Loading...
21-101783e-- , City of Federal Way Cornmunity Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Electrical Permit #:21-101783-00-EL +�=! 'Inspection Request Line: (253) 835-3050 Project Name: MIRROR LAKE HIGHLAND LOT 16 Project Address: 30925 6TH LN SW Project Description: temp power pole Parcel Number: 555790 0160 Owner Applicant Contractor WILLIAM MCCAFFREYMIRROR LAKE DENNIS ROSSADVANCED HEATING & ADVANCED HEATING & ELECTRICAL HIGHLAND LLC ELECTRICAL SOLUTIONS LLC SOLUTIONS LLC (ELECTRICAL) 30929 37TH PL SW 16415 211TH ST E ADVANHS8401N (4/25/22) FEDERAL WAY WA 98023 GRAHAM WA 98338 PO BOX 1004 ORTING WA 98360 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures New Service: Residential 1 PERMIT EXPIRES Thursday, 5 May, 2022 Permit Issued on Wednesday, May 5, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wash in ton a rlid e i of,Federal Way. Owner or agent: Date: _11;k CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 101783 00 Address: 30925 6TH LN SW Project: WILLIAM J MCCAFFREY FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El UFER Ground (4295) Q Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date �� ��,� By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date El Final- Electrical(4055) Approved By Date ❑ Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date