Loading...
11-101469CITY OF A�k Federal May 4, 2011 CITY HALL Way 33325 8th Avenue South Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com Mr. Craig Deaver via e-mail: cdeaver@cesnwinc.com CES NW Inc. 5210 12'' Street East Fife, WA 98424 RE: FILE #11-101469-00 AD; 180-DAY EXTENSION REQUEST - CONDITIONAL APPROVAL Soundview Manor Preliminary Plat Dear Mr. Deaver: This letter grants conditional approval of the extension to the 180-day deadline for submitting requested information for the above -referenced preliminary plat application, Federal Way file #07-103109-00-SU. This preliminary plat application, originally submitted on June 7, 2007, involves the subdivision of a difficult site with topographic issues and critical area buffers. City staff met with you and your client several times in order to provide direction for revisions to the plat layout, and we remain encouraged that your preliminary redesigns, submitted on September 29, 2010, appeared to address a number of the site challenges. Pursuant to Federal Way Revised Code (FWRC) 18.05.080, `Application Cancellation, " the Director of Community and Economic Development may grant an extension to the 180-day request for information timeline, as long as specific criteria are met.' Your letter dated April 13, 2011, does demonstrate that circumstances beyond the applicant's control prevent compliance with the 180-day time limits, that you are making substantial progress in responding to the request for information, and that you need an additional 180 days of time. Your request for an additional 180 calendar days to provide the information requested in the City's November 9, 2010, letter is approved subject to the following conditions: Conditions of approval 1. As noted in a previous extension approval letter dated August 12, 2010, with any subsequent extension, the project shall be required to comply with the storm water regulations from the 2009 King County Surface Water Design Manual (KCSWDM) and any amendments adopted by the City. This means that any resubmitted information including Technical Information Reports (TIR) and storm drainage plans shall be designed to meet standards of the 2009 KCSWDM. 2. As further noted in the August 12, 2010 extension, the project is now required to comply with the Traffic concurrency review process and Traffic Impact Fee (TIF). This means that a new concurrency review application with a $1,584.00 application fee must be submitted. The project ' The criteria are: (a) That circumstances beyond the applicant's control prevent compliance with the time limits of subsection (1) of this section; (b) That the applicant is making substantial progress in responding to the request for information so that review of the application can be furthered when that information is submitted; and (c) The number of additional calendar days necessary to provide the requested information. Mr. Deaver May 4, 2011 Page 2 is also now subject to traffic impact fee (TIF) mitigation per FWRC 19.91. Note that the TIF mitigation replaces the previous pro-rata share mitigation amount of $157,506. As provided under FWRC 18.05.080, all information that was requested by the City in their November 9, 2010 letter, the above noted conditions of approval; and concurrency review application and applicable fees shall be submitted no later than November 7, 20112 or the preliminary plat application shall be determined to be null and void. Please contact Senior Planner Deb Barker, at 253-835-2642 or deb.barker@cityoffederalway.com should you have any questions about this letter. Sincerely, Isaac Conlen, Planning Manager For Patrick Doherty, Director c: Ken Miller, Deputy Public Works Director Deb Barker, Senior Planner Ann Dower, Senior Engineering Plans Reviewer Sarady Long, Senior Transportation Engineer Brian Asbury, Lakehaven Utility District Chris Ingham, South King Fire and Rescue 2 The November 9, 2010 letter requested that information be submitted within 180 days of the date of that letter, or by May 9, 2011. Saturday, November 5, 2011 is 180 days from May 9, 2011. As City Hall is closed on Saturdays, the requested information shall be submitted no later than Monday, November 7, 2011. 11-101469 Doc ID 57545 C*EeS*Nw,nc. Gpil Engineering & S► nvjing April 13, 2011 Deb Barker, Senior Planner City of Federal Way 33325 8`h Ave South PO Box 9718 Federal Way, WA 98063-9718 �"CINO - A/0 310 29th Street NE, Suite I i Puyallup,WA 983' Phone: (253) 848-421 Fax:(253) 848-42' Project: Soundview Manor #07-103109-00-SU (CES #05170.0) Subject: Preliminary Plat Permit Extension Dear Deb, I am writing this letter to request a 180 day time extension for the preliminary plat of Soundview Manor. As you aware we have worked through and resolved many of the issues with this project. However several issues still remain to be addressed. My client and I continue to believe the Soundview Manor project is viable even in these tough economic times. Per your e-mail you requested the extension request conform to the Federal Way municipal code section 18.05.080 (2) Extension request. I have broken each section down as follows. (a) That ebrumstance beyond the applicant- control prevent compliance with the time limits of subsection (1) of this section; The preliminary plat layout has been modified several times to comply with city requests. I believe we now have a layout that is in an acceptable format to the city. However all the reports need updating to address the reduced number of lots. Some of the original consultants on this project no longer exist and therefore it has taken longer to address the issues out line in the November 9"' 2010 letter. (b) That the applicant is making substantial p,,ogress in responding to the requestfir information so that review of the application can be furthered when that information is submitted; The revised preliminary plat layouts have essentially been approved by city staff. This opinion is based on the comments from the November 9, 2010 letter. The remaining work consists of updating the geotechnical, storm, traffic and wetland reports. (c) The Number of additional calendar days necessary to provide the requesled information. We request 180 additional days to complete the necessary information. Please contact me with any questions or concerns. Sincerely ra eaver P cipal c: Jerry Mahan RESUBMITTED RECEIV APR 14 2011 CITY OF FEDERAL WAY CDS APR IJ 2011 F FEDERAL WAY CDS /� - _, ltj q&q,h1J DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES R ES U B M I17E D 33325 8`h Avenue South Federal Way, WA 98003-6325 CITY OF 253-835-2607; Fax 253-835-2609 Federal Way APR 14 2011 «ww.cityoffederal%vay.com CITY OF FEDERAL WAY CDS RESUBMITTAL INFORMATION This completed form MUS T accompany all resubmittals. "Pleasenote.- Additional or revised plans or documents for an active project will not be accepted unless accompanied by this completed form. Mailed resubmittals that do not include this form or that do not contain the correct number of copies will be returned or discarded. You are encouraged to submit all items in person and to contact the Permit Counter prior to submitting ifyou are not sure about the number of copies required. ** ANY CHANGES TO DRAWINGS MUST BE CLOUDED. Project Number: C Project Name: hY )J �J I l ie �� rl <i b � �! Project Address: Project Contact: _ y -i [a �� IB C Phone: 3 7,� .XT Z RESUBMITTED ITEMS: # of Copies ** Detailed Description of Item ** Always submit the same number of copies as required foryour initial application.** Resubmittal Requested by (Stab Letter Dated: fVfember) RESUB A- l Dept/Div Name Building Planning PW Fire Other OFFICE USE Oft Y Distribution Data: ­+A4 By.: # I Description Bulletin #129—January 1, 2011 Page 1 of l k:\Handouts\Resubmittal Information CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: April 18, 2011 TO: Ann Dower, Senior Engineering Plans Reviewer Sarady Long, Senior Transportation Engineer Scott Sproul, Plans Examiner Brian Asbury, Lakehaven Utility District Chris Ingham, South King Fire & Rescue FROM: Deb Barker REPLY BY: April 28, 2011 FILE NUMBER(s): 11-101469-00-AD RELATED FILE NOS.: 07-103109-SU PROJECT NAME: SOUNDVIEW MANOR 180 DAY EXTENSION REQUEST ZONING DISTRICT: RS 9.6 PROJECT DESCRIPTION: Written request for an additional 180 days to submit requested information. The city had requested additional information in a November 9, 2010 letter following receipt of revised site plan layout. LAND USE PERMITS: Preliminary Plat, SEPA PROJECT CONTACT: Craig Deaver CES NW Inc. 310 29th Street NE, Suite 101 Puyallup, WA 98372 253-848-4282 MATERIALS SUBMITTED: ■ Letter dated April 13, 2011 requesting an additional 180 days to turn in requested information ll- 1Ny69- Ap C*E*So NW Inc. Cirri! Egineeting & Surveying April 13, 2011 Deb Barker, Senior Planner City of Federal Way 33325 8t` Ave South PO Box 9718 Federal Way, WA 98063-9718 Project: Soundview Manor #07-103109-00-SU (CES #05170.0) Subject: Preliminary Plat Permit Extension Dear Deb, 310 29th Street NE, Suite 101 Puyallup,WA 98372 Phone: (253) 848-4282 Fax:(253) 848-4278 I am writing this letter to request a 180 day time extension for the preliminary plat of Soundview Manor. As you aware we have worked through and resolved many of the issues with this project. However several issues still remain to be addressed. My client and I continue to believe the Soundview Manor project is viable even in these tough economic times. Per your e-mail you requested the extension request conform to the Federal Way municipal code section 18.05.080 (2) Extension request. I have broken each section down as follows. (a) That circumstance beyond the applicant's control prevent compliance ndth the time limits of subsection (1) of this section; The preliminary plat layout has been modified several times to comply with city requests. I believe we now have a layout that is in an acceptable format to the city. However all the reports need updating to address the reduced number of lots. Some of the original consultants on this project no longer exist and therefore it has taken longer to address the issues out line in the November 9 h 2010 letter. (b) That the applicant is making substantialprogress in responding to the request for information so that review of the application can be furthered when that information is submitted; The revised preliminary plat layouts have essentially been approved by city staff. This opinion is based on the comments from the November 9, 2010 letter. The remaining work consists of updating the geotechnical, storm, traffic and wetland reports. (c) The Number of additional calendar days necessary to provide the requested information. We request 180 additional days to complete the necessary information. Please contact me with any questions or concerns. Sincerely eaver P ' cipal c: Jerry Mahan RESUBMITTED RECEIV APR 14 2011 CITY OF FEDERAL WAY CDS APR V 2011 FEDERAL WAY CDS May 3, 2011 Mr. Craig Deaver CES NW Inc. 5210 12t' Street East Fife, WA 98424 e-10, OPTION #2 —approve it DRAFT via e-mail: cdeaver@cesnwinc.com RE: FILE #10-102950-00 AD; CONDITIONAL APPROVAL TO THE 90-DAY EXTENSION REQUEST, Soundview Manor Preliminary Plat Dear Mr. Deaver: This letter grants conditional approval of the extension to the 180 day deadline for submitting requested information above -referenced preliminary plat application, City file #07-103109-00-SU. The preliminary plat application which was submitted on June 7, 2007, involves development of a challenging site with topographic issues and critical area buffers. City staff met with you and your client several time to provide direction for revisions to plat layout, and we remain encouraged that your preliminary redesigns appeared to address a number of site challenges. Pursuant to Federal Way Revised Code (FWRC) 18.05.080, `Application Cancellation, " the Director of Community and Economic Development may grant an extension to the 180-day request for information timeline, as long as specific criteria are met 3 Your request does demonstrate that circumstances beyond the applicant's control prevent compliance with the 180-day time limits and that the applicant is making substantial progress in responding to the request for information. Your request for an additional 180 calendar days to provide the requested information is hereby CONDITIONALLY approved. Conditions of approval 1. As noted in the extension dated ***, 2010, with this extension, the project shall be required to comply with the storm water regulations of 2009 KCSWDM and amendments to the manual adopted by the City. This means that any resubmitted information including TIR and storm drainage plans shall meet standards of the 2009 KCSWDM. 2. As noted in the extension dated ***, 2010, with this extension, the project is now required to comply with concurr ncy and traffic mitigation. Th's means that a concuency application must be submitted. (c ,� � -L-� -� - As provide under (FWRC) 18.05.080, all specific information requested by the City on November 9, 2010; the above noted conditions of approval; and concurrency applications and applicable fees shall be 3 (a) That circumstances beyond the applicant's control prevent compliance with the time limits of subsection (1) of this section; (b) That the applicant is making substantial progress in responding to the request for information so that review of the application can be furthered when that information is submitted; and (c) The number of additional calendar days necessary to provide the requested information. Doc. I.D. submitted no later than November 11, 20114 or the preliminary plat application shall be determined to be null and void. Please contact Senior Planner Deb Barker, at 253-835-2642 or deb.barker@cityoffederalway.com should ou -}=gave any questions about this letter. ]1 ..]�3 .i p . - - Sincerely, Isaac Conlen, Planning Manager For Patrick Doherty, Director 4 180 days from the date of the request deadline. Doc. I.D. 11--lo1y(�- Ap CES NWlnc. Civil'rNple,"N, & sm" pq April 13, 2011 Deb Barker, Senior Planner City of Federal Way 33325 a Ave South PO Boa 9718 Federal Way, WA 98063-9718 Project: Soundview Manor #07-103109-00-SU (CES #05170.0) Subject: Preliminary Plat Permit Extension Dear Deb, 310 29th Street NE. Suite 101 Puyallup,WA 98372 Phone: (253) 848-4282 Faz:(253) 848-4278 I am writing this letter to request a 180 day time extension for the preliminary plat of Soundview Manor. As you aware we have worked through and resolved many of the issues with this project. However several issues still remain to be addressed. My client and I continue to believe the Soundview Manor project is viable even in these tough economic times. Per your e-mail you requcsted the extension request conform to the Federal Way municipal code section 18.05.080 (2) Extension request. I have broken each section down as follows. (a) That rrrrerrrrrtance beyond the rpflrcurt$ cnniml prevent compliance with the time limits of subsection (1) of this section; The preliminary plat layout has been moclified several times to comply with city requests I believe we now have a layout that is in an acceptable format to the city. However all the reports need updating to address the reduced number of lots. Some of the original consultants on this project no longer exist and therefore it has taken longer to address the issues out line in the November 9's 2010 letter. (b) That the applicant zr making substanrral pmgross in re ponding to the request for information so That review of the app&ation can be furthered when that information is-whmiwed; The revised preliminary plat layouts have essentially been approved by city staff. This opinion is based on the comments from the November 9, 2010 letter. The remaining work consists of updating the geotechnieal, storm, traffic and wetland reports. (c) The Number of additional calendar days necessary to pmvide the rrgtusted information. We request 180 additional days to complete the necessary information. Please contact me with any questions or concerns Sincerely eaver � ripal c: Jerry Mahan RESUBMITTED RECEIV APR 14 2011 CITY OF FEDERAL WAY CDS APR 1X 2011 FEDERAL WAY CDS Doc. I.D. As noted in the extension dated August 12, 2010, with this extension, the project is now required to comply with concurrency review process and the traffic impact fee (TIF). This means that a new concurrency review application with $1,584.50 application fee must be submitted. The project is also subject to traffic impact fee mitigation per FWRC 19.91. The traffic impact fee (TIF) mitigation replaced the previous pro-rata share mitigation of $157,506.