Loading...
21-100183City of Federal way Community Development Dept. 33325 8th Ave S Federal Way, Fax 53) 3 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Project Name: DIGESTIVE HEALTH SPECIALISTS Project Address: 33915 1ST WAY S Project Description: Adding 2 doors to card access system Owner MAPLEWOOD INVESTOR GROUP LLC 3209 S 23RD ST UNIT 340 TACOMA WA 98405 Applicant BRADEN COWANROBBLEE'S TOTAL SECURITY INC 751 TACOMA AVE S TACOMA WA 98402 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Low Voltage - Other (Commel Electrical Fixtures Electrical Permit #:21-10010-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 926504 0150 Contractor ROBBLEE'S TOTAL SECURITY INC ROBBLTS994JD (4/5/21) 751 TACOMA AVE S TACOMA WA 98402 PERMIT EXPIRES We day,19 January, 2022 Permit Iss�uped on ues , January 19, 2021 I hereby certify that the above inform 'oriIn rec nd that the construction on the above described property and the occupancy and the use will iordance with the laws, rules and regulations of the State of Washl nd the City of Federal Way. Owner or agent: Date- _N� CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 100183 00 Address: Project: MAPLEWOOD INVESTOR GROUP 33915 1ST WAY S Unit 200 FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ UFER Ground (4295) 0 Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By Date ❑ Rough Electrical ❑ Final Electrical ❑ Right of Way Approved Approved Approved By Date 13► Date t3v Date