Loading...
23-100050City of Federal Way i ;,"m� Community Development Dept I L 11'7 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (2535 835-2609 Project Name: GALLIANO Project Address: 29916 2ND AVE SW Project Description: replace gas furnace Mechanical Permit #:23-100050-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 513700 0070 Owner Applicant Contractor RONALD GALLIANO GREENWOOD HEATING AND A/C GREENWOOD HEATING (GENERAL) 28724 REDONDO BEACH DR S 825 S STACY ST GREENHA922U7(2/3/25 DES MOINES WA SEATTLE WA 98134 825 S STACY ST 98198-8236 SEATTLE WA 98134 Additional Permit Information Mechanical Work Valuation? .................................. 5000 Is this an Online or O.T.C. application?.................. Yes Furnaces I PERMIT EXPIRES Tuesday, 4 July, 2023 Permit Issued on Thursday, January 5, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the w�i be in accordance_witt)- the laws, rules and regulations of the State of i`{on anc't1c,�Cty of Federal Way. Owner or agent: o- A Date: THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 a PERMIT #: 23 100050 00 Address: 29916 2ND AVE SW Project: ELISABETTA GALLIANO FEDERAL WAY WA 98023-3508 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By -A() Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date