22-105233City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: PINTLER
Project Address: 29615 3RD PL S
Mechanical
FILEPermit #:22-105233-00-ME
Project Description: REPLACE GAS FURNACE
Inspection Request Line: (253) 835-3050
Parcel Number: 718300 0140
Owner
Applicant
Contractor
BARBARA J PINTLER
KAREN MATHENEYWASHINGTON
WASHINGTON ENERGY SERVICES CO
2506 SW 325TH PL
ENERGY SERVICES CO'
(GENERAL)
FEDERAL WAY, WA
3909 196TH ST SW
WASHIES85INS (9/7/23)
98023
LYNNWOOD WA 98036
3909 196TH ST SW
LYNNWOOD WA 98036
Additional Permit Information
Mechanical Work Valuation?... 5700 Is this an Online or O.T.C. application? .................. Yes
Mechanical Fixtures
Furnaces 1
PERMIT EXPIRES Sunday, 14 May, 2023
Permit Issued on Tuesday, November 15, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Wash' ngto an t C' y deraI Way.
Owner or agent: Date:
THIS CARD IS TO REMAIN ON -SITE
CITY OF 4A' Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 105233 00 Address: 29615 3RD PL S
Project: LARRY R PINTLER FEDERAL WAY WA 98003-3645
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0 Mechanical Rough -in (4165)
Q Gas Piping (4125)
0 Final - Mechanical (4065)
Approved
Approved to release test
Approved
By �� Date
By Date
By Date
1
Rough Electrical
®
Final Electrical
L1Right
of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date