TEST PIT AND BORING LOGS On May 6 and 9, 1993, HWA personnel monitored the excavation of eight test pits and six borings within the Panther Lake project site area. Two of the six borings and five of the eight test pits lie in the vicinity of the Quadrant Western Securities project site, as shown on Figure 1. Test pits and borings were logged in the field by HWA geologists. Representative samples were obtained, placed in air tight containers and returned to the HWA laboratory for further testing. Logs are included in this appendix. Laboratory test results are presented in Appendix D. HONG WEST & ASSOCIATES, INC. WELL LOG DRILLING COMPANY: Gregory Drilling TOTAL DEPTH: 41.5 Feet DRILLING METHOD: Hollow Stem Auger 4.0" I.D. SURFACE ELEVATION: Feet SAMPLING METHOD: SPT 2.0" O.D.: Dames & Moore 3.0" O.D. MEASURING POINT EL.: 251.8 Feet U Z N 3 M D Q t O F - u1 C '-' (u ZO ((n .... W W-- j J J = J G: 0 J �-: O U CL 3 Q 0] O o cn a z s ccnn uu) DESCRIPTION onument Cover Brown, poorly graded SAND with silt and gravel, moist. Possible cobbles. (Fill) 1 I 31 -- Very loose, dark brown, silty SAND with gravel, moist. Some black organic material, and wood fragments. (Fill) Drilling more difficult at 8.5% r• GP 5-8-10 18 3 �'': Medium dense, gray, poorly graded GRAVEL with sand, damp. Trace silt, fine gravel, possible cobbles. (RecessionalOutwash) Thin, 1-2" layer, organic material in sample interval e 5-10-15 at 15'. 5-7-8 15 3 ----------------------------------- Medium dense, brown, poorly graded SAND with 5-10-II 21 14 gravel, moist. Trace silt, medium to coarse sand, fine gravel. 9-15-18 33 21 Medium dense to dense, light brown, silty SAND, moist. Interbedded sand and silt. (Lacustrine) ar 7-8-12 5-8-13 19 22 5-7-13 20 22 ----------------------------------- (Description next page) NOTE: This log of subsurface conditions applies only at the specified location and on the date Indicated. �ntonite ser Grout ica Sand fitted PVC PROJECT: Panther Lake WELL: SB-10 LOCATION: Panther Lake, Federal Way, WA. PROJECT NUMBER: 91147; Task 2 DATE COMPLETED: 5/8/93 LOGGED BY: R.E. Long PAGE: 1 OF 2 ED cn W m Q -N - 3 -Z O a� b-fo-14 HONG WEST @ ASSOCIATES, INC. WELL LOG U N � v � � O ~ Z fA O Ln J r O U J z s ai (n DESCRIPTION Very Stiff, light brown, sandy SILT, wet. Few fine 24 23 gravels, interbedded silt and silty sand, silt appears laminated, sand beds are poorly graded fine sand. END OF BORING AT 41.5 FEET PROJECT: Panther Lake LOCATION: Panther Lake, Federal Way, WA. DATE COMPLETED: 5/8/93 LOGGED BY: R.E. Long xr:,s lxFc,. WELL: SB-l0 PROJECT NUMBER: 91147: Task 2 PAGE: 2 OF 2 HONG WEST & ASSOCIATES, INC. WELL LOG DRILLING COMPANY: Gregory Drilling TOTAL DEPTH: 43 Feet DRILLING METHOD: Hollow Stem Auger 4.0" I.D. SURFACE ELEVATION: Feet SAMPLING METHOD: SPT 2.0" O.D.: Dames 6 Moore 3.0" O.D. MEASURING POINT EL.: 253.3 Feet LU in U ch Z w ; M cu N c U fn (n c> W U Q _ -i cc y J O U CL 3 a Cn Co O o cn a $ z uri u�i DESCRIPTION onument Cover 9 3-2-2 4 18 E 5-7-12 8-8-9 17 i 8-12-18 8-10-13 23 2 8-10-12 22 18 0 5-7-10 17 25 5-15-20 35 24 0 5-7-17 24 22 Loose, dark brown, silty SAND with gravel, moist. Some black organic material, and wood fragments. (Fill) Drilling more difficult at 8'. Medium dense, gray, poorly graded SAND with gravel, damp. Trace silt, fine gravel, possible cobbles to 8"-. No return from 3.0" split spoon sampler at 15'. (Recessional Outwash?) Dense to medium dense, brown, silty SAND, wet. Interbedded fine sand and laminated silt. (Lacustrine) NOTE: This fog of subsurface conditions applies only at the specified location and on the date Indicated. :ntonite ser Grout lica Sand Ated PVC PROJECT: Panther Lake WELL: SB-11 LOCATION: Panther Lake, Federal Way, WA. PROJECT NUMBER: 91147: Task 2 DATE COMPLETED: 5/9/93 LOGGED BY: R.E. Long PAGE: 1 OF 2 1 I HONG WEST & ASSOCIATES, INC. WELL LOG Lu L) w 2t U u) Z y 3 < t O f!1 c H Z V U fN J = W J W�LLJ ix y J J O L) a Q m x J o cn a z u}i ch DESCRIPTION 40 II-13-17 As above.' 11-15-16 31 23 ENO OF BORING AT 43 FEET 65 J PROJECT: Panther Lake LOCATION: Panther Lake, Federal Way, WA. DATE COMPLETED: 5/9/93 LOGGED BY: R.E. Long WELL: SB-II PROJECT NUMBER: 91147; Task 2 PAGE: 2 OF 2 HONG WEST & ASSOCIATES, INC. TEST PIT LOG EXCAVATION COMPANY: J. Briere Construction, Inc. TOTAL DEPTH: 9.7 Feet EXCAVATION METHOD: John Deere 4100 4WD Backhoe SURFACE ELEVATION: *280 Feet SAMPLING METHOD: Grab un U U7 o N = J O U a :E J o uai Cn to DESCRIPTION D GM Dense, brown gray, silty GRAVEL with sand: some openwork gravel lenses: approx. 5% cobbles to 12" minus; scattered lenses 0 of very silty gravel; clasts subangular to subrounded; moist. (Glacial Drift) 2 O 7.4 ,X --......................................... ....... ---... --- Stiff, gray, laminated, clayey SILT & sandy SILT with gravel ; moist. Bottom of Pit @ 9.7 feet. No water encountered. * Moist. Cont. M PL Plastic Limit LL Liquid Limit 0 20 40 60 80 i NOTE: This log of subsurface conditions applies only at the specified location and on the date Indicated. PROJECT: Panther Lake TEST PIT: TP-18 LOCATION: Federal Way, Washington DATE COMPLETED: 5/8/93 LOGGED BY: Rod Faubion PROJECT NUMBER: 91147-2 PAGE: 1 OF 1 I I I j I j HONG WEST & ASSOCIATES, INC. EXCAVATION COMPANY: J. Briere Construction, Inc. EXCAVATION METHOD: John Deere 410D 4WD Backhoe SAMPLING METHOD: Grab rn U jt (n o N v a 4=- a F: m U a i in J o Cn x Cn (n DESCRIPTION �i' TEST PIT LOG TOTAL DEPTH: 8.5 Feet SURFACE ELEVATION: 1250 Feet c ti 4d Loose, brown, gravelly SAND: some silt; numerous fine roots; moist. (Fill) Buried TOPSOIL with wood & decayed organics; numerous fine to coarse roots; moist. Medium dense to dense, mottled to gray below 3 ft., o,GM poorly graded GRAVEL with silt and sand; clasts to 8" minus, mostly 3" minus, subangular to subrounded; roots to 3.6 ft, none below; moist. (Glacial Drift) Bottom of Pit @ 8.5 feet. No water encountered. • Moist. Cont. M PL Plastic Limit LL Liquid Limit 0 20 40 60 80 i NOTE: This log of subsurface conditions applies only at the specified location and on the date Indicated. PROJECT: Panther Lake TEST PIT: TP-19 LOCATION: Federal Way, Washington DATE COMPLETED: 5/6/93 LOGGED BY: Rod Faubion PROJECT NUMBER: 91147-2 PAGE: I OF 1 J HONG WEST @ ASSOCIATES , INC. EXCAVATION COMPANY: J. Briere Construction, Inc. EXCAVATION METHOD: John Deere 410D 4WD Backhoe SAMPLING METHOD: Grab U K N ui z u] U J J J �-: -O L) fn :M J cn x cn uu) DESCRIPTION 4.4 TEST PIT LOG TOTAL DEPTH: 7.0 Feet SURFACE ELEVATION: *250 Feet 2" of TOPSOIL over loose, light brown, sandy GRAVEL: w/some silt: numerous roots; moist. very aense, gray, poorly graoea bKAvtI_ wnn sut ana sans: Tew fine roots in upper 2 ft.: scattered 4-6" thick lenses of sandy gravel & fine to medium sand exposed thoughout pit walls: moist. (Glacial Drift) Bottom of Pit @ 7.0 feet. No Water Encountered. • Moist. Cont. M PL Plastic Limit LL Liquid Limit 0 20 40 60 80 NOTE: This log of subsurface conditions applies only at the specified location and on the date Indicated. PROJECT: Panther Lake TEST PIT: TP-20 LOCATION: Federal Way, Washington DATE COMPLETED: 5/6/93 LOGGED BY: Rod Faubion PROJECT NUMBER: 91147-2 PAGE: 1 OF 1 HONG WEST & ASSOCIATES. INC. EXCAVATION COMPANY: J. Briere Construction, Inc. EXCAVATION METHOD: John Deere 410D 4WD Backhoe SAMPLING METHOD: Grab in C) k U) z N z N cn L) Q J O U N M J (n x cn ai °DESCRIPTION TEST PIT LOG TOTAL DEPTH: 8.2 Feet SURFACE ELEVATION: 1273 Feet 4" of Forest Duff over loose, brown, silty SAND: w/some gravel to 4" minus; numerous roots; moist. (Topsoil) Loose, brown gray to olive gray, gravelly SAND with silt: numerous roots; moist. (Recessional Outwash) Medium dense, light brown, poorly graded SAND with silt: grades with depth to poorly graded SAND with silt and gravel: rounded to well rounded gravel to 8" minus. (Glacial Drift) Bottom of Pit @ 6.2 feet. No water encountered. • Moist. Cont. W PL Plastic Limit LL Liquid Limit 0 20 40 60 80 NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated. PROJECT: Panther Lake TEST PIT: TP-22 LOCATION: Federal Way, Washington DATE COMPLETED: 5/6/93 LOGGED BY: Rod Faubion PROJECT NUMBER: 91147-2 PAGE: 1 OF 1 a� 2 H G.. w O 0 HONG WEST & ASSOCIATES, INC. EXCAVATION COMPANY: J. Briere Construction, Inc. EXCAVATION METHOD: John Deere 410D 4WD Backhoe SAMPLING METHOD: Grab U M U) n z vi z N N U J J J F -O U � fA : M J cr) i cn = tch DESCRIPTION 4.3 7.6 TEST PIT LOG TOTAL DEPTH: 6.1 Feet SURFACE ELEVATION: *275 Feet X. 3" of Forest Duff over loose, brown, silty SAND: w/some gravel to 4" minus; numerous roots; moist. (Topsoil) Medium dense, light brown, fine to medium SAND: some silt; trace rounded to well rounded gravel to 8". (Recessional Outwash) SM Very dense, gray, -silty SAND with gravel: approx. 5% cobbles to 12" minus; scattered lenses of very silty gravel; clasts subangular to subrounded; moist. (Glacial Drift) Bottom of Pit @ 8.1 feet. No water encountered. • Moist. Cont. M PL Plastic Limit LL Liquid Limit 0 20 40 80 80 wi i NOTE: This log of subsurface conditions applies onty at the specified location and on the date Indicated. PROJECT: Panther Lake TEST PIT: TP-23 LOCATION: Federal Way, Washington DATE COMPLETED: 5/6/93 LOGGED BY: Rod Faubion PROJECT NUMBER: 91147-2 PAGE: 1 OF 1 APPENDIX D PREVIOUS LABORATORY TEST RESULTS HONG WEST & ASSOCIATES, INC. APPENDIX D PREVIOUS LABORATORY TEST RESULTS Laboratory tests were performed during the previous geotechnical investigation. In addition to moisture content and grain size analysis, tests for direct shear and moisture -density relationships were performed. Results are included in this appendix. Direct Shear Tests Direct Shear Tests were conducted on selected soil samples, remolded to a density and moisture anticipated to be similar to the field condition of compacted embankment fill soils. The test procedure was in general conformance with ASTM D 3080. Density -Moisture Relationships Density -moisture relationships of selected samples from the potential borrow area were determined using Modified Proctor compaction tests. The test procedure was in general conformance with ASTM D 1557. HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake Test Hole Number: SB-10 ----------- ------ -�.__._-.---------------------- -_-._._—.-.—�-..---- ... Federal Way Washington Sample Number S—2 ----------------------------- ------------- - Project Number: 91147-2 Depth: 10-11.5 feet Date Tested: 5-14-93 Sample Description: ----- �._�----------- --- -------------..._.- Remarks: Grax,___poorly graded GRAVEL with sand SGP� Gravel: 52.4 --------------------------.....•-----•------.. —. . -••---.-.— --- Sand: 45.1 Silt• 2.5 ------- -------- Clay: -------- 1UU 90 80 w 70 Q � 60 Ln Z 50 W c 40 UJ 30 20 10- 0- Clay Silt Sand Gravel Fine I Medium Crse Fine I Crse SIEVE SIZES inn 1nn 60* d0 30 20 16 10 4 3/8 3/4 1 3/2 2 3 ------ ------------------ I I --J--L---J-L-L- 1 I I ---- I I -_1 1---1-1_I_ I I I I I I I I I I I I 1 I I I I I 1 I I I I I I I I ! I I I I I I I I I i I I I I -- - - -- - ----------- -- - - ---- --1--r---1-+-1-- ---- -- + I---+-t-I-- -- -- -- ---- ----- ---- - - - - -- I I - - I I I _J_L_L- 1 -^-- I ---I---1-1-I-- I I I I I I I I I I I 1= I I I I I ! I I I 1 -- �- I I I 1 I I I I I I 1 I I I I I I -- - - -- ----------- -- -_ - - -- --1--r"---1-+-r I -- - ---I---+-+-I-- I I I I I I 1 I I I I I I i I I I I I -- - - -- .-------- ---- - -- - -- - -J--L- -J-L-L- ---•^ --1_I^--1-1-I-- 1 r I I 1 1 I I I I I I I I I I [ I I I I I ! I I I -- - - -- ---------- - - - - -- ---I--r_-- ti-t- -- - -- --�- P-- - t -t -I 5 2 5 2 5 2 5 2 5 2 5 0.001 0.01 0.1 1 10 GRAIN SIZE — MILLIMETRES HONG WEST & ASSOCIATES, INC. GRAIN -SIZE DISTRIBUTION Project: Panther Lake ' Federal Way, Washington Project Number: 91147-2 Date Tested: 5-14-93 Remarks: GraYsilt�r GRAVEL with sand 100 90 so — IX IJJ 70 J J M 60 V) ►— 50 Z W IX 40 W n- 30 20 10 0 J Test Hole Number:_ TP-18 Sample Number: S—•1�to 5 --------------------------------- Depth: _ Composite Sample Description: Gravel: 48.8 Sand: 34.3 Silt: 16.9 Clay:. ._..._..---...--------- ------- Clay Silt Sand Gravel Fine f Medium 1 Crse Fine I Crse SIEVE SIZES —n Inn an An xn in 1A to 4 3/8 3/4 3 3/2 2 3 i I I I I I I I I I I I I I I _- - - -- ------ -- ---- - - - - -- 1 I -- I I I - I I I - - -- --1w1---�-1-I-- I I 1 I I I I I I I 1 I i 1 I I I l T 1 I I I I I I - I I 1 I I I I 1 I I I I - - - - - -- - - - - - - - - - - - - -- - - - - ! I - - - - t - - I I I - i - t - I- - I - - - - I _ - -t- I r I 1 I I I I I I I I I I I i I I I - - - - -- - - - - - - - - - - - - - - - - - J - - L - - - J - 1 - L - - - - - - - -I_- - - 1 l I -- -- - - -- ----------- •-- - - -- [- i I --i--i--"^-1-t I I I _ I I .....-- I I --i-I----t-t-I-- 1 I I I I I I I I I I I i l r I I I I I __ _ __JL_ _J_1^L- _-_ -_1_I___1_1_I__ i I I I I I I I I I I I I I I I I I I -- - --- ---- ----- -- - - - - -- --1--t---i-t--- - -- -- i-I---- t --t I 5 2 5 2 5 2 5 2 5 2 5 0.001 0.01 0.1 1 10 GRAIN SIZE — MILLIMETRES HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake ---------------- -• -- - .. Federal Way, Washington Project Number: 91 147-2 --�-� � - ------ Date Tested: 5-14-93 Remarks: Gray. ---poorly graded SAND with ---gravel �SP�------------------ 1UU 90 80 w 70 J J 60 Z 50 W 40 o_ 30 20 10 0 Test Hole Number: 513-11 Sample Number: S-5 ----- --------- - Depth: 16.5-18 feet Sample Description: Gravel: 33.9 ------------------------------ Sand: 62.8 Silt: 3.3 ------------------------ Clay: --------------------------------------------- F`�'-a y Silt Sand j Gravel Fine f Medium I Crse 1 Fine I Crse SIEVE SIZES 9nn 100 60 40 30 20 16 10 4 3/8 3/4 1 3/2 2 3 I I I I 1 I I I I I I { I I I I I I I - »r^ .__-^-----_-_.r_- -—J--L---J-L- I I L- I I I ---- --1 I---1-1-I-- I I I I I I I T I I I i� I I i I I I I I I __ �_ I __ _ I I _ _ _I_- I I I I I I ___ __ I 1 I I I I I 1 1 I - - - - - -- - - -- - - - - - - - - - - - - -- -- I I - - - - - t - -- I I I I I - -1 - + - - - I I I - - -- - I I - - i- I I I I I I I I -- - - -- ----------- - - - - -- I I -- J--L-- I I I I I I I I I - J -L-L- I I I I 1 I I I I - - I I --1-I---1-1-I— I I I I I I I I I I I I I I 1 I I I ___--- -------=--- - - - - -- I I I I --1--r- I I I I I I -1-+-r - - -- I I I I ---r-k-- I I I I 1 I - t-t-I-- I I I I I I ! I I 1 I -- — ———— --———————— .-- — — — —^ I [ —— I I I I I I —L_ I I 1 I I — — —— I I --1^I---1-1—I-- 1 I l I I I I 1 I I I I I I I 1 I I I I t r I I I I I I I r r I I I I S I I 1 -- — — —— ——— ---————— — — — — —— — —ti --r —1—t—-- — ——— --1-1— — t —t — I 5 2 5 2 5 2 5 2 5 2 5 0.001 0.01 0.1 1 10 GRAIN SIZE — MILLIMETRES HONG WEST & ASSOCIATES, INC. GRAIN -SIZE DISTRIBUTION Project: Panther Lake Test Hole Number: TP-19 ---------------- —----------------------------------------------w.w.-... Federal Way, Washington Sample Number: B-1 ---- ----------------------------------------------------------------_..._.-----•----------------- Project Number: 91147-2 Depth: 7.5-8.5 ---...................... -----W�.-............_...._ Date Tested: 5-14-93 Sample Description: - --- - ------------------ --------- —--------- -------------- Remarks: Gray, poorlX graded GRAVEL with silt - Gravel: 55.5 ------------------------------- - and sand �GP—GM�---�-__ --- Sand: 34.2 Silt: 10.3 Clay: ---------------------- -- 100 90 80 w 70 J J 60 N 50 z w CL) 40 W a_ 30 20 10 0 Clay Silt Sand Gravel Fine � Medium Crse Fine Crse SIEVE SIZES ,2nn inn fin An 3n 2n 16 to 4 3/8 3/4 1 3/2 2 3 -- - - -- -------- ---- -- I I I I --J--1----J-1-L- I I I I I I I I I ---- I I l I --J-I---1-1 I I I I I 1 i I - I I I I I I I I I I I I I I I I I I I I I I i I I I I I -- - - --- -- I I 1 I I I I l ! I ! 1 I I I 1 I 1 I I I ! -- - - -- - ----------- - - - - -- --1--i----i-+- I I -- I I I - ---- - -i -I- I -+�+-I-- I I 1 -- - - -- ----- ------- --- -- I I --J__L--_J_1_L_ I I I _-__ I -_1 I I I ! I I I I I 1 I I 1 I -- - - -- --------------- - - - --- I ------------- I I i I I I ! --- I I i I I I --- I I --- ----- I I I I I 1 � I - I I I -- - - -- ----------- - - - - -- i I --1--r-- I I i 1-+-I-- - -- E I -- r-I---+_+-I-- I I I I I I I 1 I I I I 1 I I I ! I ! I I 1 I ___.--- - _______----_____ _-.JL_-_J_1 _ I I ___ ___1_I___1_1_fw_ ! I I I I I I I I I I E 1 I 1 I 1 I I i I I I I I I I I i I I I I 1 l I -- - - -- ------------ - - - - -- --ti--r---y-+-r- ---- -- +-I 5 2 5 2 5 2 5 2 5 2 5 0.001 0.01 0.1 1 10 GRAIN SIZE — MILLIMETRES -1 HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake Test Hole Number: TP-20 ------------- -----•-----------------•-- ---._ _----------- - Federal Way Washington Sample Number: S-1 -------------------- -- ------------------------------ -.._ .— r._W.._-.._. �. - Project Number: 91 1 47-2 Depth: - 3.0-4.5 --- --- -- --- _._ ----------------- ---- -- p p Date Tested: 5-14-93 _ Sample Description: Remarks: Gray,_•poorlY__graded GRAVEL with silt — Gravel: 58.5 ------------ Sand: 32.8 Silt: 8.9 - - - ----- _`_ �---------- - ____----- Clay: ------------------------------- 1UU 90 80 Of w 70 J J a 60 In �- 50 z w 40 W a- 30 20 10 0 Clay Silt Sand Gravel Fine I Medium I Crse Fine I Crse SIEVE SIZES qnn inn en en -in 7n 16 to 4 3/8 3/4 1 3/2 2 3 ------- -- ----- ----- - - - - -- I I -- I I I - - - -- i I --J-l-__i� I I I I I I I I I I I I I I 1 I I I I I i i I I I 1 I I I 1 I I I I I I I I I I I ------ -- ----------- - - - - -- --1--r----I-+--- - - -- -- -t -I- - - -+-I-- I I I I I s l I I I I I I 1 I ! I I I I -- - - -- - ------ - - - - -- - -J --L-- I I J-L -L- I l I -- -- --1-t--1-1-I-- I I I I I I I I I I I - I I I I -- I ,- I I I I I I I I I I I I I I I I I F I I I 1 I I I I -- - - -- ----------- - - - - -- --1--r----1-+-r- , 1 I I I --- ---1---t I I +-1-- I I I ___-- ----------____-_ I _- I I I I I I I _J_L I I ! I ! I _- I I I I I I I I I I I I I I I I 1 I 1 I I I 1 I 1 i I ____ I I I I I I I I I I I I I I I 1 I , I I I I I ------ ----------------- -I-r---1-t-I-- ---- ---l---+-+-I-- I I I I I 1 I I I II I 5 2 5 2 5 2 5 2 5 2 5 0.001 0.01 0.1 1 10 GRAIN SIZE - MILLIMETRES I HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake Test Hole Number: TP-23 - -- —------------:------------------------------------._... ..... Federal Way, Washington Sample Number: S-2 --------------.-----------------....... ---------- ------ ---------- ------ --... Project Number: 91147-2 Depth: 5.0-6.0 -- .... __.-............... .......... --...... ----.. - P P Date Tested: 5-14-93 Sample Description: ............ Remarks: G S!y,__silty SAND with _q avel_r(SM) _--__ Gravel: 36.8 Sand: 44.9 Silt: 18.3 - - --- -------------- --- — _ _ - - -------._..._- _ Clay: --------_ 1UU 90 80 w 70 J J 60 N 50 Z W nc:) 40 W 30 20 10 0 Clay Silt Sand Gravel Fine I Medium Crse Fine I Crse SIEVE SIZES inn inn An An 3n 9n 16 to 4 3/8 3/4 1 3/2 2 3 I I I 1 I I I I I I -- - - -- ------------ ------- --J--L---J-L-L- I I I ! I I I I I I - - -- --1_t--- I I I I I -�-I-- I I I I I 1 I I I I I I I I I I I I I 1 -- I I I l I I ! -- — — —— ————————— --- --- — — —— --1--t---1—+-1-- I I I I I ---- ——l---t—t-I-- I E I I I __-_.._ ------------ - - - - -- • I I - I I I 1 I 1 I I I WJ_1_L_ I I I I I I I I 1 _- - I I -- I I I I I I I I I I I I I I I I I I ------ -- ---------------- I I ---1--r-^ I ! 1-+-r_ ---- I 1 --t-I---t-t-I-- I I I I I ! I 1 I t I 1 I • I I 1 I ! I I I I I I r I I ! I ! I I I 1 I 1 ! I I ! I I I I I I I I I I I 1 ______——.. ____ .._7—i __7_T_1__ r I 1 I I I t I I I ! •I 1 I I I I I I I — —— I I I I I I I I t i I t I 5 2 0.001 5 2 5 2 5 2 5 0.01 0.1 1 GRAIN SIZE — MILLIMETRES 2 5 10 HONG WEST & ASSOCIATES, INC. DIRECT SHEAR TEST RESULTS Project: Panther Lake Location: Federal. kZay, Wa5bincrton Project Number: Q'1147-2 Date Tested: _9-18-4-3 -- 2000 w a cn N w f5 1500 N W 2 N 1000 500 Test No. Boring: -1 9,. B-1 Depth (ft.): 7 5-8 Diameter (in.): 4 16 1500 2000 2500 NORMAL STRESS (psf) Average Dry Density (pcf): _ 1 2 4 9 Average Water Content %: Friction Angle (degrees): 28 Apparent Cohesion (psf): ?no Sample Description: Cray oorl a(9P-d GRAVEL with silt and sand GP -GM Liquid Limits: = n a Plastic Limits: = n Ja STU-SHEARTc"5.0 1 IONG VI[ EST & ASSOCIATES • Geotechnicol Engineering • Hydrogeology • Materials Testing •. Construction Inspection • COMPACTION TEST RESULTS Project: Panther Lake Sample Number: 1345 Address: Federal Way, Washington Sample Location: TP-19► B-1 Sample Description, Gray, poorly graded Job Number: 91147-2 GRAVEL with silt and sand (GP -GM) Date Tested: 5-15-93 By: SEG r:l;Pr,t• Brown and Caldwell Attention: 140 135 130 125 120 115 Z' 105 0 100 95 90 85 so ; 0 Maximum Dry Density: 138.5 Optimum Moisture Content: 7.5 Natural Moisture Content: 4.7 Compaction Standard: ASTM D1557 PCF 96 Hammer Weight: 10 lbs. Hammer Drop: 18 ins. No. of layers: 5 Number of blows/layer: 56 Diameter of mold: 6 ins. Height of mold: 4.584 ins. Volume of mold: 0.075 cu.ft.. Surcharge Weight: lbs. Vibratory Amplitude: ins. Vibratory Frequency: vib./min. Vibratory Time: min. Compactive Effort: ft.lbs./cu.ft. 5 10 15 20 25 30 35 40 Moisture Content -- % All tests performed in accordance with ASTM 1333 NI NOLLVA3l3 N N N -1 J Z ^ O Y pQ� Q- Z Q Ir LLI SOWS r$ O �W WLLJ Q 0 0 aa o { c� W a cn i z? I}';< a� a - UV v d LL fx U1,' W '.. Cam' :'•:?i.'�N. U J � � six. w W IL M z m ` U W cc J a W F5 W � r W N W H Z Z Z Z 2 F 0:5 I`,} z�In O a. 2 IL-CU �o Yyt?w y W oo �0� vi ~w 9 NZC Q I ]i g 'F'm pp pp Id IJ W m,n� — � n� o.. 0 I yo�En 7v ana p� U a inWN Go 0 pp 8 % N ^ I x ate'" 112 W W Q ti7tiC z�Q� Z OWtA 33 Ca- �� W ��j `fin Iy a pWK Y F �a 4'nu7d ort� ~a°�' JU O 0Z NW� taunt O 1 I N <� OWMW Ov W c �Ci -A<�N�F IV WD Ix S2 va �W�o 4J� vain �1 I a cCr pp7 rl�G rjU N LV a F= U Sim 0 0 a [�V N N 133.4 NI NOLLVA313 _W F" U Q W Z 0 Z IZ O W H W F- W Q � Ix Q D CY IL k v qn 40 09 qv rr�,,i�: is • `+,•`z���`x�;r, ! � �4���p ' i'' �if�'��� � a��fs ;Fib _k �•�' i.1' �' , _ !; '�.. �r',' _ }'rn ...3 �f ;i5R1 - �:•'`'�ir s •i Y�:� ' i3.� � . 6• y: .. "� � :.''= y Y :..:Jf .•_: p:. �T- � S�• Y Y. y ,• x ji[ �t'ir ... .. nr ,'j. ^�:1 titi. r Ate' t:'�''r5 Y"'' :i'w - -.r�• E.:, s ,. =,fir '•y � . :���. :ti yY: �: �.N��1�'':+k',] 'Y•''-"P' •if`sis.� •�y�Y:" �• .. .. 1. :i fY r+,. ."ref p Si��J � ` Y'£': l { ! _'-�;.:' : - •�+•��• _ {fir _.-- ° . j�'r i`_ � `t��r• .-x. •�~.✓.' -'s-:, •-.:• _ ' t•• � �, ,!'.. F',r . _.z ,-?ayy1- �r .fi .> }.r i �-�''1i• _ _ r;yr� ,�X ��'r:•! :G=• C . ,t �� _ , :1� ♦N ''jc'y �• � '.y.y ".'' i !{'i .� � ... �' ., � ` ..: "��:J 4'-'.r 1�F1 ��_'7'F� i[,r - f 0 •'l 3.'4-i �[�' '! '' b' .. yRh�r;i ,. � s ^. � . � �,.�,.,.�� �••,�.: � s sue, f �:: � :.r'� .;;f* '"r'f'ti���: v;k.�`'�' -�''��'' `��Y. '��a�:5:=�r- •�1iy : of •. :. •• •. .. :;� ',,.. _ ._ _ .F... -`"�' ��••-, �ga,r ��i• c �_ �•� _ ` yf� — . "°�:ti�:' .. �S._ �• :r ' �r' �'. ��v �'� r.,;.:.• rye ,-,. ;' i g�i•• q "�r •.� -�• r�.y `�... s• ,y � ' n, +y4A•�... ]r•a 5•_ 4 i.' ti �a�►j�'�}j:'';�� �' � ;••�l_s,,l 5}}}x?i Z• •St +°yr.n.-.:Qc•�. ° 'i��i-`: F.+.:_.., •. ,..�'LR��� 5 �� �[. ��:'�R=et.��.+s.4'� t�'�:• �� • _ ..e•- �,:Ar�d. .✓`.'i.�.:i':. n:I. r 1 ,�- HWA Project No. 94003 February 3, 1994 Revised April 12, 1994 Brown and Caldwell Consultants 100 West Harrison Street Seattle, Washington 98119-4186 Attention: Mr. Bill Persich Subject: Geotechnical Investigation First Avenue Basin Detention Facility Federal Way, Washington Dear Mr. Persich: u 01 flONGWEST & ASSOCIATES. INC. Geotechnical Engineering Hydrogeology Geoenvironmental Services Testing & Inspection In accordance with your request, Hong West & Associates, Inc. has completed a geotechnical investigation for the proposed First Avenue Basin Detention Facility located in Federal Way, Washington. Results of the investigation are presented in the accompanying report. We appreciate the opportunity to provide geotechnical services on this project and look forward to providing further services during design review and construction. Should you have any questions regarding this report, or if we may be of further service, please do not hesitate to call. Sincerely, HONG WEST & ASSOCIA' Scott L. Hardman, P.E. Senior Geotechnical Engine DLS:SLH (94003.doc) 19730-64th Ave. W. Lynnwood, WA 98036-5904 Tel. 206-774-0106 Fax. 206-775-7506 1 1 f ; TABLE OF CONTENTS � n 1.0 INTRODUCTION.........................................................................1 f� 1.1 EXECUTIVE SUMMARY......................................................1 1.2 SCOPE OF SERVICES AND AUTHORIZATION ..........................1 2.0 PROJECT SITE CONDITIONS........................................................2 3.0 EXPLORATION PROGRAM........................................................... 2 3.1 FIELD INVESTIGATION....................................................... 3 3.2 LABORATORY TESTING......................................................3 4.0 SITE STRATIGRAPHY..................................................................3 4.1 GENERAL GEOLOGY OF THE PROJECT AREA .........................3 4.1.1 Fill (Qf, Qfd) 4 , ........................................................... 4.1.2 Lacustrine Sediments..................................................4 4.1.3 Recessional Outwash (Qvr)...........................................4 4.1.4 Glacial Drift (Qd)......................................................4 r ` 4.2 SUBSURFACE CONDITIONS.................................................4 4.2.1 Proposed Dam Location..............................................5 r 4.2.2 Potential Borrow Area ................................................ 5 5.0 CONCLUSIONS AND RECOMMENDATIONS....................................6 5.1 PROPOSED DAM...............................................................6 5.1.1 Foundation Preparation ................................................ 6 5.1.2 Recommended Configuration ......................................... 6 5.1.3 Drainage Control.......................................................6 5.2 DETENTION POND ............................................................7 5.2.1 Design Considerations................................................7 5.3 SLOPE STABILITY ANALYSES.............................................7 5.4 MATERIAL AND COMPACTION REQUIREMENTS ............... 8 - 5.4.1 Gradation Requirements .............................................. 8 5.4.2 Compaction Standards ................................................ 9 f 5.5 SITE DRAINAGE................................................................9 6.0 LIMITATIONS............................................................................10 7.0 BIBLIOGRAPHY r .........................................................................10 LIST OF FIGURES Figure 1. Site and Geologic Map Figure 2. Geologic Section A -A'; Proposed Dam Figure 3. Generalized Cross Section - Proposed Dam LIST OF APPENDICES Appendix A. Logs of Exploratory Borings E Appendix B. Laboratory Test Results Appendix C. Previous Test Pit and Boring Logs Appendix D. Previous Laboratory Test Results n II 1.0 INTRODUCTION Hong West & Associates, Inc. (HWA) has completed a geotechnical investigation for the (� First Avenue Basin Detention Facility in Federal Way, Washington. The proposed dam will tie into the recently completed Panther Lake Ball Field Dam, and will serve as a detention structure for controlling storm water. r- The purpose of this geotechnical investigation is to provide design -level analysis for the proposed detention facility, located east of the Ball Field Dam. Based on subsurface data obtained for the Ball Field Dam, and borings completed for this study of the proposed l detention facility dam location, it is our opinion that the proposed improvements can be constructed as planned, provided the geotechnical recommendations of this report are incorporated in design and construction. 1.1 EXECUTIVE SUMMARY Geotechnical investigations and analyses were conducted by HWA, in support of the design efforts for the proposed facility. The major conclusions and recommendations resulting from the geotechnical investigation are summarized below: 1. The proposed dam configuration is considered stable, under static, steady seepage and rapid drawdown conditions. - 2. Toe drains are recommended for the portions of the dam 4 feet or higher, along the segment which is not common to the Ball Field Dam. 3. Approximately 8 to 13 feet of loose fill soils were encountered along the alignment of the proposed dam. The loose fill beneath the proposed dam should be removed and recompacted prior to embankment fill placement. 4. A gabion spillway may be used along a portion of the existing Ball Field Dam to accommodate excess water from the detention pond. Details of the subsurface investigation and laboratory testing performed, results, conclusions, recommendations, and limitations of this report are discussed in subsequent sections. The executive summary presented above should be considered only in the context of the entire report. 1.2 SCOPE OF SERVICES AND AUTHORIZATION The scope of services for the present study was outlined in an agreement for professional { services between Brown and Caldwell Consultants (B&C) and HWA, dated November 1, L, 1993. L The proposed scope of services was as follows: f HWA Project No. 94003- "' February 3, 1994 'Revised Apnl 12, 1994 r.. L Reviewing the previously gathered soils data pertinent to the project area. I Drill two borings to average depths of 40 feet at the proposed dam location l to determine the groundwater conditions, soil characteristics, and foundation characteristics. 3. Perform laboratory testing of selected soil samples to determine the engineering properties of the soil at the proposed dam location. s 4. Provide design recommendations as to suitability of the existing soil to serve as foundation material for the dam; results of slope stability and seepage l analyses; and determination of appropriate cross sections for the dam, including allowable side slopes, slope protection, toe drain design, fill r . material and compacted fill placement requirements. 5. Satisfactorily respond to WDOE Dam Safety comments. 2.0 PROJECT SITE CONDITIONS The project site is located northeast of S.W. Campus Drive, in the city of Federal Way, Washington, as shown on the Site and Geologic Map, Figure 1. An earthen dam has f recently been constructed by the City of Federal Way along the south and east sides of i Panther Lake. A second dam to the south encompasses several ball fields. A former King County gravel pit exists south of the lake. The areas immediately north and east of the lake are undeveloped; residential developments exist beyond. Panther Lake Dam borders the lake on the south and east. Height of the berm varies from approximately 2 to 10 feet. Two outlets extend beneath the berm, one continues underground beneath the ball fields and the other attaches into the recently constructed infiltration galleries. A gabion spillway has been constructed on the Panther Lake Dam, to accommodate high flow conditions. Downstream from the main dam is the Ball Field Dam, serving to control storm water in the event the main dam is over -topped. 3.0 EXPLORATION PROGRAM The field exploration program and laboratory testing of soils for physical properties performed during this study are described below. 94003.DOc 2 HONG WEST & AssocIATEs, INc. it HWA Project No. 940U-i February 3, 1994 i Revised _6ril 12. 1994 19 3.1 FIELD INVESTIGATION On January 11, 1994, HWA personnel monitored subsurface investigation and soil sampling at the project site. Two exploratory borings (designated SB-12 and SB-13) were conducted at the approximate locations indicated on Figure 1. The borings were logged in the field by HWA geologists. Representative samples were obtained, placed in air tight containers and returned to the HWA laboratory for further testing. Field exploration methods are described and logs of the borings re contained in ` Appendix A. } Additional test pits and borings were conducted during a previous phase of study (HWA report dated June 30, 1993). The approximate locations of the previous explorations are f also shown on Figure 1. The logs of these exploratory test pits are included in Appendix l C. c 3.2 LABORATORY TESTING Selected soil samples were tested for physical properties, including moisture content and grain size distribution. Results of the moisture content testing are shown on the appropriate boring logs. The grain size distribution curves are included in Appendix B. Additional laboratory testing conducted during the previous geotechnical investigation are included in Appendix D of this report. 4.0 SITE STRATIGRAPHY 4.1 GENERAL GEOLOGY OF THE PROJECT AREA The project area, as mapped by Waldron (1961), is underlain by proglacial stratified drift consisting of undifferentiated recessional outwash sediments. This unit is underlain by ground moraine deposits consisting mainly of dense to very dense glacial drift. A more detailed surficial geology of the site, as mapped by HWA personnel during the previous investigation, is indicated on Figure 1. Three major surficial soil units were noted during the January 11, 1994 and May 6 and 8, 1993 field investigations. These consist of fill, recessional outwash, and glacial drift. One subsurface unit, lacustrine sediments, was encountered at depth in two of the borings, SB- 10 and SB-11. Amore detailed description of general geologic units encountered at the site is presented below. 94003.DOC 3 HONG WEST & ASSOCIATES, INC. t HWA Project No. 94003 February 3, 1994 ?Rais April 2 r ` 4.1.1 Fill (Qf, Qfd) Fill or disturbed soils are present along S.W. Campus Drive and adjacent to the Ball Field ` Dam. Based on our observations, the fill material appears to be derived from the former King County gravel pit. The fill consists of loose, silty sand and poorly graded sand with s varying amounts of gravel and deleterious matter. The maximum depth of fill encountered was 8 to 13 feet in borings SB-10, SB-11, SB-12, and SB-13. The exploratory test pits revealed no fill material greater than about 1 foot thick overlying the glacial deposits. 4.1.2 Lacustrine Sediments Stratified silts and fine sands were found in borings SB-10 and SB-11 on the south side of the lake, underlying the recent soils. These stiff or medium dense, fine textured soils are thinly bedded to laminated. Borings SB-10 and SB-11, conducted during the May 6, 1993 field investigation, encountered lacustrine deposits at depths around 20 feet, which extended to the full depths of the borings. 4.1.3 Recessional Outwash (Qvr) Recessional sediments released and transported by the waning glacier were deposited throughout the study site. The material is predominantly a stratified sand and fine to cobble size gravel of glaciofluvial (glacial stream) origin. These soils are exposed in the northern and western portions of the site, and appear to have been mined from the area now occupied by the baseball fields and parking area. Recessional outwash was encountered in all exploratory borings and in TP-22 and TP-23, at varying depths directly below the f fill/topsoil. 4.1.4 Glacial Drift (Qd) Glacial "drift", as the term is used here, is a near till -like material found at depth in all five exploratory test pits (May 6, 1993). The drift consists of a dense to very dense mix of sand, gravel, and silt. It may show some faint bedding, but is typically massive. The high t density is due to the materials having been over -ridden by glacial ice. The drift observed during this investigation did not exhibit the low permeability qualities usually associated with Vashon Till. l: 4.2 SUBSURFACE CONDITIONS Subsurface conditions at the site are discussed below, in two sections: Section 4.2.1 discusses the proposed dam location, and Section 4.2.2, the potential borrow source area east of the ball fields. 94003.DOC 4 HONG WEST & ASSOCIATES, INC. HWA Project No. 94003 February 3, 1994 4 Revised April 12. 1994 4.2.1 Proposed Dam Location Subsurface conditions at the proposed dam are interpreted based on exploratory borings SB-10, SB-11, SB-12, and SB-13. A generalized soil profile along the proposed dam ` alignment is shown on Geologic Section A -A', Figure 2. The upper 5 to 13 feet of material encountered in the borings are interpreted as undocumented fill soils, consisting of very loose to loose, silty sand and poorly graded gravel. Below the fill soils was a layer of medium dense sand and gravel. This unit is interpreted as recessional outwash, and extends to depths of approximately 20 to 25 feet in SB-10 and SB-11, and to approximately 41.5 feet in SB-12 and SB-13. Lake deposit (lacustrine) sediments were encountered below the recessional outwash in borings SB-10, SB-11, and SB-13. The lacustrine deposit predominantly consists of silty sand and sandy silt. It extends to the maximum depth of exploration at approximately 42 feet. Ground water was encountered in all four borings; the approximate depths to ground water in each of the borings at the time of drilling are summarized below: Boring Depth to groundwater at Time of Drilling (ft.) SB-10 20 SB-11 20.5 SB-12 40 SB-13 30 Groundwater levels should be anticipated to fluctuate in response to rainfall rates, seasonal and other factors. 4.2.2 Potential Borrow Area Two test pits (TP-22 and TP-23) were excavated in the area directly east of the existing ball fields. Based on the test pit explorations, it appears that the area is blanketed with a 3- to 4-inch layer of organic material, over loose brown, silty sand with gravel (fill/topsoil mix) ► . to a depth of approximately 2 feet. Below this layer, soils graded to brown and gray, gravelly sand and sand with silt. This unit is interpreted as recessional outwash, and it f extends to a depth of 3'/2 to 5 feet in the test pits. The lowermost unit encountered in the test pits is interpreted as glacial drift. It consists of very dense, gray, silty sand and sand with silt. 94003 noc 5 HONG WFsr & AssocuTEs, INC. HWA Project No. 94003 February 3, 1994 1 Revi5ed AlDnULi_924 5.0 CONCLUSIONS AND RECOMMENDATIONS -Based on the results of the geotechnical investigation described herein, the following _ conclusions and geotechnical recommendations are presented for the proposed improvements. 5.1 PROPOSED DAM The First Avenue Basin Detention Facility Dam is planned southeast of the ball field area, and will tie into the existing Ball Field Dam. The proposed dam, in conjunction with the Ball Field Dam, will serve as a detention pond for containing excess storm water originating from the development. The location of the proposed dam is shown on Figure 1. 5.1.1 Foundation Preparation �J We encountered loose surficial soils in the borings along the proposed dam alignment. Consequently, we recommend improvement of the foundation soil prior to constructing the dam, to minimize the potential of post -construction settlement and of internal erosion (or "piping") of soils beneath the dam. r We anticipated that the loose surficial soils are on the order of 5 to 13 feet thick. These L loose soils should be removed to expose the underlying undisturbed recessional outwash, to a lateral extent as indicated on Figure 3. The results of our laboratory analysis indicates that the material beneath the proposed dam alignment is relatively clean (less than 5 % passing the No. 200 sieve). Consequently, the excavated materials do not meet gradation requirements outlined in Section 5.4.1, and should not be used as embankment fill. The removed soils may be suitable for other uses related to the development. 5.1.2 Recommended Configuration The recommended configuration of the lower dam is shown on Figure 3. We recommend a 10-foot wide crest and 3:1 (horizontal: vertical) side slopes on both the upstream and ' - downstream sides. The side slopes may be graded to a flatter inclination for ease of maintenance, or for other considerations. V5.1.3 Drainage Control A toe drain is recommended for portions of the dam greater than 4 feet in height, as summarized on the table below. Approx. Toe Drain Embankment Toe Dimensions Pea Gravel/Pipe Hei t (ft.) Drain ? (width x depth, ft.) Drain S stem ? 4-9 yes 10x2 yes < 4 no — — 94003.DOC 6 HONG WEST & ASSOCIATES, INC. r-"k HWA Project No. 94003 February 3, 1994 Rom, April 12,1994 A toe drain will not be required for the portion of the proposed dam which is common to the Panther Lake Ball Field Dam. 5.2 DETENTION POND - With the construction of the proposed dam, a detention pond will be formed. The pond will be confined by the Ball Field Dam to the west, the proposed dam to the south, and by the hill rising away from site to the north and east sides. Portions of the material excavated within the detention pond area and from the adjacent northeast slope may be used as embankment fill in the proposed dam. Grain size results from TP-23 confirm that the glacial drift material tested meets the embankment fill specification described in Section 5.4.1. 5.2.1 Design Considerations Cut Slopes_- Based on the soil conditions encountered in the detention pond area, we recommend side slopes not to exceed 2:1 (horizontal: vertical). However, slopes at an inclination of 3:1 would be less susceptible to the effects of erosion and construction traffic. �^ Embankment -Material - The glacial drift soil in the detention pond area appears generally acceptable as embankment fill for the proposed dam, based on the grain -size distribution specified in Section 5.4.1. However, due to lateral and vertical variation of on -site r materials, we recommend that the excavated material be tested for grain -size distribution prior to and during its use as embankment fill. All excavated material to be used as fill must be free of deleterious matter. Gabions - A gabion spillway is planned to channel excess storm water out of the detention pond and into Ball Field Dam. We suggest using a series of gabions for the proposed spillway, in a similar fashion as was used on the Ball Field and Panther Lake Dams. The i gabions, which will lie along the crest and downstream side of the dam, must be founded on dense, compacted fill material. 1 A filter layer should be placed between the gabions and the embankment fill. Due to the large difference in grain size distribution, it is our opinion that use of a graded soil filter is not feasible. We recommend that a filter fabric be used. Based on the grain size distribution of the potential borrow materials determined in the laboratory, we recommend that Polyfelt TS-420, or approved equivalent, be used for this purpose. 5.3 SLOPE STABILITY ANALYSES Slope stability analyses, performed during the previous geotechnical investigation for the Ball Field Dam (HWA report dated June 30, 1993), demonstrates adequate Factors o Safety for the three case outlined below: 94003.DOC 7 HONG WEST & Assoc1ATEs, INc. HWA Project No. 94003 r' FebruaFy 3, 1994 lR;vi5d April 12 4 Case I. Upstream slope stability at full reservoir level Case II. Upstream slope.stability during rapid drawdown Case III. Downstream slope stability at steady state seepage and full reservoir ` Slope stability analyses was performed using analytical methods proposed by Janbu (1954). Shear strength parameters for the compacted fill materials of the Ball Field Dam were based on laboratory direct shear testing. r- The soil parameters and general geometry of the Ball Field Dam match closely those of the proposed dam. It is in our opinion, therefore, that the slope stability Factors of Safety of the proposed dam will be similar to or more conservative than the Ball Field Dam. 5.4 MATERIAL AND COMPACTION REQUIREMENTS This section discusses the recommended specifications for embankment fill, drain materials, and the required level of compaction. 5.4.1 Gradation Requirements Embanbnent Fill Soils - The following gradation requirements are recommended for embankment fill soils: Sieve Size % Passin 3" s uare 100 1" square 70-100 No. 4 40-80 No. 10 30-70 - No.20 25-60 No. 40 20-50 No. 100 10-30 No. 200 3-20 In general, glacial drift materials observed in test pits excavated along the hillside east of the ball fields meet these gradation requirements, as determined from the sieve analyses performed on selected samples (see Appendix D for test results). Such materials may be used in construction of the proposed dam embankment. As noted previously, gradation of materials used as embankment fill should be verified prior to placement. Drain Materials - ` Toe drain materials should conform to the following gradation requirement: f 94003.DOC 8 HONG WEST & AssociATFs, INC. HWA Project No. 94003 February 3, 1994 I J Revised April _12._1994 7 r- Sieve Size % Passin 1" square 100 3/8" square 70-95 'No. 4 55-85 No.:10 40-70 No. '20 30-55 No. 40 20-40 No. 100 10-20 N0. 200 0-3 The gradation requirements for the drain materials were determined based on the gradation ` characteristics of the potential borrow material, as determined by mechanical sieve analysis [ conducted on the selected samples, and our engineering analysis. 5.4.2 Compaction Standards r• r All embankment fill should be placed in loose, horizontal lifts less than 8 inches in thickness, and compacted to 95 % of maximum dry density, based on Standard Proctor (ASTM D 698). The procedure to achieve proper density of a compacted fill depends on the size and type of compaction equipment, the number of passes, thickness of the layer to be compacted, and certain soil properties. Generally, loosely compacted soils are a result of poor workmanship or of soils being compacted at an improper moisture content. Soils with a high percentage of silt and clay may easily become too wet, or coarse -grained soils may easily become too dry for maximum compaction. Silty or clayey soils with a water content higher than optimum should be dried as necessary. Sprinkling is sometimes required to wet a coarse -grained soil to its optimum water content before compacting. 5.5 SITE DRAINAGE Adequate drainage provisions area imperative and we recommend both short and long term drainage measures be incorporated in project design and construction. Of major concern would be the discharge or ponding of surface water during construction since the native t soils are considered moisture sensitive. To minimize the potential for surface water and/or groundwater damage to the subgrade, it is recommended that construction operations be performed in the drier summer months when possible. Surface runoff can be controlled during construction by careful grading practices. Typically, these include the construction of shallow, upgrade perimeter ditches or low earthen berms and the use of temporary sumps to collect runoff and prevent water from r damaging exposed subgrades. All collected water should be directed under control to a 94003.DOC 9 HONG WEsT & ASSOCIATES, INC. HWA Project No. 940W ' February 3, 1994 Revised April 12. _1994 P positive and permanent discharge system. Permanent control of surface water should be incorporated in the final grading design.. 6.0 LIMITATIONS This geotechnical evaluation was planned and conducted in accordance with generally accepted engineering standards practiced presently within this geographic area. Experience has shown that geotechnical investigations performed by these standards reveal with reasonable regularity soils that are representative of subsurface conditions throughout a site. The analyses and recommendations contained in this report are based on the assumption that soil conditions encountered in subsurface explorations are representative of actual conditions throughout the subject site. However, experience has also proven that subsoils can vary quite radically over small distances. Inconsistent conditions can occur between explorations and not be detected by a geotechnical study. If, during future studies or construction activities on site, subsurface conditions are encountered which are different from those described herein, HWA should be notified for review of the variances and revisions of the conclusions and recommendations presented, where necessary. This report is prepared for the exclusive use of the owner and the owner's consultants, for specific application on this project in accordance with generally accepted engineering practices. No warranty, expressed or implied, is made. 7.0 BIBLIOGRAPHY Hong West & Associates, Inc., 1992, Preliminary Geotechnical Investigation, Panther Lake Surface Water Study, Federal Way, Washington, July 28, prepared for Brown and Caldwell Consultants. Hong West & Associates, Inc., 1993, Geotechnical Investigation, Panther Lake Flood Control Project, Federal Way, Washington, June 30, prepared for Brown and Caldwell Consultants. Janbu, N., 1954, Stability Analysis of Slopes with Dimensionless Parameters, Harvard Soil Mechanics, Series No. 46. Skemton, A. W., 1986, Standard Penetration Test Procedures And The Effects in Sands of Overburden Pressure, Relative Density, Particle Size, Ageing and Overconsolidation, Geotechnique 36, No. 3, pp. 425-447. Waldron, H. H., 1961, Geology of the Poverty Bay Quadrangle, Washington, U. S. Geological Survey Geologic Quadrangle Map GQ-158. 94003.DOC 10 HONG WEST & AssocIATEs, INc. a a o� z QWQ F- MO W 0 ---- — --I .-1 -"1 r, r, W-- n .-, .--, r-, r I n r--9 r-, r-% r-, 1333 NI NOl1VA313 p O r N cod O N g N O N N Q iFA N � 3 co 2 �yr 11 Ky Af �� c� ~ � 5 i mm w �, nN +o ►7i � N H CO 10 d N r / iy l N i ti th [�] p Ti N N r I r�� N v Q$ n m g N N N N 133J NI NOLLVA313 a R a a �o c M WCD N O rn 8CL C Z w WU � N z WZ F- U N� z H- w dl s �u ■'F'a ■ w a A NI NOLLVA313 N N N O <p < Z o a� I ' � a N < ~ Ia J ya. � W z Z J o b wIL ^I 80 W lip a $p- I v W c WF �� is I E Ss t5fi� o= � ib N 1— Y qgq 1 g -0 I� EVE J F N [V 1333 Ni NOLLVA313 Z 0 U w V IQ V O U U) 00 w a" IV jr J 0- w W U Z N H Q J m U LIJ Q LL Z Z O Q Z Lxw LL- 0 w 0 0 rn "PFISMIX A t•r, a LDS OF EXPLORATORY�yB0RIl�' . _i'• ter`: t-' •'� • o,i' � ' _ . - ._ - r _ - �<'�':.� " - - - . • - - •j{•>•.' - _ �iy :,.,yam � _a " j~ 1-7 :'�rt rr}vnl - .. _ - . _ iti'•. ..7 _: '.C. 'r�._-•' _ - - ._ � •` : [ -!:.R .,c fir' - �ti _. -- ��. ... .. J:� �`', �. .e __ _ _ _ _Y:z�q r•: •,,'.d•'�y,cf,. is :.5.'•. •�cf[..ti,�: � - .. ." �,��s�i�.v`. _=S .�„-- •�'^rK' yT9:' _ -wry •i�:�•�•-� nl:•' 3� .,aC•{;, 'j' ar#�+`�,:: r�Tr -���''R;'-- - :�� =ze o-' .FL�"y -- Y." .._• T. �y ,ate'-•.`-•.iYT• _ _-3,$,,r+•+N i''. ..F ,,,r-c• 1•..i�??Y." '.Zl� i." "s. - 7 •7Y f �°'.�..'� �t� ,%'.}` }s}'.0 „� - r�' -�Ci "•" -. Ytc_�L ti� y iFimvk � �y L :l �- ._ •.3�',:}� ln--;,�rh-•��. `.:-`.y�y{.'el-ei'd• 1 z��4: malrJ�� � � r `. .r.., � 'Y. r�; 7C+s= • i.a i d r�,p A= *�__ '� . f �_ � . 1 ��_•^� ~•J ti. �3,.7'.w 7, � :lp, r . •1,' ny: �•i•';� : µ•{r' �•' =� , Ems. ' nt yl. _ '.� L� �ry�Y. ,y,. i•^yv_ .l -_4 ,���i �i'; y1�';!_R',•^.'t ,' •,v4. �`ii .. .`. .IZ'jS a"r•.. � _ "�� ';f. 4 }• r, '�� 'vwtJ• ur r!w:Y,. F.. _• �.• .SV�i �� ..r�•K. +�j �..�• _ •�y.y}.. .. ..F_-:'Y F ^a ' ' .,.'S. _s��Fa•: '�.'6',ij".'� -'�'`-'i: __ �.�.�-` ��E..F irf _{'fi•'fi'1=-Y _�..y:e•.. �. _ � -�����•�_n`.43•r� �{C�f`:�.,:..:LY:- � _ __ .• -. 2�Y. .�_:a%• . a, yfr. r• -Y.�.. -1•A. .•�..: M"7 Y-•kw .f'�i �f` �•, _� - .. --'�'u '��' s1:, . , �' , =k+".� r•'a.' r�r A• * k.�'-._. 59>" ... r " r, a .,.' - _ �, i _ - - -fin; ��.. ti._.• ' ` a• _ _ ' } :•: ,� ,i }:t:': �F'. r`•=..• f s.� �Y• ; • +' � 4 i :ice y .-. f •- 3 ._�.�:_ ,yam-• � � •. � �` .`�� '�. _"i•.:�.J •- Af�;{ � •- .•his �-i��• •�'•h- - �:'J ']:. 4.. � "'�'�i i�,�,�itrb�+.��'3-: `L.-�.,' � ��..P. �'�•' .7_s .,,l., � :ii K-i-.'.? �i�r :]3'ir;•. •, r,,-,,,c. -ii: ',S;y7r,.ij�+•.�-�C'•!. Y "i. e��. C-:.-r_fF t�.yy .;'L.,�'}�"•., iS.-. IIRk"_- }�•Y• r.,.•. 3i*t �•°y(�,' 1rr.'.•y �.. yt ` •3i-'r .. ••• •3_',�.,�:. � f 3���u �,14� _ '� -�•-.�_M1.'�°'. �' d-,�. y _ 4�-q". y'�y. a• ~�� � _ �Cti' . s ,,,�` :A_�.,r•?7r'" °�ssbr. -ti , .: si"{ w';y��=:-E. a:•: 'i�. _: �y-_ Sir v ,. � v- ";:art?. i?^•'�t •r: r •- .YI 7� '-Y�.`.r;�5^ ,,.... • ',: '.:r3-` _ :_Y:"rJ�.+ •FSr :�f Vie': ' " •�. �Ar'--' !-"-'w .,.��� ''f',.:. •i .b � � rJ.= J f" •'.1 ''}1=�°..%� _ j/' •,:� � ti'?'i:Y_S%�F _ : ,e'Fe `lE „y . ` � �.-Y's�r?•. ��-yy�y. , ; . � : :� - .... ;'�:;rir+��� ��• ;��- 1;�=•' ?+<� i_.al=�i�r -nT +4r�:.�.Y�e. • :�G'.ri =ti,;^~�t:���v_�.i. _.,,tr .k'.i.•.' li _ •.yT�^5 _1 • �`,.r• �'�Y ryl; .. � � __ HONG WEST & ASSOCIATES, INC. . ,,: -" ... - '-_ - � ., .7'y '•pia' •. . r. APPENDIX A LOGS OF EXPLORATORY BORINGS n On January 11, 1994, HWA personnel conducted a program of subsurface investigation and sampling at the project site. Two exploratory borings were drilled at the approximate locations indicated on Figure 1. The borings were drilled using a hollow stern auger and a 140-pound hammer with trip release mechanism for performing Standard Penetration Tests (SM. Soil samples extracted from the borings were examined, classified, and logged in the field by HWA personnel. Samples were taken with a 2-inch (outside diameter) split spoon sampler, driven 18 inches into relatively undisturbed soils beyond the auger bit by dropping a 140-pound hammer 30 inches per stroke. The number of blows for each 6 inches of penetration was recorded, as shown on the boring logs. The number of blows required to drive the last 12 inches was totaled as the SPT N-value. The N-values are plotted on the boring logs and are used as an index to estimate certain engineering properties of the soils. Additional borings and test pits were conducted during a previous phase of the Panther Lake project O-RVA report dated June 30, 1993). Approximate locations of the previous explorations are also shown on Figure 1. The logs of the previous exploratory borings and test pits are included in Appendix C. r i. LEGEND OF i RMS USED ON EXPLORATI .q SOIL LOGS r r r Soil classifications presented on the exploration soil logs are based on visual field and laboratory observations, using ASTM D 2488. Soil descriptions are presented in the following general order: Density/consistency, color, modifier, MAJOR CONSTITUENT, minor constituent(s), moisture content, soil structure(s), additional remarks. DENSITY/CONSISTENCY Density/consistency of soils encountered in exploratory borings is usually based on the Standard Penetration Test (SPT) N-value or "blowcount', ASTM D 1586. Using this method, the sampler is driven 18 inches with a 140-pound hammer falling 30 inches. The SPT N-value is the number of blows for the last 12 inches of sam ler drive. Unconfined Granular Soil SPT Cohesive Soil SPT Compressive Density N-value Consistency N-value Strength (tsf) Very loose 0-4 Very soft 0-2 < 0.25 Loose 4 - 10 Soft 2-4 0.25 - 0.5 Medium dense 10 - 30 Medium stiff 4-8 0.5 - 1.0 Dense 30 - 50 Stiff 8 - 15 1.0 - 2.0 Very dense > 50 Very stiff 15 - 30 2.0 - 4.0 Hard > 30 > 4.0 MOISTURE CONTENT Dry Little perceptible moisture Damp Some perceptible moisture, probably below optimum Moist Probably near optimum moisture content Wet Much perceptible moisture, probably above optimum MINOR CONSTITUENTS Trace Some Modifier (sandy, silty, etc.) Very (plus modifier) Estimated Percentage 0-5 5-12 TERMS DESCRIBING SOIL STRUCTURES 12-30 30-50 Bedded Composed of layers thicker than 1 cm, of varying color and/or texture. Calcareous Containing a significant amount of calcium carbonate. Cemented Rock or soil hardened by the precipitation of a mineral cement among the grains of the sediment. Fissured Containing shrinkage cracks, frequently filled with fine sand or silt, usually more or less vertical. Indurated A rock or soil hardened or consolidated by pressure, cementation, or heat. Interbedded Composed of alternating beds of different soil types. Laminated Composed of thin (< 1 cm) Iayers of varying color and/or texture. Poorly graded Predominantly a single grain size, or having some intermediate sizes missing ("gap' graded). Slickensided Having previously -sheared planes of weakness that are slick and glossy in Well graded appearance. Having a wide range of grain sizes, with substantial amounts of intermediate particle sizes. FIP U O.i�I flONGWEST Sr ASSOCIATES,I C. LEGEND OF SYMBOLS USED ON EXPLORATION SOIL LOGS GRAPHIC SYMBOLS FOR SOIL TYPES I SAMPLE TYPE SYMBOLS NON -COHESIVE SOILS (<50% passing No. 200 sieve) well graded gravel and gravel/sand mix poorly graded gravel, gravel/sand mix silty gravel, gravel/sand/silt mix clayey gravel, gravel/sand/clay mix well graded sand, gravelly sand poorly graded sand, little or no fines silty sand, sand/silt mix clayey sand, sand/clay mix COHESIVE SOILS (>50% passing No. 200 sieve) inorganic silt and very fine sand inorganic, low plasticity clay organic, low plasticity clay, silt/clay mix inorganic, elastic silt, silt/sand mix inorganic, high plasticity clay organic, medium to high plasticity clay peat and other highly organic soil BOREHOLE SAMPLES ® 2.0" OD Split Spoon (SPT) IShelby Tube �i 3.0" OD Split Spoon with Brass Rings 0 Grab Sample (cuttings) Core Run TEST PIT SAMPLES Bag (bulk sample) OGrab (small volume) IShelby Tube HAND BORING SAMPLES Non-standard penetration (40 lb. hammer with 12 inch drop) OGrab Sample (post hole) IShelby Tube ROTARY BOREHOLE SAMPLES mContinuous Core Sample Note: The graphic symbols used for the various soil types are based on symbols recommended in the Unified Soil Classification System. Graphic logs are based on subjective field identi- fication of soils, and laboratory data where available. GROUNDWATER MONITORING WELL SYMBOLS �Nte Seal Backfill igs Backfill or Caved Hole meter Casing idwater Level (noted during drilling) idwater Level (measured in piezometer after water level stabilized) ed Piezometer Casing Backfill ATTERBERG LIMITS PL LL o - Natural Moisture Content PL - Plastic Limit LL - Liquid Limit Y iiil•� +IONGWEST & ASSOCIATES, INC. HONG WEST & ASSOCIATES, INC. DRILLING COMPANY: Gregory Drilling DRILLING METHOD: CME-75, 8" Hollow Stem Auger SAMPLING METHOD: SPyT� z x W- o ` x W W O W U J J c� J ¢ J OIL d M Z G > ti S .J+ s i N N DESCRIPTION o N a z r BORING LOG TOTAL DEPTH. 41.5 Feet SURFACE ELEVATION: 258 Feet MEASURING POINT EL.: Feet Medium dense, dark grayish brown, silty SAND with gravel, moist. Fine to medium grained sand. 2r minus subrounded gravel Trace to some 8` minus 313/3 8 t21 subrounded cobbles. (Fill) 2/4/4 8 14.9 : ' . fi b j o 3/5/2 7 18.5 0 tt/17/21 38 4.1 0 4/8/8 le 3.8 0 4/9/10 t9 4.1 0 71WG 27 10.8 Medium stiff, dark grayish brown SILT with sand r. and gravet, moist. Fine to medium grained sand, f minus subangular to subrounded graves. GP Dense, olive brown, poorly graded GRAVEL with sand, moist. Fine to medium sand, 1" minus subrounded gravel (Recessional Ou twash) Medium dense, fight brownish pray, poorly graded SAND, moist. Fine grained sand. Trace to some I' minus subrounded gravel Becomes more fine grained with trace to some silt. ----------------------------------- 3§ Very dense, grayish brown, poorly graded GRAVEL 21/34/27 81 4.1 with slit and sand, moist. Fine to medium grained ' sand, t.5" minus subrounded gravel Possaie trace e + to some cobbles. Mast. Cont. M l Pea Resistance (blows/foot) 0 20 40 80 80 NOTE: This log of subsurface conditions apples only at the specified location and on the date Indicated. PROJECT: First Ave. Basin BORING: SB-12 LOCATION: Panther Lake. Federal Way, WA PROJECT NUMBER: 94003 DATE COMPLETED: January 11. 1994 LOGGED BY: C. Behrens PAGE: I OF 2 r- HONG WEST 6 ASSOCIATES, INC. BORING LOG ;, Z _ N F- = f/f N .`. x W J U)m W" ? .3 V F- J 8 o U) d a z i U) vi DESCRIPTION 40 fUlU43 54 0.9 Ver dense, ra ish brown, sUty GRAVEL with Y 9 Y sand wet. Fine Qrained sand, t5" minus suDrwmded 9rawet Possible trace to some cobbles. Borehole terminated at a depth of 41.5 feet, 4 5 1/11/94. PROJECT: First Ave. Basin LOCATION: Panther Lake. Federal Way, WA DATE COMPLETED: January 11. 1994 LOGGED BY: C. Behrens • Mast. Cont. M 1 Pelt Resistance (blows/foot) 0 20 40 00 BORING: SB-12 PROJECT NUMBER: 94003 PAGE: 2 OF 2 iJ HONG WEST & ASSOCIATES, INC. r ii DRILLING COMPANY: Gregory Drilling DRILLING METHOD: CME-75, 6" Hollow Stem Auger SAMPLING METHOD: SPT x zz" i �] ' l.r 4w, u z vi O N ' v _. W W 40 W U J J ¢ a J 1.: O CU C L G > ,N., S ,J. o U) d a z z vi ai DESCRIPTION r f 0- 40 2/5/3 8 252 2/3/2 5 12.8 WAD 17 3.1 0 4/910 22 1.8 0 4/5/23 28 2.9 0 9/12/14 28 4.0 R5/9/14 23 22.1 N4/8/t2 18 24.7 BORING LOG TOTAL DEPTH: 41.5 Feet SURFACE ELEVATION: 253 Feet MEASURING POINT EL.: Feet Soft/loose, very dark grayish brown, sandy SILT/silty SAND with gravel, moist. Fine grained sand r minus subrounded gravel. Grass, roots, and glass fragments. (FdU Medium dense, light olive brown, poorly graded SAND with gravel, moist. Fine to medium grained sand r minus subrounded gravel. (Recessional Outwash) Becomes olive gray. Becomes light olive brown, sightly less gravely. Medum dense, dark grayish brown, silty SAND, wet. Very fine to fine grained sand. • Mast. Cont. M 1 Pen Resistance (blows/foot) 0 20 40 60 60 PA NOTE: This lop of subsurface conditions apples orgy at the specified location and on the date hdicated. PROJECT: First Ave. Basin BORING: SB-13 + LOCATION: Panther Lake. Federal Way, WA PROJECT NUMBER: 94003 DATE COMPLETED: January 11. 1994 LOGGED BY: C. Behrens PAGE: 1 OF 2 ri L, P L HONG WEST & ASSOCIATES, INC. BORING LOG x a cc i Q V, m J C o Z rcn Z G 3 z ►+ Z i cn "^ U) DESCRIPTION 40 4/4/0 is 22.9 Medium dense, dark grayish brown, silty SAND, wet. Very fine to fine grained sand. Borehole terminated at a depth of 41.5 feet, 1/11/94. f . PROJECT: First Ave. Basin LOCATION: Panther Lake, Federal Way, WA DATE COMPLETED: January 11, 1994 LOGGED BY: C. Behrens ■ Matt. Cont. M 1 Pen. Resistance (blows/foot) 0 N 40 W W :As BORING: SB-13 PROJECT NUMBER: 94003 PAGE: 2 OF 2 • _ _ tr' - - •Y1'•.r1-%7-�i ���'•7'.-.`r,:.:_••_:".s•" -. •ti•. - - �.w •-f.:;�t rlr• -r .',Y i']yr. - . e_i"S�', �•4i •. Y�i'�'... i�.�? :�"= = ��i--: ;': ry.�ir y'ti �� ���.: .iy0.i •:: �_'. �'^`fi: =: il+. .. - �. �. . ."ir `�:ke{��i Xy�. y4: In ,+y-p�•�� �_ •��`i . _ . "9'• Y4 _ - - '-f' .i �'. •' �4ti-i�.-:. 71 - { - - p;�;� 4' !'c,.-•ti;'_-, • +ma's .'Srs',_�^-,^ rr�' - •:r::' - _ _ y��� - .� 'y�.� may- - l •'•�.�f '--S�.a vv. - .`..ti __ ti' _ _ - _ • -... A�^f'. •irk .-. -... _ ... .:1 � 9.1 iC'ia. f'i.::�ie _�... � ... -.. __.. �._. .,_�....�..r_...,::jL. .-:$-.ay. _. .� . �.. ..�ti :.i:.a. i__ ..-..x._�.�,_ .. _.. ..c+fi''�?---= xy.•c �.::i:_a. ys:e'r:.Z�iyr r� I Ii r APPENDIX B LABORATORY TEST RESULTS r Representative samples obtained from the borings were returned to HWA's laboratory, and selected soil samples were tested to determine physical properties. This test program included in -situ moisture content and grain size analysis. Moisture Content Natural moisture contents were measured using test method ASTM D 2216-80. The results are shown on the appropriate boring logs in Appendix A. Grain Size Analysis The grain size distribution of representative soil samples was determined in general accordance with ASTM D 422. Results of these analyses are plotted and included in this appendix. Grain size distribution curves and soil classification in terms of the Unified Soil Classification System (USCS) are shown on the attached figures. r HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake — Quadrant Dam Test Hole Number: SB-12 ------------------------------------------------------- --•--------------------- Federal Way, Washington Sample Number S-4 ---------------- -........................... .----------- -----------------•--------------- Project Number: 94003 Depth: 15.0-16.5 feet ------------------------------••---------•---------•------•--------- Date Tested: 1-19-94 Sample Description: Remarks: Olive brown,__poorly graded GRAVEL Gravel: _ ____-54:1 _----------_ -----------.•----- ----- --- --- - ...----------------------- ----••------••--- with sand �GP� Sand: 42.6 ------------------------•-------- Fines:3.3 ----------------------------------------------- Clay Silt Sand Gravel Fine Medium Fine Crs� SIEVE SIZES 200 100 60 40 30 20 16 10 4 3/8 3/4 t 3/2 2 3 100 I 1 1 I I I I I I I 1 1 1 I 1 I I 1 1 90 -- - - ----_.-_--_----'---- - - J - - L - - - J - 1 - L - - - - - - - -L- I 1 I I I 1 1 I 1 1 1 I I I 80 --- - - -- I I I I I --,----r 1 I 1 I I W70 - - - - -- I 1 I I I ---+--r---1-t-r- ---- I I -i^1 _---� I I 1 - I I I S I I 1 ..J Q _ _ _ _ _ _ _ _ - -- - I 1 _ - J - - L - - - 6Q - - - - - - - - _ _ N ---------- ----- --i-� I I I H 50 I I I 1 1 Z 1 I I I 1 I I 1 1 1 W () I 1 I I I - 1 - - t - W QL_ ------ ------ I 1 1 I I --J--L---J-1 - -- I I ---I---1-1-I-- I 1 I 1 1 I 30 ------ 1 I 1 I I I 1 1 1 I 1 I I I I 1 5 I 1 I -- - - --20 _ 1 1 1 I 1 1 I 1 I I 1 1 1 1 I 1 1 1 1 1 10 --- ----- --_- 1 I 1 1 I I I I I 1 I 1 I 1 I 1 I 1 0 5 2 5 2 5 2 5 2 5 2 5 0.001 0.01 0.1 1 10 GRAIN SIZE — MILLIMETERS r r HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake — Quadrant Dam .-.--................................................... Federal- Way, Washington ---------- ------- Project Number: 94003 Date Tested: 1-19-94 -------------------------------------------- Remarks: Olive brown ,__poorly__graded SAND •---------------- ...............-with gravel----- --•- 100 90 80 w 70 J a 60 V) �- 50 z w 40 oc a- 30 20 10 0 Test Hole Number: SB-13 ................. Sample Number: S-3 ..... •.----------- Depth: 10.0-11.5 feet - —..•� Sample Description: Gravel: 40.8 Sand: 56.9 .._ .......... Fines; ... -............ 2=-- ............ —........ Clay Silt Sand Gravel Fn4 I Medium Crs• Fine Crse SIEVE SIZES enn inn an An in 715 IB In 4 3/8 3/4 1 3/2 2 3 ----- -- - - - -- - - -- - - -'-- 1 I 1 I -J--L-- I I I I 1 I J-1-L- -- I 1 I t --J-1 I I t I I I -1_1-I-- 1 I I 1 I 1 I I 1 1 -- -- -------- I I I I I I I I I I ------------------ --1--r---1-+-r- -- - -1- -+-t-I-- ----- 1 1 I I I 1 I I I I 1 _ __J__L___J_1_L_ I 1 I I I -- - - -- ------ - - - - -- ___ _ 1 I 1 1 __ i_-T- ___ I 1 I I I 1 I 1 �_T_i _ 1 1 I -_^ I I -- i_i __7_1_1__ I I I I I I I 1 -- - -- -- ------------ ---- -- 1 I --1--r- I I -1-+ r- - - -- I I ---1---t-+-i-- I I I 1 I 1 I I I I I I I t I I I - - - - _ _ I I - _ J _ _ L _ _ I I I _ _ 1 _ L _ - - - - - _____ - - - ^ - - - ^ 1 I I I I I I I I I 1 1 1 I 1 I 1 I 1 1 1 1 1 I I - I 1 I I ! -- - -- 1--I- I 1 1 I I I I 1 I 1 I I 1 I I lit t I I 1 I 1 I 1 I I _____ _-_______--------- --y__ 1 I I t I I I I I 1 I I t I I I 1 I 5 2 5 2 S 2 5 2 5 2 5 0.001 0.01 0.1 1 10 GRAIN SIZE — MILLIMETERS •1 , t N . •r o •*oy=' 4Yrj{ '�E� fr fir: ;1.'[tiy �` 5 APPENDIX C PREVIOUS TEST PIT AND BORING LOGS On May 6 and 9, 1993, HWA personnel monitored the excavation of eight test pits and six borings within the Panther Lake project site area Two of the six borings and five of the eight test pits lie in the vicinity of the Quadrant Western Securities project site, as shown on Figure 1. Test pits and borings were logged in the field by HWA geologists. Representative samples were obtained, placed in air tight containers and returned to the HWA laboratory for further testing. Logs are included in this appendix. Laboratory test results are presented in Appendix D. r^ HONG WEST & ASSOCIATES, INC. WELL LOG DRILLING COMPANY: Gregory Drilling TOTAL DEPTH: 41.5 Feet DRILLING METHOD: Hollow Stem Auger 4.0" I.D. SURFACE ELEVATION: Feet SAMPLING METHOD: SPT 2.0" O.O.: Dames 6 Moore 3.0" O.D. MEASURING POINT EL.: 251.0 Feet U w q L .2 a! ~ v7 to O N `- W W m j U J J d Z 2!> .N-i S J ui o (n a z i in ch DESCRIPTION -- li onument Cover u Brown, poorly graded SAND with silt and gravel, moist. Possible cobbles. (Fill) 5 I I 31 ----------------------------------. ' Very loose, dark brown, silty SAND with gravel, moist. Some black organic material, and wood ° fragments. (Fill) Drilling more difficult at 8.5'. I « 5-a-lo >8 3 Medium dense, gray, poorly graded GRAVEL with sand, damp. Trace silt, fine gravel, possible cobbles. i (Recessional Outwash) Thin, 1-2" layer, organic material in sample interval s 5-10-15 ";• at IT. 5-7-8 15 3 " Medium dense, brown, poorly graded SAND with- 20 5-10-9 21 11 gravel, moist. Trace silt, medium to coarse sand, t fine gravel co 9-15-6 33 21 r �u 1 7-6-t2 5-8-0 0 22 35 5-7-13 20 22 r i Medium dense to dense, light brown, silty SAND, moist. Interbedded sand and silt. (Lacustrine) (Description next page) ntonite >er Grout ca Sand tted PVC I . NOTE: This log of subsurface conditions applies only at the specified location and on the date Indicated. r PROJECT: Panther Lake WELL: SB-10 i ' LOCATION: Panther Lake, Federal Way, WA. PROJECT NUMBER: 91147; Task 2 DATE COMPLETED: 5/8/93 LOGGED BY: R.E. Long PAGE: I OF 2 HONG WEST & ASSOCIATES, INC. WELL LOG V F- N � F- ... W W p U J �ylf J Cc > N S J d o Z vi Z O d Lu a z i cn ai DESCRIPTION 40 Very Stiff, light brown, sandy SILT, wet. Few fine B-10-11 21 23 gravels, in silt and silty sand, sat appears laminated, sand beds are poorly graded fine sand ENO OF BORING AT 4L5 FEET PROJECT: Panther Lake LOCATION: Panther Lake, Federal Way, WA. DATE COMPLETED: 5/8/93 LOGGED BY: R.E. Long F' I:rjL•1 WELL: SB-10 PROJECT NUMBER: 91147; Task 2 PAGE: 2 OF 2 r-� rl HONG WEST & ASSOCIATES, INC. WELL LOG DRILLING COMPANY: Gregory Drilling TOTAL DEPTH: 43 Feet DRILLING METHOD: Hollow Stem Auger 4.0" I.D. SURFACE ELEVATION: Feet SAMPLING METHOD: SPT 2.0" O.D.; Dames & Moore 3.0" O.D. MEASURING POINT EL- 253.3 Feet uj c) in z in = K 4 07 ~ Z N ^ C N rn W m W U = W N O U d S Z G > .N+ S "J+ o W a s z i ai Cn DESCRIPTION — Qnumerrt Cover Loose, dark brown, silty SAND with gravel, moist. Some black organic material, and wood fragments. (Fill) 3-2-2 4 18 DrWing more difficult at 8'. r L� 9-9-9 1T r' A b-12-is 6-10-13 23 2 Medium dense, gray, poorly graded SAND with gravel, damp. Trace silt, fine gravel, possible cobbles to 8"-. No return from 3.0" split spoon sampler at 15. (Recessional Ou tw ash?) 9-10-12 22 IB _ Dense to medium dense, brown, silty SAND, wet. Interbedded fine sand and laminated silt. (Lacustrne) 0 5-7-10 17 25 5-6-20 --35 24 0 5-7-17 24 22 NOTE: This log of subsurface condltlons apples only at the specified location and on the date Indicated. PROJECT: Panther Lake WELL: SB- i 1 ntonite ;er Grout ica Sand fitted PVC LOCATION: Panther Lake, Federal Way, WA. PROJECT NUMBER: 91147; Task 2 DATE COMPLETED: 5/9/93 LOGGED BY: R.E. Long PAGE: 1 OF 2 HONG WEST & ASSOCIATES, INC. WELL LOG ui U 7 Z ` r+ go,N Z N O ? C 1 J = W J W = J F O G1 d S Z 0 > .. Z ` Wo N d a z i N N DESCRIPTION 40— 1 11-13-17 As above. ENO OF BORING AT 43 FEET r c PROJECT: Panther Lake l_: LOCATION: Panther Lake, Federal Way, WA. i DATE COMPLETED: 5/9/93 LOGGED BY: R.E. Long WELL: SB-1 i PROJECT NUMBER: 91147: Task 2 PAGE: 2 OF 2 kJ F" r HONG WEST & ASSOCIATES, INC . TEST PIT LOG EXCAVATION COMPANY: J. Briere Construction. Inc. TOTAL DEPTH: 9.7 Feet EXCAVATION METHOD• John Deere 410D 4WD Backhoe SURFACE ELEVATION: 1280 Feet SAMPLING METHOD: Grab K v o N WJ O L) H LLS c 6. N N z m J N N DESCRIPTION 0—GM Dense, brown gray, silty GRAVEL with sand: some openwork gravel lenses: approx. 5% cobbles to t2' minus; scattered lenses O of very silty gravel; clasts subangvlar to subrounded; moist. (Glacial Drift) O 7A f' d '. O 13 I� O I ....................................................................................... Stiff, gray, laminated, clayey SILT G sandy SILT with gravel ; moist. Bottom of Pit @ 9.7 feet. No water encountered. + Mast. Cont. M PL Plastic Limit LL Liquid Limit 0 20 40 60 90 NOTE: This log of subsurface condltions applies oNy at the specilled location and on the date indicated. PROJECT: Panther Lake TEST PIT: TP-18 LOCATION: Federal Way, Washington PROJECT NUMBER: 91147-2 DATE COMPLETED: 5/6/93 LOGGED BY: Rod Faubion PAGE: 1 OF 1 n r' HONG WEST & ASSOCIATES, INC. EXCAVATION COMPANY: J. Briere' Construction, Inc. EXCAVATION METHOD: John Deere 410D 4WD Backhoe SAMPLING METHOD: Grab N o N ... N V J J V d N ca J o 0i u i W 0 DESCRIPTION TEST PIT LOG TOTAL DEPTH: 8.5 Feet SURFACE ELEVATION. *250 Feet Loose, brown, gravelly SAND: some silt; numerous fine roots; moist. (Fill) Buried TOPSOIL with wood G decayed organics; numerous fine to coarse roots; moist. Medium dense to dense, mottled to gray below 3 ft., poorly graded GRAVEL with silt and sand; clasts to 8" minus, mostly 3' minus, subangular to subrounded; roots to 3.6 ft, none below; moist. (Glacial Drift) Bottom of Pit & 8.5 feet. No water encountered • Moist. Cont. M PL Plastic Limit LL Ligtid Limit 0 20 40 60 80 NOTE: This loft of subsurface conditions applies only at the specified location and on the date Indicated. PROJECT: Panther Lake TEST PIT: TP-19 LOCATION: Federal Way, Washington DATE COMPLETED: 5/e/93 LOGGED BY: Rod Faubion PROJECT NUMBER: 91147-2 PAGE: 1 OF 1 t, r HONG WEST & ASSOCIATES, INC. EXCAVATION COMPANY: J. Briere Construction, Inc. EXCAVATION METHOD: John Deere 4100 4WD Backhoe SAMPLING METHOD: Grab K N w o N U1 W L) J J N O '� U J o S 0 i fn ch DESCRIPTION 4 r- B 8 - P r TEST PIT LOG TOTAL DEPTH: 7.0 Feet SURFACE ELEVATION: *250 Feet -..• 2" of TOPSOIL over loose, fight Drown, sandy GRAVEL: w/some silt: numerous roots: moist. Very dense, gray, poorly graded GRAVEL with silt and sand: few fine roots in upper 2 ft.; scattered 4-6" thick lenses of sandy gravel G fine to medium sand exposed thoughout pit walls; moist. (Glacial Drift) Bottom of Pit 0 7.0 feet. No Plater Encountered. • Mast. Cont. (%) PL Plastic UWt LL tagtad twit 0 20 40 60 80 • i NOTE: This loft of subsurface conditions apples only at the specil[ed location and on the date Indicated. PROJECT: Panther Lake TEST PIT: TP-20 LOCATION: Federal Way, Washington DATE COMPLETED: 5/8/93 LOGGED BY: Rod Faubion PROJECT NUMBER: 91147-2 PAGE: 1 OF I HONG WEST & ASSOCIATES, INC. EXCAVATION COMPANY: J. Brlere Construction, Inc. EXCAVATION METHOD: John Deere 41OD 4WD Backhoe r-- SAMPLING METHOD: Grab N n � OCn to y... W L) J J O U CL a s N co S J c N i N N DESCRIPTION r F TEST PIT LOG TOTAL DEPTH: 8.2 Feet SURFACE ELEVATION: t273 Feet 4" of Forest Duff over loose, brown, silty SAND: w/some gravel to 4" minus; numerous roots: Moist. (Topsoil) Loose, brown gray to olive gray. gravelly SAND with silt: numerous roots: moist. (Recessional Outwash) Medium dense. light brown. poorly graded SAND with silt: grades with depth to poorly graded SAND with silt and gravel; rounded to well rounded gravel to 8" minus. (Glacial Drift) Bottom of Pit & 6.2 feel. No water encounterea. a hoist. Cont. M Pl. Plastic limit LL Ugtad Limit 0 20 40 60 80 T " . NOTE: This top of subsurface conditions apples only at the specified location and on the date Indicated. t PROJECT: Panther Lake TEST PIT: TP-22 t ' LOCATION: Federal Way, Washington PROJECT NUMBER: 91147-2 DATE COMPLETED: 5/6/93 LOGGED BY: Rod Faubion PAGE: 1 OF 1 2 H d W 0 r HONG WEST & ASSOCIATES, INC. EXCAVATION COMPANY: J. Brlere Construction, Inc. EXCAVATION METHOD. John Deere 4100 4WD Backhoe SAMPLING METHOD: Grab c) N z vi Z N N Q J J .W� ►- Co O C� U) Z N (n DESCRIPTION 4.3 7.8 TEST PIT LOG TOTAL DEPTH: 6.1 Feet SURFACE ELEVATION: :275 Feet XT 3" of Forest Duff over loose, brown, silty SAND: w/some gravel to 4" minus: numerous roots; moist. (Topsoil) Medium dense, light brown, fine to medium SAND: some silt: trace rounded to well rounded gravel to 8". (Recessional Outwash) SM Very dense, gray, silty SAND with gravel: approx. 5% cobbles to 12" minus; scattered lenses of very silty gravek clasts subangular to subrounded: moist. (Glacial Drift) Bottom of Pit & 8.1 feet. No water encountered • Mast. Cont. M Pl. Plastic l.iM u Uq id LIM 0 20 40 80 80 NOTE. This log of subsurface conditions applies orgy at the specified location and on the date Indicated. PROJECT: Panther Lake LOCATION: Federal Way. Washington DATE COMPLETED. 5/13/93 LOGGED BY: Rod Faubion TEST PIT: TP-23 PROJECT NUMBER: 91147-2 PAGE: 1 OF I oi: APPENDIX D PREVIOUS LABORATORY TEST RESULTS Laboratory tests were performed during the previous geotechnical investigation. In addition to moisture content and grain size analysis, tests for direct shear and moisture -density relationships were performed Results are included in this appendix. Direct Shear Tests Direct Shear Tests were conducted on selected soil samples, remolded to a density and moisture anticipated to be similar to the field condition of compacted embankment fill soils. The test procedure was in general conformance with ASTM D 3080. Density -Moisture Relationships Density -moisture relationships of selected samples from the potential borrow area were determined using Modified Proctor compaction tests. The test procedure was in general conformance with ASTM D 1557. 41 91 L I I L V r HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake ............ -..... -- Test Hole Number: SS-10 .... -------------- ----- ..... ..................... ........... Federal Way, Washington Sample Number: ....S-2 .. _.�---------- . . ............................. Project ----------..........---•--------- ------- Number: 91147-2 - ------------------ --------------------------------------- ___- Depth: 10-11 5 feet Date Tested: 5-14-93 _.......... ..............--------------- ..................... _ Sample Description: Grgraded. GRAVEL Remarks: ay, with sand SGP�- Gravel: 52.4 .................. -- --poorly, Sand: 45.1 -------------•---•--------------------------.-. -.-....--------------------...-.._...--•------...... ........... . Silt: ---------------- 2=5------------------------ _._....... _._._.r--......................... -........... . Clay: . ........... Clay Silt Sand Gravel Fine I Medium Crs• Fine Cn• SIEVE SIZES 200 100 60 40 30 20 16 10 4 3/8 3/4 1 3/2 2 3 100 I I I 1 I I 1 1 1 I 90 -__-^-- - - - - --- - - - I I 1 1 1 - -- - L - -- J -L -L - ---- 1 I 1 I I ---I---1-1-I-- I I I I I I I 1 1 I I I I 1 80 I 1 I 1 I -- -- ---- I i 1 I I -- i I----T-,- 1 W70 _..._.-.-- ----- -- ---- - 1 1 I 1 1 --- ---- i--t-__i-t--- -- I I 1 I I -- - -rt I---t-t-I-- I I I 1 1 -J -J Q 6 I I 1 1 I 1 1 1 1 I --- J--L---J-1-L- - I 1 I 1 -- -- -1---1-1-1-- I I I 1 I 1 1 I 1 I V) 1 1= I 1 1 I 1 1 I 1 I I 1 I I I I �- 50 - - - - -- ---------_ _ I I 1 ----- -- i--i --- i-T-i - ---- --�-i -i-T-1 - Z 1 1 1 I 1 1 I I I I IyJ U40 •---- - ------------- - 1 1 1 1 I - - - ----1 1 1 I I I --- t -t -I- - I I I 1 I 1 1 1 I 1 W I I I 1 I 1 1 I I I EL - - - - - - - - - - - - - --�- - - - 30 --J--L---J-1-L- - - - - - _ , - --1-1--_1-1-1-- I I I 1 1 f I I I I I 1 1 1 i I I I I I 20------` ----------'----- ; - _- I 1 I I I -- -- �-1 - 1 I 1 I 1 I I 1 10 r----------------------- 1 1 1 1 ----t--- ti-r-r- -- I 1 I I I ----I---t-�-r- I 1 I 1 I I 1 1 I 0 S 2 S 2 5 2 5 2 S 2 s 0.001 0.01 0.1 1 10 GRAIN SIZE - MILLIMETRES HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake Test Hole Number: TP-18 ...-.------------ -- - - ----------------------- ......-_...----------.......................... Federal Way, Washington --------- Sample Number: ---............... - S-1 t0 5 .... ------------- Project -....... --...... ----------- ---........ _.... ----•------ Number: 91147-2 D.... Composite----...----------------..... ............... Date Tested: 5-14-93 ------------------- ---..--------------- Sample Description: ------------------- .------ ---------- Remarks: Gray: silty GRAVEL with sand (qs ).__••__ Gravel: 48.8 Sand: 34.3 ..... •----......... -...... ....... ------------- -- Silt' --------------- � 6­ =g------------------------ _.._._.._-._._._.- .._....------------ ....................-... -------------- --------..._...----------- ------....._._ Clay: _-------------------------------------------- Clay Silt Sand Gravel rn. Medium crs• Fine crse SIEVE SIZES 200 100 60 40 30 20 16 10 4 3/9 3/4 1 3/2 2 3 100 I I I I 1 I 1 I I I I I I I I I i I I I 90 - - - - - - - - - - - - " - - - - - - - --J L---J-1-L• - 1 --- --1-I---1-1-1-- I I I I I 1 I 1 I I 1 I I 1 I 1 I I 1 1 I I I 1 I I I I I 80 ------ ----------------- 1 I I 1 I -------- 1 I I 1 w 70 - - - - -- ----------- - -- - - -_ I I -----r---1-r--- I I 1 - - -- I - -- 1---t-*-I-- I I 1 J J 1 I I I I 1 1 I 1 I Q 60 ------ -------------- - ----�- - �-�-� - ---- -- -1---1-1-1-- I 1 1 I I 1 1 I I I V) I 1 l I I I 1 1 1 I 1 I I 50 - - - - -- ----------- - - - - -- 1 I -- ;------1—T-,-- --- -- ;-,---T-;-,-- Z I 1 I I I I 1 I I I V-- 40 ---- ---`---- - -- - - -' - - - ---- --r- - -1-r - - `- - - - --f -I--- t-t-I-- � , 1 I I 1 1 1 W 1 I I I I I I I I I EL 30 - -J- -L 1 1 I -J-1-L - I I I I I 1 --1-�- I I 1 I -1-1-1-- I I I 1 1 1 20 - ---- ------------------- 1 __---- -- I I I 1 I -- I I 1 I 1 ---- 1 1 ------------- I 1 1 I 1 I I I I 1 I 1 1 10 - - - - -- ------------ - - - - -- ---I--r---r-r- I I I I I --- ---r--rt-* I I I I I-- I 1 I 1 1 1 0 1 1 1 I I I I S 2 6 2 S 2 s : 5 2 S 0.001 0.01 0.1 1 10 GRAIN SIZE — MILLIMETRES HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake Federal Way, Washington -------------------- ------- ------------...... Project Number: 91147-2 Date Tested: 5-14-93 Remarks: - Graff, -poorly-graded--SAND --with 100 90 80 w 70 J J 60 N Z 50 W 40 UJ a_ 30 20 10 0 Test Hole Number: S8-11 ------------------------------ Sample Number: S-5 --------------------------------- Depth: 16.5-18 feet ---------------------------------------....-------- Sample Description: Gravel: 33.9 Sand: 62.8 Silt: Clay - --------------------------------------------- Clay Silt Sand Gravel FineMedium crs• Fin• I cn• SIEVE SIZES .3m inn Rn An to 7n 1e 10 4 3/8 3/4 1 3/2 2 3 I 1 I 1 I 1 I I I I 1 1 1 1 1 1 I 1 1 -- - - -- ---- -------- - - - - -- - --J L---J- L-I-- ---- --1 I---1-1-I-- 1 I 1 1 I I I I 1 I I 1 1 1 1 i I I 1 1 -- �-r-r- - -- -- �-� I T-I I 1 1 I 1 I I I 1 1 •-_ --- ---------- - - - - -- --1--r---1-t--- - -•-- --1-r--t-t-I-- I 1 1 1 1 1 1 1 I 1 I 1 I I 1 I 1 1 1 1 - - - - - - - - - - - - - - - - - - - - - - - - - I I I 1 1 1 I I I 1 I I I I 1 I 1 I I 1 I 1 1 I 1 1 I I I I I I I I 1 I I I I 1 1 I I 1 1 I 1 I I I -- - - -- ----------- - - - - -- ---1--r---i-t-r I I I I I _-- ---I---t-t-1-- I 1 I I I ------- ----------------- I 1 --J--L---J- I I -L- -- - 1 I --1-I---1-1-I-- I I I 1 I 1 1 I I 1 I I 1 I I I 1 I 1 I 1 1 I 1 I 1 I - - - - - - - - - - - - ^ - - - - - - - - - - I I - - 1 1 1-1-7-7 - - - - 1 1 I I 1 1 I I 1 I I 1 I 1 I 1 I I I I I - - - - - - - - `• - - - - --" - - _ _ - - - - - - - i i 1 I 1 I I I 1 I 1 I I 1 1 1 I I I I s 2 s 2 s 2 S 2 S 2 s 0.001 0.01 0.1 1 10 GRAIN SIZE - MILLIMETRES r F' fr HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake Test Hole Number: TP-19 ---- ... ---- ••-----•---------------------------------------------I-----.....----------- Federal Way, Washington Sample Number: 8_1 - - Project Number: 91147-2 --------------------------•-------------------- -••-................ Depth: 7.5-8.5 Date Tested: 5-14-93 Sample Description: Remarks: GraY.-poorlx graded GRAVEL with silt Gravel: __55.5 _--.............. _ and sand (GP —GM) .... Sand: - - 34.2 ________________ •--•--------•---. - Silt• ............................................... 10.3 ---------------•----------------------....---------------------•- Clay: --------------------------------------------- Clay Silt Sand Gravel Fine Medium Cris ring Crsg SIEVE SIZES 200 100 60 40 30 20 16 10 4 3/8 3/4 1 3/2 2 3 100 7ZI 1 I I I I I I I I 90 - - - - ------ ------- • -- --- -- - - - J - - L - - - J - 1 - - - -- - - - - - - I I I 1 I I 1 I 80 -- --- --- ---- ---- I I 1 I 1 -----i --r- - ;—T -,-- ---- 1 I I I I ---,--^T T—,--I I 1 I I 1 1 1 I I OC 70 ----------------------- 1 1 I 1 I ---I--r-- 1-14r- --- I I I 1 I --+-I--+-+-1-- 1 I I W 1 I 1 I I I J J Q 60---- I 1 I I I _ __-- I 1 I 1 __1 1 I 1 I 1 I i I 1 I V7 1 I I 1 I 1 I I I 1- 1 I 1 I 1 Z I I 1 I 1 1 I I I I LAJ V 40 ---------------------- I 1 1 I I -----t---1-r-r- - - --i-1---+-+-h- � ,.,-, a_ 30 -------------- ------ _J1 I I I I I I 1 1 I 20 I I 1 1 1 - ---- I I I I I I I I I I- -- ;-,---T-T -,- I I I I I - ---- ^----- ----------- 10 I 1 I 1 --1--r---1—r—r— --`- 1 I I I 1 --1-I---—Y-I-- 1 I I I I 1 1 I I 3 0 s x s x s z s z s x s 0.001 0.01 0.1 1 10 GRAIN SIZE — MILLIMETRES �1 i HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake Test Hole Number: TP-20 -- --- -- •---------------•----------------------- Federal Way, Washington Sample Number: S-1 ---------- -- ----------- .....------••--•-••---..------------- Project Number: .91147-2 .--------•-----------•------._...........................--•------- Depth: 3.0-4.5 Date Tested: 5-14-93 ---------------_-._-._ Sample Description: - --•--------•-------•- -- -- - Remarks: Gray, poorly --graded GRAVEL with ------------I ................. silt Gravel: 58.5 _•. ----------- sand (GP-GM�..... ...........-.---•---.--•--- Sand:------------32=8 - - - - ............ -and -...... -------- -- Silt: ---------------- 8:9------------------------ - Clay- --------------------------------------------- Clay Silt Sand Gravel nn• Medium I Crs� nn@ Crse SIEVE SIZES 200 100 60 40 30 20 16 10 4 3/8 34 1 3/2 2 3 1 OQ I I 1 1 1 1 I 1 I I 1 I I I I 1 1 I 1 i 90 - - - - -- --- ----- -- - - -- -- --_J L---J-1-L 1 I I I I - - --1-1- 1 I -1-1- - I 1 I 1 I I 1 1 1 I 1 r I 80 - - - - -- ------------ ------ -- i--1-----T-i 1 I _ I 1 I ---- ---�-; --T- 1 I - I I I W 70 --1--r- -1-t-r- ---- --+-1--- -+-I-- 1 I I 1 I I I 1 J Q 60 - - - - - - - - - - - - - - - - - - - -_- - - I 1 --J--L---J-1-L - ---- --1-I --1-1-T-- 1 I I I I I N 1 I I 1 I I 1 1 50 ------ I I I 1 - ---- -- -;--;-T-; I - I 1 1 Z I 1 I I I 1 I I LILJ U 40 ----- ---� � -- -- -- ------ I I --1--r- I 1 1 --I-t-1-- --- 1 1 --i-1---+-+-1-- I I I 1 I I � 1 I I I 1 W D_ 30 ----• --__----------- I I --J--L_---T-1 I I I 1 I - I I I --- I I --1-I__-1-1-I-- 1 I 1 I 1 I I 1 1 I I 1 I I 1 I 1 1 1 1 20 --_--1 _- --- - -- 1Q ------ ---•--- -----^y- - --- t-r- �-- --1-I-- +-t-I-- I I I I I I 1 1 1 I I 1 I I 1 1 I 1 1 1 Q S 2 S 2 S 2 S 2 S 2 S 0.001 0.01 0.1 > 10 GRAIN SIZE — MILLIMETRES HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION Project: Panther Lake Federal Way, Washington Project Number: 91147-2 Date Tested: 5-14-93 --------------------------------------- --....... ---..................... Remarks: - Grate silty -SAND- with -•ravel -�SM� 100 90 80 w 70 J J a 60 (N 50 z W c) 40 a- 30 20 10 0 Test Hole Number: TP-23 -------- Sample Number: S-2 --------------- Depth: 5.0-6.0 Sample Description: Gravel: 36.8 Sand: - - - 44:9- - - -- ---- ..... Silt: 18.3..__. Clay - -------------------------------------------- Clay Silt Sand Gravel Fine I M.dium Crs� Fin• Crse SIEVE SIZES inn inn 6n An 30 20 16 10 4 318 3/4 1 3/2 2 3 1 I I 1 1 I I I I I I I 1 I 1 I I 1 1 I ------ - --J--L---J-1-�-^ --- --J-1--- 1-1-- I I I I 1 I i 1 1 I I I 1 I I 1 I I 1 I I I I I 1 I 1 1 1 I 1 I I I I I I I -- - - -- -------- --- - - - - -- --- t-t-1-- 1 I I I I 1 I I 1 1 I I I I I I 1 I I I ___-_- -----_____-_ --J _L---J_1_l._1_I__ 1 I I I I I I I 1 I -- - - -- ----------- --- - -- I I -- - --r-- 1 I 1 �-T- ---- I I -- �-,---?- I I I i-� - I I I 1 I i 1 I I a I I 1 i I I I - I 1 1 I I I I I I 1 I I I I 1 I 1 1 I I --J--`-J-L-1-- ---- --J-I---1^1-I-- ------ --------^-------- I I I I 1 I 1 I I 1 I I I I I I I I I I I 1 I 1 I 1 I 1 I 1 I •1 I I 1 I 1 1 I I 1 I I - --- - - ----•------ ------- --ti--t-- - ti-t- -- - - - - --y-1--'-t_t_I__ I 1 1 I 1 1 1 I I 1 I -FT I 1 I I 1 I 1 I I I I S 2 S 2 S 2 S I 5 2 3 0.001 0.01 0.1 1 10 GRAIN SIZE — MILLIMETRES HONG ,WEST & ASSOCIATES, iNC. DIRECT SHEAR TEST RESULTS Project: Panther Lake Test No. Location:_ gderal- W;,y_. Washington Boring: TP-19 B-1 Project Number. 91142-2 Depth (ft.): 2 , 5-R _ 5 PPt' _ Date Tested:. 5-13-93 - Diameter (in.): 2. 416" I I 1 I I I I 2000 w I I I I I I I I I I I i I 1 N N W N 1500 I I W LH h 1000 1 1 1 I I I I f { 500 I l I I I +F I I 0 II I-H4 0 500 Average Dry Density (pcf):1?4. Average Water Content X Friction Angle (degrees): Apparent Cohesion (psf): I 1000 1500 •2000 2500 NORMAL STRESS (psf) 2 Sample Description: Cray, =rlv-=dam - GRAVEL with silt and sand (QP- 28 Liquid Limits: = n/a 2nn Plastic Limits' = n./;% SM-Ss-ILkR a f,JNG WEST & ASSOCIATE,"') • Goolechnical Engineering • Hy >gy . Materials Testing •. Construction Inspection • COMPACTION TEST RESULTS Project: Panther Lake 1345 Sample Number. Address: Federal Way, Washington Sample Location: TP-19. B-1 Sample Description: �Yr Poorly graded Job Number. 91147-2 GRAVEL with silt and sand (GP -GM) Date Tested: 5-15-93 By: SDG Client: Brown and Caldwell Attention: 14o r 1 0 r lTinllll!'IM:1:7Cstlrerrrrrwrrs�......... 0o 85 Maximum Dry Density: 138.5 PCF Optimum Moisture Content: 7.5 % Natural Moisture Content: 4.7 % Compaction Standard: — ASPM D1557 Hammer Weight: 10 lbs. Hammer Drop: 18 ins. No. of layers: 5 Number of blows/layer. 56 Diameter of mold: 6 ins. Height of mold: 4.584 ins. Volume of mold: 0.075 cult.. Surcharge Weight: lbs. Vibratory Amplitude: ins. Vibratory Frequency: vibJmin. Vibratory Time: min. Compactive Effort: ftlbsJcu.ft. so fli[ fl If 0 s 10 is 20 2s •30 35 40 Moisture Content — Ali All 163U DOHOrMOd In •MrM­ ..46N Arr.. QFIGUREYLS e+�klwi' V Study Tributaries Subbasln Q100 (cfs) Area (ac) A+C 15 84. D'+E' 2.6 14. F' 3.1 111 Total 20.71 110. Total Discharge Under SW Campus Drive 'Denotes undetained area. Note: Available capacity under SW Campus Drive Is 92 cfs provided by 30' and 36' culverts. Undetained Flows from Areas E,F,&D Inflows from Areas A and C New Quadrant pond Discharge under SW Campus Drive Page 1 a m d- O O Pant her Lake s CA(7A OR E S 34 aw cam FIRST AVE DRAIN GE BASIN � WESTERN SECURITIES SIZE W"t 06/06/1993 13:45 FROM MILLIS CLARK TO 96614024 P.03 XGREEMENT TO GRANT AN EASEMENT FOR CONSTRUCTION AND MAINTENANCE OF STORMWATER DETENTION FACILITXES AND TO ESTABLISH STORMWATER STANDARDS APPLICABLE TO THE DEVELOPMENT OF CERTAIN PROPERTY WITHIN T;111 CITY OF FEDERAL WAY THIS AGREEMENT is entered into as of this day of August, 1993 by and between Quadrant Corporation, a Washington corporations ("Quadrant") and the City of Federal way, Washington, a non --charter optional municipal code city incorporated under the state of Washington (the "City"). RECITALS Quadrant and the City are parties to a Concomitant Zoning Agreement, dated the 24th day of July, 1990, governing the development of certain property owned by quadrant (the "Quadrant Property") within the City more fully described in Exhibit A_ Paragraph 2(K) of the Concomitant Zoning Agreement requires that the Quadrant Property be developed only after approval of a Master Site Plan for the property by the City. A critical element of that Master Site Flan is the provision of appropriate water quality treatment, retention, and do-tetition of stormwater from the Quadrant Property. The City has planned for stormwator detention facilities that require the construction . of two darRa. The first (the ItUpper Dam"), is located generally to the north and west of property owned by the Federal Way Littla League, a< Washington non-profit corporation (the "Lit -tic Lcaguen). Tho eecond (the "Lawor Dam"), is located in the northeastern corner of the Little League's property. Paragraph 2(F) of the Concomitant Zoning Agreement requir" Quadrant to grant a recreational easement (the "Recreational Easement") to the City over a portion -of its property. This Agreement is not intended to modify Quad,` emt' a obligations to convey the Recreational Easement to the City or to obtain Knoter site Plan approval from the City before developing the Quadrant property as required by the Concomitant Zoning Agreement. I 08/06/1993 14:07 FROM HILLIS CLARK TO 96614024 P.02 Quadrant and the City wish to enter into an agreement that will allow the City to address public ctormwatar issues and that will provide the standards and criteria necoaaary for Quadrant to complete the design of its stormwator treatment, retention, and detention facilities serving the Quadrant Property in conjunction and cooperation with tha City. NOW, THEREFORE, quadrant and the City agree as follows: 1_ Get of EasQ=aDt "or construction and Dperation of e Unnear-Quadrant shall grant to the City an easement providing for the construction, maintenance and operation of the City's planned stormwater detention facilities on a portion of the Quadrant Property (the "Uppar Dam Easementiv) . Quadrant shall use its bast efforts to insure that this easement is conveyed to tha City in a timely manner to allow the City to proceed with its construction as scheduled. Quadrant shall also grant to the City a temporary access easement ('Construction. and Access Easamant+l) over a portion of the Quadrant Property to provide for the construction of the stormwater detention facilities referred to in this paragraph and to provide access acrosr, the Quadrant Property for construction vehicles. 2. Conveyance of Stormwt_Deter�tiori__ Faci,�,itY to the City_ Quadrant is in the prccxaas of planning for a stormwater retention and detention facility to serve the Quadrant Property and soma adjacent areas (soma of which are owned by the City). That facility would be locsatad adjacent to the Lower Date on property owned by tha Little Lague. Upon completion of the* stormwater retention and detention facility, Quadrant's interest in the proparty on which that st*rmwater retention and detention facility in located and the facility shall be conveyed to the City and tha City shall undertake -zaintenance of that facility. 3. G-tox7nw.ater _netentivn S-a.ndards-for ❑eevelavment of the ORkAdrant Prapetty. The City agrees that the stormwater design standards attached as Exhibit B to this agreement will govern the development of the Quadrant Property at the time that the City reviews a proposed Master. Site Flan for the Quadrant Property. To the extent that these standards require further refinement and additional information, Quadrant and the City agree to use their best efforts -and to proceed administratively in good faith to develop and to agree on final stormwater detention standards for the Quadrant Property and to complete that task within thirty (30) days from tiae date of this Agreement. 2 - 08/06/1993 13:46 FROM HILLIS CLARK TO 96614024 P.05 4. Dire or+► o to quadrant oa Conditioned upon btaining appropriate nuthoriEation from the owners of the property, the City shah, allow the overflow of �tvrrnwmter from the Lower Dam onto adjacent property now owned by the Little be -ague during any storm event that results inrun-offrr execuding the design flow ns describod in paragraph [ nay o£ Exhibit B. This obligation on the part of the City is subject to Quadxr&nt"s abtdining the required permits and approvals for this overflow, including tkte Department Of EcOlo y dam safety and approval. Qtadrant shall. be sully responsible fur the design carstructvn of the overflow and the cost thereof. 5. Grant of Ease nt to the >edera Wa Little Lea ue. At Quadrants request the city shall Consent to the grant of an access easement over the Recreation Easement area, to be granted ty Q-aadrant to the City pursuant to paragraph [:a)(1v) of the T on�comlitant Zoning Agreement, for the benefit of the Little League; provided, however, that this access easement shall in no way interfere with, prevent full enjoyment of, or limit the scope or purpose of the Upper Dam Easement, 6. o it The parties each represent and Warrant that they have full power and actual authority to enter into this Agreement and to carry out ali actions required of them by this Agreement. Al persons executing this Agreement in represent representative capacities and warrant that they have full power and authority to bind their respective corporations, partnerships and/or marital Gormu.nities. 7. v This Agreement shall be interpreted and enforced according to Washington. the substantive laws of the State of �•ILODsent to .jurisdiction and i7en�xe. All parties shall submit and not object to jurisdiction and venue in the KingCounty Superior Court, state of Washington, in connection with any claims arising Out of this Agreement. 9. Sindinc,Effect Assignabxzzty. This Agreement, including the documents executed pursuant to the Exhibits hereto, shall. bind and inure to the benefit of the parties hereto and their respective heirs, legatees receivers, trustees, , representatives, st�cCesso]rs, transferee; and assigns. 10. ttorne sr Fees. In the event either- party defaults in the performance of any terms of this Agreement Or either proserty seeks enforcement of this action through legal and expensegs, each party shall, pay its own attorneys, fees, costs and expenses. - 3 .. 08/06/1593 13;46 FROM HILLIS CLARK TO 96614024 P.06 11. Cr�o anon in cation of nocu a ts. The p agree properly and promptly to execute and deliver any and additional documents that may be necessary to render this Agreement legally and practically effective, This paragraph shall not require the execution of any document that expands, alters or in any way changes the terms of this Agreement, 12. d' s Not Gontro n . The paragraph headings -included herein are for reference only and are not a part of this Agreement. The headings shall not control or alter the meaning of this Agreement as set forth in the teXt. 13. in thito s Agreement are incorPOI-ated herein by�this sreference as if fully set forth here. 14- Waiy. A waiver of any Provision of this Agreement shall Operate as a waiver only for the specific occa,ion as to which the waiver is given, and the provisions of this Agreement shall otherwise continue to be fully effective and operable as to any other occasion or occasions. 15_ Timp c he Essence regard to ._ Time niz Agreen�ent_ is of the essence With Osm�nt. This Agreementjconstitutes theects. This entire agreement of tho parta.as on these sub AgraQxuont may not be =Odified, interpreted, nds. waived or revoked orally, but only by a writing signed we This Agrs ent supercade all parties.and replaces all Prior agreenents, discussions and repreaentatians an thaw zubjects, all are mexged into, and ruperseof which dad by, this Agreement. No party is entering into this Agreement on reliance on any oral or written promises, inducements, raprosontations, und$rstandings, interpretations ar agreements other than those contained in this Agreement and the Exhibits hereto. Thic Agr%4anont doQg not nuOdify Or amend the Concomitant Zoning Agreement b4n1twoan Quadrant and the City. 17. >c`�t atandin n endent Le a ounsal. Paz -ties each acknowledge, rePreacnt and agree that thoy havae read this Agreement and the Exhibits attachedr that they fvIly by uznde�starnd the terms theretof j that they havo baan their legal counsel fully advigod re, accountants and other advico" with "d t respect thereto: that they are executed by thom upon this advice and reccsmerndatiOn of their independent legal couneol. _ - 4 - 08/06/1993 13:47 FROM HILLIS CLARK TO 96614024 P.07 IN WITNESS WHEREOF' the parties have caused this Agreement to be executed as of the date first above mentioned. THE QUADRANT CORPORATION By: Walter P. Coste oio Its: Senior Vice President CITY OF FEDERAL WAY By.- JCi. 8re>�t MCF�11 Its: ty Manager ATTESTJAUTHENTICATED By: Maureen X. Swaney City Clerk Carolyn A. Lake City Attorney TOTAL P.07 08/24/93 15:01 FAI 206 646 8300 QUADRANT CORP la 002 EXHIBIT B STORM WATER DESIGN STANDARDS FOR THE QUADRANT SHOPPING CENTER PROPERTY 1. TIM QUADRANT PROPERTY: The Quadrant Property is described in Dxhibit A. When the (quadrant Property is referenced in this exhibit with respect to Storm water analysis purposes it is understood that it :refers to storm water flows from a drainage basin of approximately 25 acres, which includes drainage from some offske ar-as as well as from onsite the actual property. 2. OFFSITE POND: The Offsite Pond is generally located as shown in Exhibit _ . The Lower Dam as currently designed and permitted accommodates a tributary area of approximately 85 acres to the design of the Offsite Pond. This includes approximately 80 acres of tributary area together with approximately 5 acres for the pond itself. Approximately 17 additional acres of the 127 acre basin is the area of the Little League ball fields. Detention for this area is accommodated by the Lower Dam and therefore is not required to be included in the volume of the Offsite Pond. The design of this pond may be a single cell pond. 1 127 ACRE BASIN. This is the drainage basin at which the existing culverts under Southwest Campus Drive on the Quadrant Property is the southerly -most point. It is comprised of approximately 25 acres of basin area attributed to the Quadrant Property, approximately 102 acres of various areas north, northeast, and northwest of the Quadrant Property, including approximately 17 acres of which is the Little League ball fields and 5 acres of which is the Offsite Pond. 4. DESIGN STANDARD: The storm water design standard for the Quadrant Property is the 1990 King County Surface Water Design Manual, and any future revisions as they may be adopted by the City of Federal Way, prior to approval by the City of Federal Way of the design of the Offsite pond and/or the stormwater system for the Quadrant Property. 5. 14SPF: The design of the Offsite Pond and Quadrant Property will be performed with the runoff model Hydrologic Simulation Program -Fortran (HSPF) and the historical storms (50 year storm with the second 50 year storm magnified to simulate 100-year 08/24/93 15:02 FAX 206 646 8300 4LTADRAN'I CORP @� 003 conditions) used to size the improvements to the Panther Lake Flood Control Facility. The City of Federal way recognizes that this criteria is consistent with the requirements of the 1990 Ding County Surface Water Design Manual. Quadrant agrees to use this criteria, as required by the City of Federal Way, to be consistent with the design methodology used .in the design of the Panther Lake Flood Control Facility. 6. STORM WATER OFFSET: The Offsitc Pond may be designed to maximize compensatory storage of storm water detention volumes offset from the Quadrant Property to the extent that the dcvclaped peak flow from the entire 127 Acre Basin at the 100 year storm event will be less than or equal to the peak pre - developed flow. It is recognized that offsetting compensatory storage from the Quadrant Property to the Offsite Pend may be. limited by the height of the Lower Darn as it is currently designed or modified as described in Items 12-B., 12.C., and 12.D. herein. 7. TIGHTLM DITCH: The existing open ditch on the Quadrant Property may be replaced by a tightline pipe, sized in accordance with the design standard in Item No. 4 herein, to convey water from the existing and/or new outfall pipes from the Panther Lake Regional Facility and the Offsite Pond to the outfall under Southwest Campus Drive. S. WATER QUALITY TREATMENT: rater quality treatment for the Quadrant .Property will only be required for stormwater from the parking lot areas and other paved areas on the site. 9- OFFSITE WATER QUALITY TREATN ENT FACILITY: Water quality treatment of storm water from the Quadrant Property may be allowed off -site, such as on the west side of Southwest Campus Drive, with appropriate easements obtained by Quadrant, and that such facilities can be constructed in a manner consistent with City of Federal Way design standards. 10. ROOFTOP DRAINAGE: Rooftop drainage from buildings on the Quadrant Property will be allowed to discharge without passing through a water quality treatment facility. Detention for rooftop drainage shall be accommodated in the evaluation of the entire 127 acre basin stormwater analysis. 1 1. S.W. CAMPUS DRIVE STORM WATER: Stonnwa.ter from a portion of Southwest Campus Drive will not require water quality treatment 08'24/93 13;02 PAR 200 046 6300 QUADRANT CARP [a 004 because its location near the existing outfall under Southwest Campus Drive prevents the location of any type of water quality treatment facility. The flows from this portion of Southwest Campus Drive currently flows into the detention facility currently on the Quadrant Property as created under I.I.D. #91. 12. STORM WATER CRITERIA.: To define in more detail actual storm water design criteria and volumes for the Quadrant Property, the following evaluations and detailed design calculations are Being developed by Brown & Caldwell Consultants at Quadrants request and cost: A. Convert storm water data for the Quadrant Property from SCS Type 1A storms and the Santa Barbara Unit Hydrograph Model to the runoff model Hydrologic Simulation Program -Fortran (IiSPF) and the historical storms (50 year storm with the second 50 year storm magnified to simulate 100-year eonditions) used to size the improvements to the Panther Lake Flood Control Facility to be consistent with the design methodology used in the design of the Panther Lake Flood Control Facility. This will provide a numerical basis for defining agreed upon storm water volume detention and release criteria on the Quadrant Property. B. Evaluate. the ability of the Lower Dam in the Panther Lake Regional Facility as currently designed and permitted to accommodate detention volumes from the Off'sitc Pond in including any additional volumes that may be offset from the Quadrant Property. The City of Federal. Way has represented to The Quadrant Corporation that the CmTcnt design of the Lower Dam anticipates and includes volumes for sto exceedin he 50 e r recurrence intervaldescribe d in Para ra 11 5UL for approximately 85 acres of the 127 Acre Basin, but does not include storage for the approximately 25 acres of drainage basin for the Quadrant Property. C If the Lower Dam in the Panther Lake Flood Control Facility needs to be modified to accommodate detention volumes offset from the Quadrant Property, which rmwater detained 'n a OMite nd wills ill ver onto t I L a ue Ball Fields f r storma-maodiaL theMR S ar rccurre intcrral described in Para ra l? herein the City will use its best efforts to ensure that any modifications will be coordinated. with DOE Dam Safety Section in a timely manner, included as part of any other permits issued by the City of Federal Way or other 08/24/o3 15:03 PAX 206 646 8300 QUADRANT CORP Q 005 regulatory agencies as may be required, and to the extent possible included with the construction of the Lower Dam. The results of the effOrtS to make modifications to the Lower Darn, if roquired, will contribute to determining the amount of detention volume that Quadrant may include in the offsite pond by maximizing componsatory storage of storm water detention volumes offset from the Quadrant Property, and also to determining the necessary offsite pond easement area that needs to be acquired by Quadrant from the Little League. Quadrant will pay for any Permitting, design and construction costs associated with any modifications to the Lower Dam, if required. D Camput® the maxiMum size and location of the Offsite Pond to be located on the Littic League property, including storm water volumes offset from the Quadrant Property. 13. The City of Federal Way will inform Quadrant, in a timely manner. of any design requirements or restrictions that may apply to the design of, or the use of, the Quadrant Property as a result of the Emergency Spillway to be located on the Lower Darn north of the Quadrant Property. 08/24/93 15:03 FAX 206 646 8300 [a 006 W I ell NL BALL FtELD PROPER7,y SCALE: 1"=100' %L QUADRANT 1%z PROPERTY LOCATION MAP EXHIBIT-