Loading...
22-104627x City Federal Way �•�-.ice � �- of Community Development Dept. 4 t 33325 8th Ave S r Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Building - Commercial Permit #:22-104627-00-CO Inspection Request Line: (253) 835-3050 Project Name: FRED HUTCH CANCER CENTER RESEARCH TRAILER Project Address: 2141 S 314TH ST Parcel Number: 092104 9017 Project Description: BLUEBEAM - Installation of temporary factory -assembled office trailer, including stairs, landings and ramps. Building to be self-contained with water and waste tanks, and powered by generator (separate permit). Owner Applicant Contractor Lender CITY OF FEDERAL WAY OLIVER MADAYAGFRED HUTCH WILLIAMS SCOTSMAN INC 33325 8TH AVE S CANCER CENTER 901 S BOND ST SUITE 600 FEDERAL WAY WA 98023 1100 FAIRVIEW AVE N E5-110 BALTIMORE MD 21231 SEATTLE WA 98109 Census Category: 328 - New Other Non -Residential Building Includes: 41 #2 #3 #4 Occupancy Class: Construction T e: Occupancy Load: Floor Area (sq. ft.) 0.00 0.00 0.00 0.00 Additional Permit Information Mechanical to be Included? ..................................... No Plumbing Work Valuation?..................................... 0 Mechanical Work Valuation? .................................. 0 Number of Stories................................................... I Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only?.............................. No Plumbing to be Included? ........................................ No Total Valuation: 2,261.00 No Fixtures Associated With This Permit ll CONDITIONS: Fire conditions: Install a 2A IOBC rated fire extinguisher within the office. An operational permit is required for the fuel tank. This permit will be issued upon final inspucetion. PERMIT EXPIRES Wednesday, 3 May, 2023 Permit Issued on Friday, November 4, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: A, CITY OF Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 22 104627 00 Address: 2141 S 314TH ST CITY OF FEDERAL WAY FEDERAL WAY WA 98003-5621 Scheduled inspections maybe failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Footings/Setback (4110) Q Foundation Wall (4115) El Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date By Date By Date Q Re -steel (4215) 0 Slab/Concrete Floor (4255) Underfloor Framing (4285) Approved to place concrete or grout Approved to place concrete Approved to sheath floor By Date By Date By Date 0 Floor Sheathing (4105) El Shear Walls (4245) Q Roof Sheathing (4220) Approved to install flooring Approved to install siding Approved to install roofing By Date By Date By Date 10 Fire/Draft Stops (4095) [Electrical, rior to scheduling a Framing inspection; 11 Framing (4120) Plumbing & Mechanical Rough-inApprovedApproved to insulate Fire/Draft Stop inspections must be signed - By Date off and approved. IBC 109.3.4 By Date I' Insulation (4150) 13 Gypsum Wallboard Nailing (4130) 14 Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date 0 Final - S K F & R (4060) 0 Final - Planning t ] Final - Public Works (4080) Approved Approved Approved By Date By Date By Date 18 Final - Building (4050) Approved By JQ Date Z Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date ADDRESS: i. 2_% CITY OF Building Division 33325 Eighth Avenue South Federal Way Federal Way, x 98063-6325 Phone 253-835-2607 Fax 253-35-609 CORRECTION NOTICE PERMIT#:� r 10 4r 2 77 IF YOU HAVE QUESTIONS CALL (253) 835-Z6�- WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. "� Z DATE �► V INSPECTOR DO NOT REMOVE THIS NOTICE Page of City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 t It Building - Commercial Permit #:22-104627-00-CO Inspection Request Line: (253) 835-3050 Project Name: FRED HUTCH CANCER CENTER RESEARCH TRAILER Project Address: 2141 S 314TH ST Parcel Number: 092104 9017 Project Description: BLUEBEAM - Installation of temporary factory -assembled office trailer, including stairs, landings and ramps. Building to be self-contained with water and waste tanks, and powered by generator (separate permit). Owner Applicant Contractor Lender CITY OF FEDERAL WAY OLIVER MADAYAGFRED HUTCH WILLIAMS SCOTSMAN INC 33325 8TH AVE S CANCER CENTER 901 S BOND ST SUITE 600 FEDERAL WAY WA 98023 1100 FAIRVIEW AVE N E5-110 BALTIMORE MD 21231 SEATTLE WA 98109 Census Category: 328 - New Other Non -Residential Building Includes: #1 #2 43 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) 0.00 0.00 0.00 0.00 Additional Permit Information Mechanical to be Included?.,. ............... I ........... I ....... No Plumbing Work Valuation? ........................ ............. 0 Mechanical Work Valuation? ..................................... 0 Number of Stories ............... I Is this an Online or O.T.C. application?, ...... __ ...... No Permit for Building Shell Only?.............................. No Plumbing to be Included? ........................................ No Total Valuation: 2,261.00 No Fixtures Associated With This Per CONDITIONS: Fire conditions: Install a 2A lOBC rated fire extinguisher within the office. An operational i it is required for the fuel tank. This 1)erinit will be issued upon final PERMIT EXPIRES Wednesday, 3 May, 2023 Permit Issued on Friday, November 4, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of FILE the City of Federal Way. Owner or agent: Date. r— F 1 THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 104627 00 Address: 2141 S 314TH ST Project: CITY OF FEDERAL WAY FEDERAL WAY WA 98003-5621 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Footings/Setback (4110) Q Foundation Wall (4115) 3❑ Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date By Date By Date ® Re -steel (4215) 5❑ Slab/Concrete Floor (4255) © Underfloor Framing (4285) Approved to place concrete or grout Approved to place concrete Approved to sheath floor By Date By Date By Date F Floor Sheathing (4105) ❑ Shear Walls (4245) 9❑ Roof Sheathing (4220) Approved to install flooring Approved to install siding Approved to install roofing By Date By Date By Date 0 Fire/Draft Stops (4095) r to scheduling a Framing inspection; 11 Framing (4120) Approved ical, Plumbing & Mechanical Rough -in Approved to insulate Fand e/Draft Stop inspections must be signed - By Date off and approved. IBC 109.3.4 By Date 0 Insulation (4150) 13 Gypsum Wallboard Nailing (4130) Ea Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date Q Final - S K F & R (4060) El Final - Planning E7 Final - Public Works (4080) Approved Approved Approved By Date By Date By Date $ Final - Building (4050) Approved By Date t l �LJ El Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date