Loading...
23-100136City of Federal Way FILL Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: NITU Project Address: 29909 20TH AVE S Electrical Permit #:23-100136-00-EL Inspection Request Line: (253) 835-3050 Project Description: New Power supply location pole mount transformer on pole Parcel Number: 367430 0090 Owner Applicant Contractor CORNELIU NITU DAVID STANDRINGCANNON CANNON CONSTRUCTION 29909 20TH AVE S CONSTRUCTION LLC (ELECTRICAL 01) FEDERAL WAY WA 98003 406 N PORTER WAY CANNOCL794IN (4/26/23) MILTON WA 98354 406 PORTER WAY MILTON WA 98354 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes New Service: 0 - 100 amps (C( Electrical Fixtures PERMIT EXPIRES Saturday, 29 July, 2023 Permit Issued on Monday, January 30, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of a offf-INF and the City of Federal Way. Owner or a ent Date: 1 CITY I" A� Federal Way THIS CARD IS TO RENLU ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. D. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. 'Pork must not be cohered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL Q UFER Ground (4295) ❑ Ditch cover (4030) El Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) 0 Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By or,,f Date —2, Z MECHANICAL Q Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date