Loading...
22-105233City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PINTLER Project Address: 29615 3RD PL S Mechanical FILEPermit #:22-105233-00-ME Project Description: REPLACE GAS FURNACE Inspection Request Line: (253) 835-3050 Parcel Number: 718300 0140 Owner Applicant Contractor BARBARA J PINTLER KAREN MATHENEYWASHINGTON WASHINGTON ENERGY SERVICES CO 2506 SW 325TH PL ENERGY SERVICES CO' (GENERAL) FEDERAL WAY, WA 3909 196TH ST SW WASHIES85INS (9/7/23) 98023 LYNNWOOD WA 98036 3909 196TH ST SW LYNNWOOD WA 98036 Additional Permit Information Mechanical Work Valuation?... 5700 Is this an Online or O.T.C. application? .................. Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Sunday, 14 May, 2023 Permit Issued on Tuesday, November 15, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wash' ngto an t C' y deraI Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON -SITE CITY OF 4A' Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 105233 00 Address: 29615 3RD PL S Project: LARRY R PINTLER FEDERAL WAY WA 98003-3645 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Mechanical Rough -in (4165) Q Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved By �� Date By Date By Date 1 Rough Electrical ® Final Electrical L1Right of Way Approved Approved Approved By Date By Date By Date