Loading...
21-102740City 0 der ! 1V�r Cummaniry be5.e1epMow cpt. 33325 8r11 Ave S Fedtrw Way, LVq 98003 Ph: (253) M5.2807 Fes; {z) 5-2609 Project Name: RUIZ Project Address: 652 S 305TH ST Project Description: Service Change Owner 10NATHAN RUIZ 652 S 305TH ST FEDERAL WAY WA 98003 Permit #:21-10 Electrical FILE 2740-00-EL Inspection Request q st Line: (253) 835_3050 6P fiean CHIN -SUP KIMCHJN'S ELECTRIC LLC 34102 13 TH PL SW FEDERAL WAY WA 98023 Is this Additional Permit Inform an Online or O.T.C. application?...... atlOn Parcel Number: 232950 0190 Contra CHIN'S ELECTRIC LLC CHINSEL908BD (ill7/22) 34102 I3TH PL SW FEDERAL WAY WA 98023 Alt. Serv./Feeder: 0 to 200 aml I Electric res PERMIT EEC Permiflssue Thursday, 7Ju1Y a � ��pn V�'ednesday, duly 2 I hereby certify that the above inform and the occupancy and the use will a in accordance with t e laws rules antion d the above described property Washington and the City o regulations of the State of Owner or agent: ral Way. Date: CITY or A Federal 111/ay THIS CARD IS To REMAIN ON -SITE Construction InspeCtion Recor .INSPECTION REQUESTS: {253} 835-305p d PERMIT #: 2110274000 Project: JENINE Address: 652 S 305TH ST Scheduled ins MARIE RUIZ (read left to right ttop [o hot onn). lea tills card is not on -site. FEDERAL You are unsure about an ) p,, SC schedule inspections asDD SIN 'I I OSG WAY WA 98003-4021 y ofthe inspections or the inspection sequence. On- TNI5 must not inspections are listed appropriate. Work must not be covered until jt is a � close 0 going inspections are to W SeRt+entlaI order as possible UFER Ground (4295) 2 gged on the back of this and %vidl your inspector if heck Approved ❑ Ditch cover (4030) By Date Approver{ ❑ Slab/Concrete Floor (4255) ❑Date BY Approved to lace concrete 4 Pool Bonding (4195) ❑ BY P APProved TemporaryDate By Power (4275) g Y Date Approved ❑ Service (4235) ❑ By Date APProved By $ panels (4045) ® Y ate 0 -� D� 1 Approved Rough Electrical (4225) ❑ By Date Approved Ceiling Cover (4020) 10 Final -Electrical (4055) By Date BY Approved Approved Date By Date ❑ Rough Electrical Approved ❑ Final Elect riC$l By Date B Approved ❑ Right of way y Date APProved l3� Date