Loading...
22-103361Electrical f..I -� City of Federal Way Permit # 22-103361-00-EL Community Development Dept. ti.- 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PAVILION APARTMENTS BLDG 4 Project Address: 1900 SW CAMPUS DR Parcel Number: 132103 9103 Project Description: bldg 4- meter pack replacement Owner Applicant Contractor PRIME CATALINA CAMPUS DRIVE I LLC MARK JENSENINNOVATIVE SYSTEMS INNOVATIVE SYSTEMS TECHNOLOGY 50 CALIFORNIA ST SUITE 2525 TECH, INC. INC (EL 01) SAN FRANCISCO CA 94111 1402 LAKE TAPPS PKWY SE SUITE 104-147 INNOVST881B4 (1/24/24) AUBURN WA 98092 402 LAKE TAPPS PKWY SE SUITE 104-14' AUBURN WA 98092 Additional Permit Information Is this an Online or O.T.C. application? ................. Yes Electrical Fixtures Alt. Serv./Feeder: 0 to 200 ami 1 PERMIT EXPIRES Sunday, 22 January, 2023 Permit Issued on Tuesday, July 26, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of 06— JL i tJ gtoN eCity of Federal Way. �_. Owner or agent: Date' h CITY OF Federal Way PERMIT #: 22 103361 00 THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Address: 1900 SW CAMPUS DR Bldg 04 Project: PRIME CATALINA CAMPUS DRIVI FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. l UFER Ground (4295) z[� Ditch cover (4030) 3❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ® Pool Bonding (4195) 0 Temporary Power (4275) ® Service (4235) Approved Approved Approved By Date By Date By Date 0 Feeders/Sub-panels (4045) ® Rough Electrical (4225) ® Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date t° Final - Electrical (4055) Approved01, r� By Date , j A Rough Electrical Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date CITY OF Building Division 33325 Eighth Avenue South Federal Wa Federal Way, WA 98003-6325 V:�k�y Phone 253-835-2607 Fax 253-835-2609 CORRECTION NOTICE ed�ADDRESS: LL*Q S� UJ PERMIT#: A 5G- 930\ 6 �1 Gg,�i1►rL� �� r(fIG� -In /oLt/"_ �rl►�9 P IF YOU HAVE QUESTIONS CALL (253) 835- WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. 19'/6 `-Z-F _ DATE INSPECTOR DO NOT REMOVE THIS NOTICE Page of